Citation Search Quick Search
  2017, Vol. 36 Issue (9): 2324-2332    DOI: 10.13722/j.cnki.jrme.2017.0143
Current Issue | Archive | Adv Search |
Mechanism and application of controllable grouting in loose strata before shield tunneling
ZHANG Cong1,YANG Junsheng1,YE Xintian1,ZHANG Zhibo2,ZHANG Guijin3,ZHANG Yi1
(1. School of Civil Engineering,Central South University,Changsha,Hunan 410075,China;2. China Railway 14th Bureau Group Tunnel Engineering Co.,Ltd.,Jinan,Shandong 250000,China;3. School of Hydraulic Engineering,Changsha University
of Science and Technology,Changsha,Hunan 410114,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号