| [1] |
SHARMA J S,HEFNY A M,ZHAO J,et al. Effect of large excavation on deformation of adjacent MRT tunnels[J]. Tunnelling and Underground Space Technology,2001,16(2):93-98.
|
| [2] |
王卫东,沈 健,翁其平,等. 基坑工程对邻近地铁隧道影响的分析与对策[J]. 岩土工程学报,2006,28(增1):1 340-1 345.(WANG Weidong,SHEN Jian,WENG Qiping,et al. Analysis and countermeasures of influence of excavation on adjacent tunnels[J]. Chinese Journal of Geotechnical Engineering,2006,28(Supp.1):1 340-1 345.(in Chinese))
|
| [3] |
高广运,高 盟,杨成斌,等. 基坑施工对运营地铁隧道的变形影响及控制研究[J]. 岩土工程学报,2010,32(3):453-459.(GAO Guangyun,GAO Meng,YANG Chengbin,et al. Influence of deep excavation on deformation of operating metrotunnels and countermeasures[J].Chinese Journal of Geotechnical Engineering,2010,32(3):453-459.(in Chinese))
|
| [4] |
张治国,张孟喜,王卫东. 基坑开挖对临近地铁隧道影响的两阶段分析方法[J]. 岩土力学,2011,32(7):2 085-2 092.(ZHANG Zhiguo,ZHANG Mengxi,WANG Weidong. Two-stage method for analyzing effects on adjacent metro tunnelsdue to foundation pit excavation[J]. Rock and Soil Mechanics,2011,32(7):2 085-2 092. (in Chinese))
|
| [5] |
ZHANG Z G,HUANG M S,WANG W D. Evaluation of deformation response for adjacent tunnels due to soil unloading in excavation engineering[J]. Tunnelling and Underground Space Technology,2013,38:244-253.
|
| [6] |
刘庭金.基坑施工对盾构隧道变形影响的实测研究[J]. 岩石力学与工程学报,2008,27(增2):3 393-3 400.(LIU Tingjin. Study on shield tunnel deformation due to foundation pit construction[J]. Chinese Journal of Rock Mechanics and Geotechnical Engineering,2008,27(Supp.2):3 393-3 400.(in Chinese))
|
| [7] |
黄宏伟,黄 栩,SCHWEIGER FH.基坑开挖对下卧运营盾构隧道影响的数值模拟研究[J]. 土木工程学报,2012,45(3):182-189.(HUANG Hongwei,HUANG Xu,SCHWEIGERFH. Numerical analysis of the influence of deep excavation onunderneath existing road tunnel[J]. China Civil Engineering Journal,2012,45(3):182-189.(in Chinese))
|
| [8] |
CHANG C T,SUN C W,DUANN S W,et al. Response of a Taipei Rapid Transit System (TRTS) tunnel to adjacent excavation[J]. Tunnelingand Underground Space Technology,2001,16(3):151-158.
|
| [9] |
上海市市政工程管理局. 上海市地铁沿线建筑施工保护地铁技术管理暂行规定[S].上海:上海市市政工程管理局,1994.(Shanghai Municipal Engineering Administration. Interim Provisionsof Protection Technology for Construction Activities near the Subway[S]. Shanghai:Shanghai Municipal Engineering Administration,1994.(in Chinese))
|
| [10] |
徐中华,王卫东. 敏感环境下基坑数值分析中土体本构模型的选择[J]. 岩土力学,2010,33(1):258-264.(XU Zhonghua,WANG Weidong. Selection of soil constitutive models for numerical analysis of deepexcavations in close proximity to sensitive properties[J]. Rock and Soil Mechanics,2010,33 (1):258-264.(in Chinese))
|
| [11] |
闫静雅. 桩基础全寿命期对邻近已有隧道的影响研究[博士学位论文][D]. 上海:同济大学,2007.(YAN Jingya. The influenceof pile foundation in life-cycle on adjacent existing tunnel[Ph. D Thesis][D]. Shanghai:Tongji University,2007.(in Chinese))
|
| [12] |
刘国斌,王卫东. 基坑工程手册[M]. 北京:中国建筑工业出版社,2009:216-226.(LIU Guobin,WANG Weidong. Excavation engineeringmanual[M]. Beijing:China Architecture andBuilding Press,2009:216-226.(in Chinese))
|
| [13] |
甘 涛. 宁波轨道交通盾构法隧道施工引起的地表沉降的规律研究[硕士学位论文][D]. 杭州:浙江大学,2012.(GAN Tao. Study on the law of ground settlement with shield driven method in Ningbo area[M.S. Thesis][D]. Hangzhou:Zhejiang University,2012.(in Chinese))
|
| [14] |
黄宏伟,徐 凌,严佳梁,等.盾构隧道横向刚度有效率研究[J]. 岩土工程学报,2006,28(1):11-18.(HUANG Hongwei,XU Ling,YAN Jialiang,et al. Study on transverse effective rigidity ratio of shield tunnels[J]. Chinese Journal of Geotechnical Engineering,2006,28(1):11-18.(in Chinese))
|
| [15] |
杨雨冰,谢雄耀. 基于断裂力学的盾构隧道管片结构开裂破损机制探讨[J]. 岩石力学与工程学报,2015,34(10):2 114-2 124.(YANG Yubing,XIE Xiongyao. Breaking mechanism of segmented lining in shield tunnel based on fracture mechanics[J]. Chinese Journal of Rock mechanics and Engineering,2015,34(10):2 114-2 124.(in Chinese))
|
| [16] |
YAN Z G,ZHU H H,JU J W. Behavior of reinforced concrete and steel fiber reinforced concrete shield TBM tunnel linings exposed to high temperatures[J]. Construction and Building Materials,2013,38:610-618.
|
| [17] |
MANIE J. DIANAUser¢s manualelement library (release 9.4.4)[M].Delft,The Netherlands:TNO DIANA BV,2011:415-426.
|
| [18] |
MANIE J. DIANA User¢s manual element library (release 9.4.4)[M]. Delft,The Netherlands:TNO DIANA BV,2011:579-592.
|