Citation Search Quick Search
  2017, Vol. 36 Issue (3): 697-704    DOI: 10.13722/j.cnki.jrme.2016.0127
Current Issue | Archive | Adv Search |
Three-dimensional transient stability of slopes during pile driving using upper-bound limit analysis
RAO Pingping1,ZHAO Linxue1,LI Lin2,LIU Ying3
(1. Department of Civil Engineering,University of Shanghai for Science and Technology,Shanghai 200093,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. College of Civil Engineering and Architecture,Nanchang Institute Technology,Nanchang,Jiangxi 330099,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号