| A new hydraulic fracturing method for rock stress measurement based on double pressure tubes internally installed in the wire-line core drilling pipes and its application |
| WU Aiqing,HAN Xiaoyu,YIN Jianmin,LIU Yuankun |
| (Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China) |
|
|
|
|
Abstract The theoretical and technical developments regarding the hydraulic fracturing measurement of rock stress were reviewed firstly. Two hydraulic fracturing methods,including the single drilling pipe based measurement method and the traditional double tubes based hydraulic fracturing method consisting of an externally strapped hydraulic pressure tube and a drilling pipe,were discussed regarding the measurement process features and the application conditions. The wire-line core drilling technique was preferentially used for the geological investigation in the water transfer project at Dianzhong in Yunnan Province,China,due to complicated geological conditions. A new method of hydraulic fracturing measurement of rock stress with double tubes internally installed and sectionally fixed in the wire-line core drilling pipes was proposed to satisfy the special features of the wire-line core drilling technique. The development of corresponding system of equipment operation,the regulation of measurement process and the estimation of possible pressure loss along the hydraulic pressure tubes were studied. Finally,the proposed hydraulic fracturing method was implemented in 5 boreholes with 56 sections of measurement and the maximum depth being 724 m. The measurement technique proposed in this paper resolves the challenging problem that the wire-line pipes cannot be directly used in traditional hydraulic fracturing method,and provides a new technique for rock stress measurement in complicated conditions.
|
|
|
|
|
|
[1] HAIMSON B C,CORNET F H. ISRM suggested methods for rock stress estimation—part 3:hydraulic fracturing(HF) and /or hydraulic testing of pre-existing fractures(HTPF)[J]. International Journal of Rock Mechanics and Mining Sciences,2003,40(7/8):1 011–1 020.
[2] 中华人民共和国国家标准编写组. GB/T 50266—2013 工程岩体试验方法标准[S]. 北京:中国计划出版社,2003.(The National Standards Compilation Group of People′s Republic of China. GB/T 50266—2003 Standard for test methods of engineering rock mass[S]. Beijing:China Planning Press,2003.(in Chinese))
[3] 中华人民共和国行业标准编写组. SL264—2001 水利水电工程岩石试验规程[S]. 北京:中国水利水电出版社,2001.(The Professional Standards Compilation Group of People?s Republic of China. SL264—2001 Specifications for rock tests in water conservancy and hydroelectric engineering[S]. Beijing:China Water Power Press,2001.(in Chinese))
[4] FAIRHURST C. Measurement of in situ rock stresses,with particular reference to hydraulic fracturing[J]. Rock Mechanics and Engineering Geology,1964,2:129–175.
[5] HAIMSON B C. The hydrofracturing stress measuring method and recent field results[J]. International Journal of Rock Mechanics and Mining Sciences,1978,15(4):167–178.
[6] HAYASHI K,HAIMSON B C. Characteristics of shut in curves in hydraulic fracturing stress measurement and the determination of the in situ minimum compressive stress[J]. Journal of Geophysical Research-Solid Earth,1991,96:18 311–18 331.
[7] 刘允芳,尹健民,刘元坤,等. 地应力测量方法和工程应用[M]. 武汉:湖北科学技术出版社,2014.(LIU Yunfang,YIN Jianmin,LIU Yuankun,et al. Geostress measurement methods and engineering application[M]. Wuhan:Hubei Science and Technology Press,2014.(in Chinese))
[8] 李方全,翟青山,毕尚煦,等. 水压致裂法地应力测量及初步结果[J]. 地震学报,1986,8(4):431–438.(LI Fangquan,ZHAI Qingshan,BI Shangxi,et al. In-situ stress measurement by hydraulic fracturing and preliminary results[J]. Acta Seismologica Sinica,1986,8(4):431–438.(in Chinese))
[9] ITO T,SATOH T,KATO H. Deep rock stress measurement by hydraulic fracturing method taking account of system compliance effect[C]// Proceedings of the 5th International Symposium on In-situ Rock Stress “Rock Stress and Earthquake”. Netherlands:Balkema,Leiden,2010:43–49.
[10] MIZUTA Y,SANO O,OINO S,et al. Three dimensional stress determination by hydraulic fracturing for underground excavation design[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1987,24(1):15–29.
