[1] |
贾 新,袁 勇,李焯芬. 新型玻璃纤维增强塑料砂浆锚杆的黏结性能试验研究[J]. 岩石力学与工程学报,2006,25(10):2 108-2 114. (JIA Xin,YUAN Yong,LEE C F. Experimental study on bond behavior of new type cement grouted GFRP bolts[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(10):2 108-2 114.(in Chinese))
|
[2] |
李国维,高 磊,黄志怀,等. 全长黏结玻璃纤维增强聚合物锚杆破坏机制拉拔模型试验[J]. 岩石力学与工程学报,2007,26(8):1 653-1 663.(LI Guowei,GAO Lei,HUANG Zhihuai,et al. Pull-out model experiment on failure mechanism of full-length bonding glass fiber reinforced polymer rebar[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(8):1 653-1 663.(in Chinese))
|
[3] |
黄志怀,李国维,王思敬,等. 不同围岩条件玻璃纤维增强塑料锚杆结构破坏机制现场试验研究[J]. 岩石力学与工程学报,2008,27(5):1 008-1 018.(HUANG Zhihuai,LI Guowei,WANG Sijing, et al. Field test on pullout behaviors of anchorage structures with glass fiber reinforced plastic rods for different surrounding rock masses[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(5):1 008-1 018.(in Chinese))
|
[4] |
赵明华,龙 照,邹新军. 基于剪胀效应的桩底嵌岩锚杆荷载传递分析法[J]. 岩土力学,2008,29(7):1 938-1 942.(ZHAO Minghua,LONG Zhao,ZOU Xinjun. Load transfer method of rock-socketed anchoring rods under pile tip considering dilatancy effect[J]. Rock and Soil Mechanics,2008,29(7):1 938-1 942.(in Chinese))
|
[5] |
何思明,张小刚,王成华. 基于剪切滞模型的预应力锚索作用机制研究[J]. 岩石力学与工程学报,2004,23(15):2 562-2 567.(HE Siming,ZHANG Xiaogang,WANG Chenghua. Study on mechanism of prestressed anchoring cable based on modified shear lag model[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(15):2 562-2 567.(in Chinese))
|
[6] |
何思明,王成华,吴文华. 基于损伤理论的预应力锚索荷载-变形特性分析[J]. 岩石力学与工程学报,2004,23(5):786-792.(HE Siming,WANG Chenghua,WU Wenhua. Analysis on loading- deformation of prestressed cable based on damage theory[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(5):786-792.(in Chinese))
|
[7] |
张 洁,尚岳全,叶 彬. 锚杆p-s曲线的双折线荷载传递解析算法[J]. 岩石力学与工程学报,2005,24(6):1 072-1 076.(ZHANG Jie,SHANG Yuequan,YE Bin. Analytic calculation of p-s curve of bolts based on bilinear load-transfer function[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(6):1 072-1 076.(in Chinese))
|
[8] |
尤春安. 全长黏结式锚杆的受力分析[J]. 岩石力学与工程学报,2000,19(3):339-341.(YOU Chun?an. Mechanical analysis on wholly grouted anchor[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(3):339-341.(in Chinese))
|
[9] |
蒋良潍,黄润秋,蒋忠信. 锚固段侧阻力分布的一维滑移-软化半数值分析[J]. 岩石力学与工程学报,2006,25(11):2 187-2 193. (JIANG Liangwei,HUANG Runqiu,JIANG Zhangxin. One-dimensional semi-numerical analysis of lateral shear distribution of anchorage segment considering slipping and softening effects[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2 187-2 193.(in Chinese))
|
[10] |
张 雄,陈胜宏. 预应力锚索锚固段荷载传递解析算法[J]. 岩土力学,2015,36(6):1 667-1 675.(ZHANG Xiong,CHEN Shenghong. Analytical solution for load transfer along anchored section of prestressed anchor cable[J]. Rock and Soil Mechanics,2015,36(6):1 667-1 675.(in Chinese))
|
[11] |
高丹盈,张钢琴. 纤维增强塑料锚杆锚固性能的数值分析[J]. 岩石力学与工程学报,2005,24(20):3 724-3 729.(GAO Danying,ZHANG Gangqin. Numerical analysis of anchorage behavior of fiber reinforced plastic bolts[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3 724-3 729.(in Chinese))
|
[12] |
何思明,李新坡. 预应力锚杆作用机制研究[J]. 岩石力学与工程学报,2006,25(9):1 876-1 880.(HE Siming,LI Xinpo. Study on mechanism of prestressed anchor bolt[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(9):1 876-1 880.(in Chinese))
|
[13] |
许宏发,王 武,江 淼,等. 灌浆岩石锚杆拉拔变形和刚度的理论解析[J]. 岩土工程学报,2011,33(10):1 511-1 516.(XU Hongfa,WANG Wu,JIANG Miao,et al. Theoretical analysis of pullout deformation and stiffness of grouted rockbolts[J]. Chinese Journal of Geotechnical Engineering,2011,33(10):1 511-1 516.(in Chinese))
|
[14] |
黄明华,周 智,欧进萍. 拉力型锚杆锚固段拉拔受力的非线性全历程分析[J]. 岩石力学与工程学报,2014,33(11):2 190-2 199. (HUANG Minghua,ZHOU Zhi,OU Jinping. Nonlinear full-range analysis of load transfer in fixed segment of tensile anchors[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 190-2 199.(in Chinese))
|
[15] |
高丹盈,BRAHIM B. 纤维聚合物筋混凝土的黏结机理及锚固长度的计算方法[J]. 水利学报,2000,(11):70-78.(GAO Danying,BRAHIM B. Bonding mechanism and calculating method for embedded length of fiber reinforced polymer rebars in concrete[J]. Journal of Hydraulic Engineering,2000,(11):70-78.(in Chinese))
Your browse does not support frame! |