| Research on cut gob-side entry retaining in thin coal seam of Tangshan ditch |
| ZHANG Guofeng1,2,XU Youqing3,GE Pengtao3 |
(1. School of Civil and Architecture Engineering,China University of Mining and Technology,Beijing 100083,China;
2. State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,
Beijing 100083,China;3. Shanxi New Tangshan Ditch Coal Limited Company,Datong,Shanxi 037002,China)
|
|
|
|
|
Abstract The triangle hanging plate is easily formed and hard to fall if the caving zone contains the thick and hard stratum,which produces high pressure to the gob-side entry retaining. The 8820 coalface mining without pillars with the thick and hard sandstone roof at Tangshangou in Datong was studied. The difference of cracked structural feature between ordinary filling entry retaining and joint-cutting gob-side entry retaining roof was analyzed. The deformation process of surrounding rock was investigated. The joint-cutting with the reasonable parameter of hard stratum roof in the caving zone resulted in the lost of the constraint of the direct roof and basic roof at the gob-side boundary in the range of the joint-cutting height. The hanging plate was sheared enough to fall off the roof along the structural surface of joint-cutting,and the impact load was reduced. The results of the numerical analysis with the software UDEC indicated that the joint-cutting was beneficial to the waste rock fall and supported the stratum covered above. The joint-cutting moved forward the touch point of the waste rock of the stratum covered above basic roof,limited the rotation of the basic roof and the pressure of surrounding rock caused by the sink action and reduced the deformation of the surrounding rock obviously. The test under the well suggested that the complex techniques of high constant resistance and large deformation anchor rope of roof,the dense pillar reinforced on the side of tunnel,the dense block rock point pillar and the technology of advanced focused power blast of joint-cutting could cut the roof on the gob-side effect and form a complete tunnel that every index could satisfy the requirement of working surface.
|
|
|
|
|
|
[1] 钱鸣高,石平五,许家林. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社,2010:65–99.(QIAN Minggao,SHI Pingwu,XU Jialin. Ground pressure and strata control[M]. Xuzhou:China University of Mining and Technology Press,2010:65–99.(in Chinese))
[2] 宋振骐. 实用矿山压力[M]. 徐州:中国矿业大学出版社,1988:41–78.(SONG Zhenqi. Practical ground pressure[M]. Xuzhou:China University of Mining and Technology Press,1988:41–78.(in Chinese))
[3] 马立强,张东升,王红胜,等. 厚煤层巷内预置充填带无煤柱开采技术[J]. 岩石力学与工程学报,2010,29(4);675–679.(MA Liqiang,ZHANG Dongsheng,WANG Hongsheng,et al. Mining technology with preset packing body in roadway for thick coal seam without coal pillars[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(4):675–679.(in Chinese))
[4] 康红普,牛多龙,张 震,等,深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报,2010,29(10):1 978–1 987.(KANG Hongpu,NIU Duolong,ZHANG Zhen,et al. Deformation characteristic of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 978–1 987.(in Chinese))
[5] 唐建新,胡 海,涂兴东. 普通混凝土巷旁充填沿空留巷试验[J].煤炭学报,2010,35(9):1 425–1 429.(TANG Jianxin,HU Hai,TU Xingdong. Experiment on roadside packing gob-side retaining for ordinary concrete[J]. Journal of China Coal Society,2010,35(9): 1 425–1 429.(in Chinese))
[6] 柏建彪,周华强,侯朝炯,等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报,2004,33(2):183–186.(BAI Jianbiao,ZHOU Huaqiang,HOU Chaojiong,et al. Development of support technology beside roadway in goaf-side entry retaining for next sublevel[J]. Journal of China University of Mining and Technology,2004,33(2):183–186.(in Chinese)))
[7] 张 农,张志义,吴 海,等. 深井沿空留巷扩刷修复技术及应用[J]. 岩石力学与工程学报,2014,33(3);468–474.(ZHANG Nong,ZHANG Zhiyi,WU Hai,et al.Technology and application of reparation in deep gob-side entry retaing[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):468–474.(in Chinese))
