Citation Search Quick Search
  2017, Vol. 36 Issue (4): 781-793    DOI: 10.13722/j.cnki.jrme.2016.0691
Current Issue | Archive | Adv Search |
Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde hydropower station subjected to excavation
LI Ang1,2,DAI Feng1,2,XU Nuwen2,3,GU Gongkai4,LIU Ke4,LI Biao2
(1. School of Architecture and Environment,Sichuan University,Chengdu,Sichuan 610065,China;2. State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;3. Stake Key Laboratory of Geohazard Prevetion and Geoenvironment Protection,Chengdu,Sichuan 610059,China;4. China Three Gorges Corporation,Beijing,100038,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号