|
|
|
| Calculation method of landslide thrust considering the reaction force of piles and factor of safety—implicit solution using transfer coefficient |
| ZHAO Shangyi1,2,ZHENG Yingren1,AO Guiyong3 |
| (1. Department of Civil Engineering,Logistical Engineering University,Chongqing 401311,China;2. the Chongqing Key Laboratory of Rock and Soil Mechanics and Geological Environment Protection,Logistical Engineering University,Chongqing,401311,China;3. China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu,Sichuan 610031,China) |
|
|
|
|
Abstract A simplified method for estimating the landslide lateral loads acting on the stabilizing piles,called unbalanced lateral load transfer method,has been used for decades in China. However,the method do not consider the reaction force of piles in the force components acting on a typical slice,which may result in calculation errors. This paper presents a modified formula based on the unbalanced lateral load transfer method. The horizontal reaction force of pile is added into the force components acting on a typical slice. In this way,the horizontal lateral loads acting on the stabilizing piles can be estimated through the strength reduction(the reduction method is equal to the target factor) based on the force equilibrium analysis. As a result,the estimated stability factor of safety of landslide reinforced by stabilizing piles is equal exactly to the target factor of safety.
|
|
|
|
|
|
[1] ITO T,MATSUI T. Methods to estimate lateral force acting on stabilizing piles [J]. Soils and Foundations,1975,15(4):43–59.
[2] ITO T,MATSUI T,HONG W P. Design method for stabilizing piles against landslide–one row of piles[J]. Soils and Foundations,1981,21(1):21–37.
[3] REESE L C,WANG S T,FOUSE J L. Use of drilled shafts in stabilizing a slope[C]// Proceedings of Stability and Performance of Slopes and Embankments. [S. l.]:[s. n.],1992:1 318–1 332.
[4] POULOS H G. Design of reinforcing piles to increase slope stability[J]. Canadian Geotechnical Journal,1995,32(5):808–818.
[5] ZENG S,LIANG R. Y. Stability analysis of drilled shafts reinforced slope[J]. Soils and Foundations,2002,42(2):93–102.
[6] LIANG R. Y. Field instrumentation,monitoring of drilled shafts for landslide stabilization and development of pertinent design method[J]. Publication FHWA/OH–2010/15,DOT,Columbus,OH. 2010.
[7] LIANG,R. Y.,LI,L. Design method for slope stabilization using drilled shafts[C]// Proceedings of the International Conference on Ground Improvement and Ground Control. Singapore:Research Publishing,2012:1 475–1 480.
[8] WANG X B,RAMLY H E,PROUDFOOT D,et al. Alberta highway 858:02 embankment stabilization-geotechnical investigation,design,and construction[C]// Proceedings of Landslides and Engineered Slopes:Protecting Society through Improved Understanding. London:[s.n.],2012:1 509–1 514.
[9] 中华人民共和国国家标准编写组. GB50330—2013建筑边坡工程技术规范[S]. 北京:中国建筑工业出版社,2013.(The National Standards Compilation Group of People?s Republic of China. GB50330—2013 Technical code for building slope engineering[S]. Beijing:China Architecture and Building Press,2013.(in Chinese))
[10] 中华人民共和国行业标准编写组. JTG D30—2015公路路基设计规范[S]. 北京:人民交通出版社,2015.(The Professional Standards Compilation Group of People?s Republic of China. JTG D30—2015 Code for design of highway subgrade[S]. Beijing:China Communications Press,2015.(in Chinese))
