| [1] |
马洪琪,曹克明. 超高面板坝的关键技术问题[J]. 中国工程科学,2007,9(11):4-10.(MA Hongqi,CAOKeming. Key technology of supper-high CFRD[J]. Engineering Sciences,2007,9(11):4-10.(in Chinese))
|
| [2] |
米占宽,李国英,陈生水,等. 基于堆石体二元介质模型的面板坝数值计算[J]. 岩石力学与工程学报,2008,27(增1):2 772-2 778. (MIZhankuan,LIGuoying,CHENShengshui,et al. Numerical calculation of CFRD based on binary medium model of rockfill[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):2772-2778.(in Chinese))
|
| [3] |
曹克明,汪易森,徐建军,等. 混凝土面板堆石坝[M]. 北京:中国水利水电出版社,2008:147.(CAOKeming,WANG Yisen,XUJianjun,et al. Concrete face rockfill dam[M]. Beijing:China Water Power Press,2008:147.(in Chinese))
|
| [4] |
郦能惠,杨泽艳. 中国混凝土面板堆石坝的技术进步[J]. 岩土工程学报,2012,34(8):1 361-1 368.(LINenghui,YANGZeyan. Technical advances in concrete face rockfill dams in China[J]. Chinese Journal of Geotechnical Engineering,2012,34(8):1 361-1 368.(in Chinese))
|
| [5] |
胡 耘,张 嘎,程 嵩,等. 面板堆石坝面板竖缝特性对面板应力变形影响分析[J]. 岩土力学,2009,30(4):1 089-1 094.(HU Yun,ZHANGGa,CHENG Song,et al. Effect of vertical joints on stress-deformation behavior of CFRD[J]. Rock and Soil Mechanics,2009,30(4):1 089-1 094.(in Chinese))
|
| [6] |
邹德高,尤华芳,孔宪京,等. 接缝简化模型及参数对面板堆石坝面板应力及接缝位移的影响研究[J]. 岩石力学与工程学报,2009,28(增1):3 257-3 263.(ZOUDegao,YOU Huafang,KONG Xianjing,et al. Research on joint simplified model and effects of joint parameters on panel stress and joint displacements of faced rockfill dam[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):3257-3263.(in Chinese))
|
| [7] |
SITZMANN S,WILLNER K,WOHLMUTH B I. A dual Lagrange method for contact problems with regularized contact conditions[J]. International Journal for Numerical Methods in Engineering,2014,99(3):221-238.
|
| [8] |
WOHLMUTH BI. A mortar finite element method using dual spaces for the Lagrange multiplier[J]. SIAM Journal on Numerical Analysis,2000,38(3):989-1012.
|
| [9] |
张丙印,师瑞锋,王 刚. 高面板堆石坝面板脱空问题的接触力学分析[J]. 岩土工程学报,2003,25(3):361-364.(ZHANG Bingyin,SHI Ruifeng,WANG Gang. Contact analysis of separation between concrete slab and cushion layer in high concrete face rock-fill dam[J]. Chinese Journal of GeotechnicalEngineering,2003,25(3):361-364. (in Chinese))
|
| [10] |
周墨臻,钱晓翔,张丙印. 地下工程中的非线性接触算法研究及数值实现[J]. 岩石力学与工程学报,2014,33(12):2 390-2 396. (ZHOU Mozhen,QIANXiaoxiang,ZHANG Baingyin. Algorithm and numerical analysis method for nonlinear contact problems in underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(12):2390-2396.(in Chinese))
|
| [11] |
ZAVARISE G,DE LORENZIS L. A modified node-to-segment algorithm passing the contact patch test[J]. International Journal for Numerical Methods in Engineering,2009,79(4):379-416.
|