[3] |
SAGASETA C. Analysis of undrained soil deformation due to ground loss[J]. Geotechnique,1987,37(3):301-320.
|
[17] |
MINDLIN R D. Force at a point in the interior of a Semiinfinit solid[J]. Physics,1936,7(5):195-202.
|
[1] |
唐晓武,朱 季,刘 维,等. 盾构施工过程中的土体变形研究[J]. 岩石力学与工程学报,2010,29(2):417-422.(TANG Xiaowu,ZHU Ji,LIU Wei,et al. Research on soil deformation during shield construction process[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(2):417-422.(in Chinese))
|
[7] |
魏 纲,张世民,齐静静,等. 盾构隧道施工引起的地面变形计算方法研究[J]. 岩石力学和工程学报,2006,25(增1):3 317-3 323. (WEI Gang,ZHANG Shimin,QI Jingjing,et al. Study on calculation method of ground deformation induced by shield tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.1):3 317-3 323.(in Chinese))
|
[9] |
张冬梅,黄宏伟. 地铁盾构推进引起周围土体附加应力的分析[J]. 地下空间,1999,19(5):379-382.(ZHANG Dongmei,HUANG Hongwei. Analysis of additional stresses in surrounding soil induced by subway shield tunneling[J]. Underground Space,1999,19(5): 379-382.(in Chinese))
|
[11] |
黄宏伟,胡 昕. 顶管施工力学效应的数值模拟分析[J]. 岩石力学与工程学报,2003,22(3):400-406.(HUANG Hongwei,HU Xin. 3D numerical analysis on construction mechanics effect of pipe-jacking[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(3):400-406.(in Chinese))
|
[13] |
彭 诚. 地铁隧道盾构施工引起土体附加应力及地表沉降研究[硕士学位论文][D]. 长沙:中南大学,2014.(PENG Cheng. Additional stress and settlement of the soil surface research caused by shield construction of subway tunnel[M. S. Thesis][D]. Changsha:Central South University,2014.(in Chinese))
|
[2] |
PECK R B. Deep excavations and tunneling in soft ground[C]// Proceedings of Soil Mechanics and Foundation Engineering. Mexico:[s. n.],1969:225-290.
|
[4] |
梁荣柱,夏唐代,林存刚,等.盾构推进引起地表变形及深层土体水平位移分析[J]. 岩石力学与工程学报,2015,34(3):583-593.(LIANG Rongzhu,XIA Tangdai,LIN Cungang,et al. Analysis of ground surface displacement and horizontal movement of deep soils induced by shield advancine[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(3):583-593.(in Chinese))
|
[5] |
姜忻良,赵志民. 镜像法在隧道施工土体位移计算中的应用[J]. 哈尔滨工业大学学报,2005,27(6):801-803.(JIANG Xinliang,ZHAO Zhimin. Application of image method in the calculation tunneling induced soil displacement[J]. Journal of Harbin Institute of Technology,2005,27(6):801-803.(in Chinese))
|
[6] |
马•谢尔勒. 顶管工程[M]. 漆平生,杨顺喜,李 周,译. 北京:中国建筑工业出版社,1983:1-66.(SCHERLE M. The pipe jacking engineering[M]. Translated by XI Pingsheng,YANG Shunxi,LI Zhou. Beijing:China Architecture and Building Press,1983:1-66.(in Chinese))
|
[8] |
LEE K M,ROWER K. Analysis of the three dimensional ground move-ments,the Thunder Bay Tunnel[J]. Canadian Geotechnical Journal,1991,28(1):25-41.
|
[10] |
胡 昕,黄宏伟. 相邻平行顶管推进引起附加荷载的力学分析[J]. 岩土力学,2001,22(1):75-77.(HU Xin,HUANG Hongwei. Mechanical analysis of superimposed load introduced by propulsion of adjacent parallel pipe[J]. Rock and Soil Mechanics,2001,22(1):75-77.(in Chinese))
|
[12] |
齐静静,徐日庆,魏 纲,等. 隧道盾构法施工引起周围土体附加应力分析[J]. 岩土力学,2008,29(2):529-534.(QI Jingjing,XU Riqing,WEI Gang,et al. Analysis of superimposed stress of surrounding soil due to shield tunneling[J]. Rock and Soil Mechanics,2008,29(2):529-534.(in Chinese))
|
[14] |
赵玉勃,张忠苗. 盾构法隧道推进引起周围土体的附加应力分析[J]. 岩土工程学报,2010,32(9):1 386-1 391.(ZHAO Yubo,ZHANG Zhongmiao. Additional stress of surrounding soil caused by propelling shield tunneling[J]. Chinese Journal of Geotechnical Engineering,2010,32(9):1 386-1 391.(in Chinese))
|
[15] |
王 涛,徐日庆,齐静静,等. 盾构掘进引起的土体附加应力分析[J]. 浙江大学学报:工学版,2008,42(11):2 009-2 014.(WANG Tao,XU Riqing,QI Jingjing,et al. Additional stress field of surrounding soil due to shield tunneling[J]. Journal of Zhejiang University:Engineering Science,2008,42(11):2 009-2 014.(in Chinese))
|
[16] |
欧阳文彪,丁文琪,谢东武. 考虑建筑物刚度的盾构施工引致沉降计算方法[J]. 地下空间与工程学报,2013,9(1):155-160. (OUYANG Wenbiao,DING Wenqi,XIE Dongwu. Calculation method of settlement due to shield tunnelling considering structure stiffness[J]. Chinese Journal of Underground Space and Engineering,2013,9(1):155-160.(in Chinese))
|
[18] |
钟晓春,林 键,刘洪忠. 土压平衡式盾构机刀盘扭矩力学模型究[J].岩土力学,2006,27(增2):821-824.(ZHONG Xiaochun,LIN Jian,LIU Hongzhong. A study of mechanical model for torgue of EBP shield machine[J]. Rock and Soil Mechanics,2006,27(Supp.2):821-824.(in Chinese))
|