Citation Search Quick Search
  2017, Vol. 36 Issue (S1): 3464-3474    DOI: 10.13722/j.cnki.jrme.2016.0606
Artiles Current Issue | Archive | Adv Search |
Analysis of shield tunnel segment uplift data and uplift value forecast during tunnel construction in variable composite formation
SHU Yao1,ZHOU Shunhua1,JI Chang1,XU Runze2,HUANG Zhonghui3
(1. Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China; 2. China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.,Tianjin 300300,China;3. Nanning Rail Transit Co.,Ltd.,Nanning,Guangxi 530029,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号