Citation Search Quick Search
  2019, Vol. 38 Issue (12): 2512-2524    DOI: 10.13722/j.cnki.jrme.2019.0476
Artiles Current Issue | Archive | Adv Search |
Damage analysis and deformation early warning of surrounding rock mass during top arch excavation of underground powerhouse of#br# Shuangjiangkou hydropower station
QIAN Bo1,XU Nuwen1,XIAO Peiwei1,2,ZHAO Tieshuan3,DONG Linlu1
(1. State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;
2. Guodian Dadu River Basin Hydropower Development Co.,Ltd.,Chengdu,Sichuan 610041,China;3. No.1 Engineering Co.,Ltd.,China Gezhouba Group,Yichang,Hubei 443002,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号