Citation Search Quick Search
  2017, Vol. 36 Issue (3): 745-753    DOI: 10.13722/j.cnki.jrme.2016.0014
Current Issue | Archive | Adv Search |
Settlement behavior and inverse prediction of post-construction settlement of high filled loess embankment
GE Miaomiao1,LI Ning1,2,ZHANG Wei3,ZHENG Jianguo3,ZHU Caihui1
(Institute of Geotechnical Engineering,Xi?an University of Technology,Xi?an,Shaanxi 710048,China;2. School of Civil Engineering,Lanzhou Jiaotong University,Lanzhou,Gansu 730070,China;3. China Jikan Research Institute of Engineering
Investigation and Design Co.,Ltd.,Xi?an,Shaanxi 710043,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号