[6] |
王 媛,王 飞,倪小东. 基于非稳定渗流随机有限元的隧洞涌水量预测[J]. 岩石力学与工程学报,2009,28(10):1 986-1 994. (WANG Yuan,WANG Fei,NI Xiaodong. Prediction of water inflow in tunnel based on stochastic finite element of unsteady seepage[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):1 986-1 994.(in Chinese))
|
[9] |
许振浩,李术才,李利平,等. 基于层次分析法的岩溶隧道突水突泥风险评估[J]. 岩土力学,2011,32(6):1 757-1 765.(XU Zhenhao,LI Shucai,LI Liping,et al. Risk assessment of water or mud inrush of karst tunnels based on analytic hierarchy process[J]. Rock and Soil Mechanics,2011,32(6):1 757-1 765.(in Chinese))
|
[16] |
KARWOWSKI W,MITAL A. Applications of Approximate Reasoning in Risk Analysis[J]. Advances in Human Factors/ ergonomics,1986,(6):227-243.
Your browse does not support frame! " target="_blank">
|
[2] |
ZHANG G H,JIAO Y Y,WANG H. Outstanding issues in excavation of deep and long rock tunnels:a case study[J]. Canadian Geotechnical Journal,2014,51(9):984-994.
|
[4] |
HWANG J H,LU C C. A semi-analytical method for analyzing the tunnel water inflow[J]. Tunnelling and Underground Space Technology,2007,22(1):39-46.
|
[12] |
MARSILY D G. Quantitative hydrogeology[M]. New York:Academic Press,1986:3-6.
Your browse does not support frame! |