[1] WHITTAKER B N. Design and stability of pillar in long wall mining[J]. Mining Engineer,1979,13(25):68–72.
[2] 王永秀,齐庆新,陈 兵. 煤柱应力分布规律的数值模拟分析[J].煤炭科学技术,2004,32(10):59–62.(WANG Yongxiu,QI Qingxin,CHEN Bing. Analysis on digital simulation for stress distribution law of coal pillar[J]. Coal Science and Technology,2004,32(10):59–62.(in Chinese))
[3] 谢广祥,杨 科,常聚才. 煤柱宽度对综放面围岩应力分布规律影响[J]. 北京科技大学学报,2006,28(11):1 111–1 113(XIE Guangxiang,YANG Ke,CHANG Jucai. Effect of coal pillar width on the stress distribution law of surrounding rocks in fully mechanized top-coal caving mining face[J]. Journal of University of Science and Technology Beijing,2006,28(11):1 111–1 113.(in Chinese))
[4] KUSHWAHA A,SINGH S K,TEWARI S,et al. Empirical approach for designing of support system in mechanized coal pillar mining[J]. International Journal of Rock Mechanics and Mining Sciences,2010,47(7):1 063–1 078.
[5] GHASEMI E,SHAHRIAR K. A new coal pillars design method in order to enhance safety of the retreat mining in room and pillar mines[J]. Safety Science,2012,50(3):579–585.
[6] 侯朝炯,李学华. 综放沿空掘巷围岩大、小结构的稳定性原理[J]. 煤炭学报,2001,26(1):1–7.(HOU Chaojiong,LI Xuehua,Stability Principle of Large and Small Structures of Surrounding Rock in Gob- side Entry Driving along Goaf[J]. Journal of China Coal Society,2001,26(1):1–7.(in Chinese))
[7] 翟所业,吴士良. 沿空送巷的理论探讨[J]. 矿山压力与顶板管理,2003,(2):45–46.(ZHAI Shuoye,WU Shiliang. Theoretical discussion on the driving roadway along goaf[J]. Journal of Mining and Safety Engineering,2003,(2):45–46.(in Chinese))
[8] 王红胜,张东升,李树刚,等. 基于基本顶关键岩块B断裂线位置的窄煤柱合理宽度的确定[J]. 采矿与安全工程学报,2014,31(1):10–16.(WANG Hongsheng,ZHANG Dongsheng,LI Shugang,et al. Rational width of narrow coal pillar based on the fracture line location of key rock B in main roof[J]. Journal of Mining and Safety Engineering,2014,31(1):10–16.(in Chinese))
[9] 王卫军,侯朝炯,柏建彪,等. 综放沿空巷道底板受力变形分析及底鼓力学原理[J]. 岩土力学,2001,22(3):319–322.(WANG Weijun,HOU Chaojiong,BAI Jianbiao,et al. Mechanical deformation analysis and principle of floor heav of roadway driving gob in fully mechanized sub-level caving face[J]. Rock and Soil Mechanics,2001,22(3):319–322.(in Chinese))
[10] 石永奎,宋振骐,王崇革. 软煤层综放工作面沿空掘巷支护设计[J]. 岩土力学,2001,22(4):509–512.(SHI Yongkui,SONG Zhengqi,WANG Congge. The supporting design of road driving along next goaf in soft seam with fully mechanized top-caving[J]. Rock and Soil Mechanics,2001,22(4):509–512.(in Chinese))
[11] 韩承强,张开智,徐小兵,等. 区段小煤柱破坏规律及合理尺寸研究[J]. 采矿与安全工程学报,2007,(3):370–373.(HAN Chengqiang,ZHANG Kaizhi,XU Xiaobing,et al. Study on failure regularity and reasonable dimension of district sublevel small coal pillar[J]. Journal of Mining and Safety Engineering,2007,(3):370–373.(in Chinese))
[12] 赵国贞,马占国,孙 凯,等. 小煤柱沿空掘巷围岩变形控制机理研究[J]. 采矿与安全工程学报,2010,27(4):517–521.(ZHAO Guozhen,MA Zhanguo,SUN Kai,et al. Research on deformation controlling mechanism of the narrow pillar of roadway driving along next goaf[J]. Journal of Mining and Safety Engineering,2010,27(4):517–521.(in Chinese))
[13] 郑西贵,姚志刚,张 农. 掘采全过程沿空掘巷小煤柱应力分布研究[J]. 采矿与安全工程学报,2012,29(4):459–465.(ZHENG Xigui,YAO Zhigang,ZHANG Nong. Stress distribution of coal pillar with gob-side entry driving in the process of excavation and mining[J]. Journal of Mining and Safety Engineering,2012,29(4):459–465.(in Chinese))
