| [1] |
ANAGNOSTOU G,KOVAR K. Face stability conditions with earth-pressure-balanced shields[J]. Tunnelling and Underground Space Technology,1996,11(2):165-173.
|
| [2] |
魏建华,丁书福. 土压平衡式盾构开挖面稳定机制与压力舱土压的控制[J].工程机械,2005,(1):18-19.(WEI Jianhua,DING Shufu. Excavating face stabilization mechanism of soil pressure balance shield and control of soil pressure in pressure cabin[J]. Construction Machinery and Equipment,2005,(1):18-19.(in Chinese))
|
| [3] |
杨洪杰,傅德明,葛修润. 盾构周围土压力的试验研究与数值模拟[J]. 岩石力学与工程学报,2006,25(8):1652-1657.(YANG Hongjie,FU Deming,GE Xiurun. Experimental study and numerical simulation of earth pressure around shield machine[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1652-1657.(in Chinese))
|
| [4] |
刘东亮. EPB盾构掘进的土压控制[J]. 铁道工程学报,2005,(4):45-51.(LIU Dongliang. Soil pressure control for epb shield excavation[J]. Journal of Railway Engineering Society,2005,(4):45-51.(in Chinese))
|
| [5] |
朱合华,徐前卫,廖少明. 土压平衡盾构法施工参数的模型试验研究[J]. 岩土工程学报,2006,28(5):553-557.(ZHU Hehua,XU Qianwei,LIAO Shaoming. Experimental study on working parameters of EPB shield machine[J]. Chinese Journal of Geotechnical Engineering,2006,28(5):553-557.(in Chinese))
|
| [6] |
徐前卫,朱合华,廖少明. 软土地层土压平衡盾构法施工的模型试验研究[J]. 岩土工程学报,2007,29(12):1849-1857.((XU Qianwei,ZHU Hehua,LIAO Shaoming. Experimental study on EPB shield tunnel construction in softground[J]. Chinese Journal of Geotechnical Engineering,2007,29(12):1849-1857.(in Chinese))
|
| [7] |
胡新朋,孙谋,李建华,等. 地铁EPB 盾构不同地层土仓压力设置问题研究[J]. 地下空间与工程学报,2006,2(8):1413-1417.(HU Xinpeng,SUN Mou,LI Jianhua,et al. Computing of supporting pressure of working chamber for EPB shield applied in metro[J]. Chinese Journal of Underground Space and Engineering,2006,2(8):1413-1417.(in Chinese))
|
| [8] |
MELIS M M J,MEDINA R luis E. Discrete numerical model for analysis of earth pressure balance tunnel excavation[J]. Journal of Geotechnical and Geoenvironmental Engineering,2005,(10):1234-1242.
|
| [9] |
NEZAMI E G,HASHASH Y M A,ZHAO D W,et al. Simulation of front end loader bucket-soil interaction using discrete element method[J]. International Journal for Numerical and Analytical Methods in Geomechanics,2007,31(9):1147-1162.
|
| [10] |
CLEARY P W. DEM simulation of industrial particle flows:case studies of dragline excavators,mixing in tumblers and centrifugal mills[J]. Powder Technology,2000,109(1):83-104.
|
| [11] |
FLEISSNER F,GAUGELE T,EBERHARD P. Applications of the discrete element method in mechanical engineering[J]. Multibody System Dynamics,2007,18(1):81-94.
|
| [12] |
SHMULEVICH I,ASAF Z,RUBINSTEIN D. Interaction between soil and a wide cutting blade using the discrete element method[J]. Soil andTillage Research,2007,97(1):37-50.
|
| [13] |
HORNER D A,PETERS J F,CARRILLO A.Large scale discrete element method modeling of vehicle-soilinteraction[J]. Journal of Engineering Mechanics,2001,127(10):1027-1032.
|
| [14] |
MOMOZU M,OIDA A,YAMAZAKI M,et al. Simulation of a soil loosening process by means of the modified distinct element method[J]. Journal of Terramechanics,2003,39(4):207-220.
|
| [15] |
武力,屈福政,孙伟,等. 基于离散元的土压平衡盾构密封舱压力分析[J].岩土工程学报,2010,32(1):18-23.(WU Li,QU Fuzheng,SUN Wei,et al. Discrete numerical model for analysis of chamber pressure of earth pressure balance shield machine[J].Chinese Journal of Geotechnical Engineering,2010,32(1):18-23.(in Chinese))
|
| [16] |
王洪新,傅德明. 土压平衡盾构掘进的数学物理模型及各参数间关系研究[J]. 土木工程学报,2006,39(9):86-90.(WANG Hongxin,FU Deming. A mathematical model and related parameters for EPD shield tunneling[J]. China Civil Engineering Journal,2006,39(9):86-90.(in Chinese))
|
| [17] |
王洪新. 软土层土压平衡盾构配置参数计算与平衡控制[博士学位论文][D]. 上海:同济大学,2009.(WANG Hongxin.Calculation of device parameters and balance control of EPB shield in soft soil strata[Ph. D. Thesis] [D].Shanghai:Tongji University,2009.(in Chinese))
|
| [18] |
李向红,傅德明. 土压平衡模型盾构掘进试验研究[J]. 岩土工程学报,2006,28(9):1 101-1 105.(LI Xianghong,FU Deming.Experimental study on excavation behavior using model EPB shield with a diameter of 1.8m[J]. Chinese Journal of Geotechnical Engineering,2006,28(9):1 101-1 105.(in Chinese))
|