[11] 刘允芳. 水压致裂法三维地应力测量[J]. 岩石力学与工程学报,1991,10(3):246–256.(LIU Yunfang. In-situ 3-dimensional stress measurement by hydraulic fracturing technique[J]. Chinese Journal of Rock Mechanics and Engineering,1991,10(3):246–256.(in Chinese))
[12] 刘允芳. 水压致裂法地应力测量的校核与修正[J]. 岩石力学与工程学报,1998,17(3):297–304.(LIU Yunfang. Check and modification for geostress measurement by hydraulic fracturing technique[J]. Chinese Journal of Rock Mechanics and Engineering,1998,17(3):297–304.(in Chinese))
[13] 陈群策,安美建,李方全. 水压致裂法三维地应力测量的理论探讨[J]. 地质力学学报,1998,4(1):37–43.(CHEN Qunce,AN Meijian,LI Fangqun. Theoretical discussion on 3D hydraulic fracturing in situ stress measurement[J]. Journal of Geomechanics,1998,4(1):37–43.(in Chinese))
[14] CORNET F H. The HTPF and the integrated stress determination methods[C]// Comprehensive Rock Engineering. Vol. 3. Oxford:Pergamon Press,1993:313–444.
[15] 刘允芳. 在单钻孔中水压致裂法的三维地应力测量[J]. 岩石力学与工程学报,1999,18(2):192–196.(LIU Yunfang. 3-Dimensional geostress measurement by hydraulic fracturing technique in one borehole[J]. Chinese Journal of Rock Mechanics and Engineering,1999,18(2):192–196.(in Chinese))
[16] 蔡美峰,陈长臻,彭 华,等. 万福煤矿深部水压致裂地应力测量[J]. 岩石力学与工程学报,2006,25(5):1 069–1 074.(CAI Meifeng,CHEN Changzhen,PENG Hua,et al. In-situ stress measurement by hydraulic fracturing technique in deep position of Wanfu coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(5):1 069–1 074.(in Chinese))
[17] 马 鹏,赵国平,张永永,等. 锦屏超高压岩体水压致裂法地应力测试系统研制与应用[J]. 长江科学院院报,2012,29(8):58–61.(MA Peng,ZHAO Guoping,ZHANG Yongyong,et al. Preparation and application of ultrahigh pressure hydro-fracturing geostress measurement system in rock mass[J]. Journal of Yangtze River Scientific Research Institute,2012,29(8):58–61.(in Chinese))
[18] 周 晓,易学文,李守圣,等. 绳索取心钻进在水利水电勘探中存在的问题及解决思路[J]. 探矿工程(岩土钻掘工程),2013,40(3):24–27.(ZHOU Xiao,YI Xuewen,LI Shousheng,et al. The problem and solving thoughts of wire-line coring drilling in water conservancy and hydropower exploration[J]. Exploration Engineering(Rock and Soil Drilling and Tunneling),2013,40(3):24–27.(in Chinese))
[19] 张正雄. 绳索取心钻进工艺在水利水电工程地质勘探中的应用研究[J]. 探矿工程(岩土钻掘工程),2015,42(2):60–64.(ZHANG Zhengxiong. Application research on wire-line drilling in geological exploration of water conservancy and hydropower project[J]. Exploration Engineering(Rock and Soil Drilling and Tunneling),2015,42(2):60–64.(in Chinese))
[20] 刘允芳,刘元坤. 水压致裂法地应力测量若干问题的探讨[J]. 地震研究,1999,22(3):265–271.(LIU Yunfang,LIU Yuankun. Discussion on some problems of geostress measurement by hydraulic fracturing method[J]. Journal of Seismological Research,1999,22(3):265–271.(in Chinese))
[21] 赵振兴,何建京. 水力学[M]. 2版. 北京:清华大学出版社,2010. (ZHAO Zhenxing,HE Jianjing. Hydraulics [M]. 2nd ed. Beijing:Tsinghua University Press,2010.(in Chinese))
[22] 中华人民共和国行业标准编写组. DL/5331—2005 水电水利工程钻孔压水试验规程[S]. 北京:中国计划出版社,2005.(The Professional Standards Compilation Group of People?s Republic of China. DL/5331—2005 Code of water pressure test in borehole for hydropower and water resource engineering[S]. Beijing:China Planning Press,2005.(in Chinese)) |
|
|
|