[14] 李顺才,柏建彪,董正筑. 综放沿空掘巷窄煤柱受力变形与应力分析[J]. 矿山压力与顶板管理,2004,(3):17–19.(ZHAO Shuncai,BAI Jianbiao,DONG Zhengzhu. Deformation and stress analysis of narrow coal pillar in gob-side entry driving along goaf[J]. Journal of Mining and Safety Engineering,2004,(3):17–19.(in Chinese))
[15] 柏建彪,王卫军,侯朝炯,等. 综放沿空掘巷围岩控制机理及支护技术研究[J]. 煤炭学报,2000,(5):478–481.( BAI Jianbiao,WANG Weijun,HOU Chaojiong,et al.Control mechanism and support technique about gateway driven along goaf in fully mechanized top coal caving face[J]. Journal of China Coal Society,2000,(5):478–481.(in Chinese))
[16] 马其华,王宜泰. 深井沿空巷道小煤柱护巷机理及支护技术[J]. 采矿与安全工程学报,2009,26(4):520–523.(MA Qihua,WANG Yitai. Mechanism of narrow pillar protecting roadway and support technology of gob-side entry in deep mine[J]. Journal of Mining and Safety Engineering,2009,26(4):520–523.(in Chinese))
[17] 刘增辉,高 谦,华心祝,等. 沿空掘巷围岩控制的时效特征[J]. 采矿与安全工程学报,2009,26(4):465–469.(LIU Zenghui,GAO Qian,HUA Xinzu,et al. Aging characteristics of wall rock control in roadway driving along goaf[J]. Journal of Mining and Safety Engineering,2009,26(4):465–469.(in Chinese))
[18] 杨建辉,蔡美峰. 不稳定顶板条件下煤巷锚网索梁支护实践[J]. 煤炭科学技术,2002,(8):8–11.(YANG Jianhui,CAI Meifeng. Practices on bolt mesh anchor beam support system in seam roadway under unstable roof condition[J]. Coal Science and Technology,2002,(8):8–11.(in Chinese))
[19] 康红普. 深部煤巷锚杆支护技术的研究与实践[J]. 煤矿开采,2008,(1):1–5.(KANG Hongpu. Research and practice of bolting support technology in deep coal roadways[J]. Coal Mining Technology,2008,(1):1–5.(in Chinese))
[20] 杨同敏,贾双春,宇黎亮,等. 综放面沿空掘巷无煤柱开采[J]. 矿山压力与顶板管理,1998,(2):61–62.(YANG Tongmin,JIA Shuangchun,YU Liliang,et al. None coal pillar mining along gob driving roadway in fully mechanized caving face[J] Journal of Mining & Safety Engineering,1998,(2):61–62.(in Chinese))
[21] 陈学伟,金 泰,李 峰,等. 鲍店矿综放面沿空巷道矿压控制[J]. 矿山压力与顶板管理,1997,(2):54–57.(CHENG Xuewei,JIN Tai,LI Feng,et al. Baodian coal mine fully mechanized caving face along empty roadway pressure control[J]. Journal of Mining and Safety Engineering,1997,(2):54–57.(in Chinese))
[22] YUAN Z,ZHIJUN W,FUCHEN L,et al. Stability of coal pillar in gob-side entry driving under unstable overlying strata and its coupling support control technique[J]. International Journal of Mining Science and Technology,2013,23(2):204–210.
[23] QIAN Y,JINGHONG W,DAPENG D,et al. Cable-truss supporting system for gob-side entry driving in deep mine and its application[J]. International Journal of Mining Science and Technology,2016,26(05):885–893.
[24] YANG J,CAO S,LI X. Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face[J]. International Journal of Mining Science and Technology,2013,23(2):271–276.
[25] 王志强,张俊文,李良红,等. 一种超长推进距离工作面的沿空掘巷开采方法[P]. 中国国家知识产权局,2015:CN201510463081.3. (WANG Zhiqiang,ZHANG Junwen,LI Lianghong,et al. An approach to roadway digging along a long advance distance working face[P]. China State Intellectual Property Office,2015:CN201510463081.3. (in Chinese))
[26] 李迎富. 二次沿空留巷围岩稳定性控制机理研究[博士学位论文][D]. 合肥;安徽理工大学,2012.(LI Yingfu. Research on controlling mechanism of surroundingrock stability of the secondary gob-side entry retaining[Ph. D. Thesis][D]. Hefei:Anhui University of Science and Technology,2012.(in Chinese))
[27] 张 农,张志义,吴 海,等. 深井沿空留巷扩刷修复技术及应用[J]. 岩石力学与工程学报,2014,33(3):468–474.(ZHANG Nong,ZHANG Zhiyi,WU Hai,et al. Technology and application of reparation in deep gob-side entry retaining[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):468–474.(in Chinese))