[8] 郭育光,柏建彪,侯朝炯. 沿空留巷巷旁充填体主要参数研究[J]. 中国矿业大学学报,1992,21(4):1–11.(GUO Yuguang,BAI Jianbiao,HOU Chaojiong. Study on the main parameters of gateside packs in gateways maintained along gob-edges[J]. Journal of China University of Mining and Technology,1992,21(4):1–11.(in Chinese))
[9] 华心祝,马俊枫,许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机理研究及应用[J]. 岩石力学与工程学报,2005,24(12):2 107–2 112.(HUA Xinzhu,MA Junfeng,XU Tingjiao. Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2 107–2 112.(in Chinese))
[10] 孙春东,冯光明. 新型高水材料巷旁充填沿空留巷技术[J]. 煤矿开采,2010,15(1):58–70.(SUN Chundong,FENG Guangming. Technology of retaining roadway along gob by stowing with high-water-content material[J]. Coal mining Technology,2010,15(1):58–70.(in Chinese))
[11] 李化敏,牛多龙,张 震. 沿空留巷顶板岩层控制设计[J]. 岩石力学与工程学报,2000,19(5):651–654.(LI Huamin,NIU Duolong,ZHANG Zhen. Control design of roof rocks for gob-side entry[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(5):651–654.(in Chinese))
[12] 张国锋. 切顶卸压沿空成巷机理及关键技术研究[博士学位论文][D]. 北京:中国矿业大学,2010.(ZHANG Guofeng. Research on the Technical Principle of Gobe-side Entry Formed by Broken Roof Caving with Pressure Relief about the Coal Face and its Engineering Application[Ph. D. Thesis][D]. Beijing:China University of Mining and Technology,2010(in Chinese))
[13] 黄艳利,张吉雄,巨 峰. 巷旁充填沿空留巷技术及矿压显现规律[J]. 西安科技大学学报,2009,29(5):515–520.(HUANG Yanli,ZHANG Jixiong,JU Feng. Technology of roadside packing in gob-side entry retaining and law of rock pressure[J]. Journal of Xi?an University of Science and Technology,2009,29(5):515–520.(in Chinese))
[14] 王茂盛,王 萌,都海龙. 厚层坚硬顶板工作面沿空留巷技术[J]. 煤炭科学技术,2013,41(6):42–45.(WANG Maosheng,WANG Meng,DU Hailong. Gateway retained technology along goaf of coal mining face with thick and hard roof[J]. Coal Science and Technology,2013,41(6):42–45.(in Chinese))
[15] 于 斌,刘长友,杨敬轩. 坚硬厚层顶板的破断失稳及其控制研究[J]. 中国矿业大学学报,2013,42(3):342–348.(YU Bin,LIU Changyou,YANG Jingxuan. Research on the fracture instability and its control technique of hard and thick roof[J]. Journal of China University of Mining and Technology,2013,42(3):342–348.(in Chinese))
[16] 韩贵雷,韩立军,王延宁. 厚层复合石灰岩顶板垮落特性试验研究[J]. 采矿与安全工程学报,2007,24(1):60–64.(HAN Guilei,HAN Lijun,WANG Yanning. Experimental study of collapsing characteristic of thick complex limestone roof[J]. Journal of Mining and Satety Engineering,2007,24(1):60–64.(in Chinese)))
[17] 郭建伟,赵家巍. 沿空留巷下位顶板破断规律与控制机理研究[J]. 采矿与安全工程学报,2012,29(6):802–806.(GUO Jianwei,ZHAO Jiawei. Study on breaking law and control mechanism of lower roof in gob-side entry retaining[J]. Journal of Mining and Satety Engineering,2012,29(6):802–806.(in Chinese))
[18] 史 红,姜福兴. 综放采场上覆岩厚层坚硬岩层破断规律的分析及应用[J]. 岩土工程学报,2006,28(4):525–528(SHI Hong,JIANG Fuxing. Analysis on rupture of hard and massive overlying strata in fully-mechnized sublevel caving face[J]. Chinese Journal Geotechnical Engineering,2006,28(4):525–528.(in Chinese))
[19] 蒋斌松,张 强,韩立军. 采动岩层荷载计算方法修正[J]. 煤炭学报,2007,32(6):581–585.(JIANG Binsong,ZHANG Qiang,HAN Lijun. Modification of calculation method for the load of mining- induced strata[J]. Journal of China Coal Society,2007,32(6):581–585.(in Chinese))
[20] 谭云亮,蒋金泉. 采场坚硬顶板断裂步距的板极限分析[J]. 山东矿业学院学报,1989,8(3):21–26.(TAN Yunliang,JIANG Jinquan. The plate limit analysis of the fracture length of hard roof back of the coalface[J]. Journal of Shandong Mining Institute,1989,8(3):21–26.(in Chinese)) |
| [1] |
LI Botao1, 2, 3, TAN Yuxuan1, LIN Haifei4, 5*, WEI Jianping1, 2, 3, ZHANG Hongtu1, 2, 3, LI Shugang4, 5, WEI Zongyong4, 5, WANG Pei4, LUO Rongwei4, LIU Yanwei1, 2, 3. Mechanical properties and mesoscopic damage evolution of coal under liquid-nitrogen freezing at different initial temperatures[J]. , 2026, 45(6): 1757-1772. |
|
|
|
|