| [1] |
高润平,刘 文.隧道掘进机在塔山煤矿平硐施工中的应用[J]. 煤矿开采,2005,(5):44-46.(GAO Runping,LIU Wen. Application of the tunneling machine in the construction of chamber in Tashan coal mine[J]. Coal Mining Technology,2005,(5):44-46.(in Chinese))
|
| [2] |
雷升祥.斜井TBM法施工技术[M]. 北京:中国铁道出版社,2012:4-13.(LEI Shenxiang. Shield inclined shafts construction technique[M]. Beijing:China Railway Publishing House,2012:4-13.(in Chinese))
|
| [3] |
刘泉声,时 凯,黄 兴.TBM应用于深部煤矿建设的可行性及关键科学问题[J]. 采矿与安全工程学报,2013,(5):633-641.(LIU Quansheng,SHI Kai,HUANG Xin. Feasibility of application of TBM in construction of deep coal mine and its key scientific problems[J]. Journal of Mining and Safety Engineering,2013,(5):633-641.(in Chinese))
|
| [4] |
何 川.盾构/TBM施工煤矿长距离斜井的技术挑战与展望[J]. 隧道建设,2014,(4):287-297.(HEChuan. Challenge and prospective of construction of Long-distance incline shafts of coal mines by shield/TBM[J]. Tunnel Construction,2014,(4):287-297.(in Chinese))
|
| [5] |
崔广心,程锡禄. 徐淮地区井壁破坏原因的初步研究[J]. 煤炭科学技术,1991,(8):46-50.(CUIGuangxin,CHEN Xilu. Primary research on the failure mechanism of borehole walls in Xu-Huai area[J]. Coal Science and Technology,1991,(8):46-50.(in Chinese))
|
| [6] |
楼根达,陈湘生.关于疏水沉降地层中井壁破坏问题的认识与建议[J]. 建井技术,1998,19(1):1-4.(LOUGenda,CHENXiangsheng. The understanding and proposalof the borehole walls failure considering dewater settlement[J]. Mine Construction Technology,1998,19(1):1-4.(in Chinese))
|
| [7] |
刘希亮. 深部土体失水变形及诱发井筒破裂的机制与研究[博士学位论文][D]. 徐州:中国矿业大学,2000.(LIUXiliang. Study on the law of dewater settlementof bottom aquifer in overburden[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2000.(in Chinese))
|
| [8] |
郑永来,韩文星,童琪华,等. 软土地铁隧道纵向不均匀沉降导致的管片接头环缝开裂研究[J]. 岩石力学与工程学报,2005,24(24):4552-4558.(ZHENG Yonglai,HAN Wenxing,TONGQihua,et al. Study on longitudinalcrack of shield tunnel segment joint due to asymmetric settlement in soft soil[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(24):4552-4558.(in Chinese))
|
| [9] |
BOREEK M,CHUDEKM. 矿山岩体力学[M]. 于振海译. 北京:煤炭工业出版社,1985:217-220.(BOREEK M,CHUDEK M. Mining rock mass mechanics[M]. Translated by YU Zhenhai. Beijing:China Coal Industry Publishing House,1985:217-220.(in Chinese))
|
| [10] |
CHRISTLE IF. A Re-appraisal of Merchant¢s contribution to the theory of consolidation[J]. Geotechnique,1964,14(4):426-537.
|
| [11] |
李文平. 徐淮矿区深厚表土底含失水压缩变形实验研究[J]. 煤炭学报,1999,24(3):231-235.(LI Wenping. Testing research of compressivedeformation due to water loss of the bottom aquifer buried by great overburden soils in Xuhuai mine area[J]. Journal of China Coal Society,1999,24(3):231-235.(in Chinese))
|
| [12] |
刘希亮. 深厚表土底部含水层疏排水沉降规律研究[博士学位论文][D]. 徐州:中国矿业大学,2000.(LIU Xiliang. Study on the law of dewater settlementof bottom aquifer in overburden[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2000.(in Chinese))
|
| [13] |
钱鸣高,石平五,许家林. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社,2010:1-6.(QIANMinggao,SHI Pingwu,XU Jialin. Mining pressure and strata control[M]. Xuzhou:China University of Mining and Technology Press,2010:1-6.(in Chinese))
|
| [14] |
志波由纪夫,川島一彦. シ―ルドトソネルの耐震解析に用いる長手方向覆土剛性の評價法[C]//土木学会論文集. [S. l. ]:[s. n.],1988:319-327.
|
| [15] |
志波由纪夫,川島一彦. 応答変位法によるシ―ルドトソネルの地震时断面力の算定法[C]// 土木学会論文集. [s. l. ]:[s. n.],1988:385-394.
|
| [16] |
张厚美,过 迟,付德明. 圆形隧道装配式衬砌接头刚度模型研究[J].岩土工程学报,2000,22(3):309-313.(ZHANGHoumei,GUOChi,FU Deming. A study on the stiffness model of circular tunnel prefabricated lining[J]. Chinese Journal of Geotechnical Engineering,2000,22(3):309-313.(in Chinese))
|