[11] 中华人民共和国行业标准编写组. TB10025—2006铁路路基支挡结构设计规范[S]. 北京:中国铁道出版社,2009.(The Professional Standards Compilation Group of People?s Republic of China. TB10025—2006 Code for design of retaining structures on railway subgrade[S]. Beijing:China Railway Publishing House,2009.(in Chinese))
[12] 中华人民共和国行业标准编写组. SL386—2007水利水电工程边坡设计规范[S]. 北京:中国水利水电出版社,2007.(The Professional Standards Compilation Group of People?s Republic of China. SL386—2007 Design code for engineered slopes in water resources and hydropower projects[S]. Beijing:China Water Power Press,2007.(in Chinese))
[13] 中华人民共和国国家标准编写组. GB50021—2001岩土工程勘察规范[S]. 北京:中国计划出版社,2009.(The National Standards Compilation Group of People?s Republic of China. GB50021—2001 Geotechnical engineering survey specifications[S]. Beijing:China Planning Press,2009.(in Chinese))
[14] 沈尧亮,侯殿英. 传递系数法的原型与衍生[J]. 工程勘察,2010,(增1):477–485.(SHEN Yaoliang,HOU Dianying. Transfer coefficient method of prototype and derivatives[J]. Chinese Journal of Geotechnical Investigation and Surveying,2008,(Supp.1):477–485.(in Chinese))
[15] 徐邦栋. 滑坡检算[J]. 土木工程学报,1960,(2):26–35.(XU Bangdong. Landslide stability evaluation[J]. Chinese Journal of Journal of Civil Engineering,1960,(2):26–35.(in Chinese))
[16] 顾宝和,毛尚之. 滑坡稳定分析传递系数法的讨论[J]. 工程勘察,2006,(12):8–11.(GU Baohe,MAO Shangzhi. Discussion on transfer coefficient method for landslide stability analysis[J]. Chinese Journal of Geotechnical Investigation and Surveying,2006,(12):8–11.(in Chinese))
[17] 张苏民,张旷成. 滑坡稳定性检算中几个问题的探讨[J]. 岩土工程技术,2008,22(6):271–276.(ZHANG Sumin,ZHANG Kuangcheng. Probe into landslide stability evaluation[J]. Geotechnical Engineering Technology,2008,22(6):271–276.(in Chinese))
[18] 郑颖人,时卫明,刘文平,等. 三峡库区滑坡稳定分析中几个问题的研究[J]. 重庆建筑,2005,(6):6–17.(ZHENG Yingren,SHI Weiming,LIU Wenping,et al. Study on several problems of landslide stability analysis in the Three Gorges Reservoir Area[J]. Chongqing Architecture,2005,(6):6–17.(in Chinese))
[19] 陈祖煜. 水利水电工程中的滑坡和防治[J]. 重庆建筑,2005,(6):22–29.(CHEN Zuyu. Landslide and prevention in water conservancy and hydropower projects[J]. Chongqing Architecture,2005,(6):22–29.(in Chinese))
[20] 时卫民,郑颖人,唐伯明. 滑坡稳定性评价方法的探讨[J]. 岩土力学,2003,24(4):545–548.(SHI Weiming,ZHENG Yingren,TANG Baiming. Discussion on evaluation method of landslide stability[J]. Chinese Journal of Rock and Soil Mechanics,2003,24(4):545–548.(in Chinese))
[21] 和海芳,祁生文,伍法权,等. 抗滑桩设计推力计算方法研究[J].工程地质学报,2008,16(5):695–698.(HE Haifang,QI Shengwen,WU Faquan,et al. Calculation method of designed thrust for anti-slide piles[J]. Chinese Journal of Engineering Geology,2008,16(5):695–698.(in Chinese))
[22] 方玉树. 边坡支护结构荷载取值问题研究[J]. 工程地质学报,2008,16(2):190–195.(FANG Yushu. Stability based method for deterring loading on retaining structures of slopes[J]. Chinese Journal of Engineering Geology,2008,16(2):190–195.(in Chinese))
[23] 赵尚毅,郑颖人,王建华,等. 基于强度折减安全系数的边坡岩土侧压力计算方法探讨[J]. 岩石力学与工程学报,2010,29(9):1 760– 1 766.(ZHAO Shangyi,ZHENG Yingren,WANG Jianhua,et al. Discussion on calculation method of slope rock-soil lateral pressure based on factor of safety with strength reduction[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(9):1 760–1 766.(in Chinese))
[24] 赵尚毅. 有限元强度折减法及其在岩坡与土坡中的应用[博士学位论文][D]. 重庆:后勤工程学院,2005.(ZHAO Shangyi. Strength reduction finite element method and its application in soil and rock slope[Ph. D. Thesis][D]. Chongqing:Logistical Engineering University,2005.(in Chinese)) |
|
|
|