| [1] |
黄晓康,卢坤林,朱大勇. 盾构施工对不同位置地下管线变形的影响模拟试验研究[J]. 岩土力学,2017,38(增1):123-130.(HUANG Xiaokang,LU Kunlin,ZHU Dayong. Simulation test study of deformations of pipelines located at different geometric positions arising from shield tunneling[J]. Rock and Soil Mechanics,2017,38(Supp.1):123-130.(in Chinese))
|
| [2] |
张晓清,张孟喜. 多线叠交盾构隧道近距离穿越施工扰动机制研究[J]. 岩土力学,2017,38(4):1 133-1 140.(ZHANG Xiaoqing,ZHANG Mengxi. Mechanism of approaching construction disturbance caused by multi-line overlapped shield tunnelling[J]. Rock and Soil Mechanics,2017,38(4):1 133-1 140.(in Chinese))
|
| [3] |
潘 茁. 盾构施工全过程引起的土体扰动与分层沉降特性研究[博士学位论文][D]. 北京:中国矿业大学,2016.(PAN Zhuo,Study on soil disturbance and its classified settlement due to EPB TBM excavation[Ph. D. Thesis][D]. Beijing:China University of Mining and Technology,2016.(in Chinese))
|
| [4] |
杨兵明. 宁波软土地层盾构隧道下穿铁路施工引起地层变形规律及控制技术研究[博士学位论文][D]. 北京:北京交通大学,2016. (YANG Bingming. Study on deformation law of soil stratum and control technology in soft soil stratum under construction of shield tunnel in Ningbo[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2016.(in Chinese))
|
| [5] |
孙海霞. 砂性地层盾构法施工对地表沉降的影响研究[博士学位论文][D]. 沈阳:东北大学,2013.(SUN Haixia. Study on the influence of ground settlement of shield tunnel in sand stratum[Ph. D. Thesis][D]. Shenyang:Northeastern University,2013.(in Chinese))
|
| [6] |
MENG F Y,CHEN R P,KANG X. Effects of tunneling- induced soil disturbance on the post-construction settlement in structured soft soils[J]. Tunnelling and Underground Space Technology,2018,80:53-63.
|
| [7] |
YIN M L,JIANG H,JIAN Y S,et al. Effect of the excavation clearance of an under-crossing shield tunnel on existing shield tunnels[J]. Tunnelling and Underground Space Technology,2018,78:245-258.
|
| [8] |
梅国雄,宋林辉. 小主应力方向荷载变化土体变形规律及其应用[M]. 北京:科学出版社,2010:88-95.(MEI Guoxiong,SONG Linhui. Soil deformation and application loading or un loading from the minor principal stress direction[M]. Beijing:Science Press,2010:88-95.(in Chinese))
|
| [9] |
李守德,张土乔. 天然地基土在基坑开挖卸载过程中的模量计算[J]. 土木工程学报,2002,35(5):70-74.(LI Shoude,ZHANG Tuqiao. Modulus formula for foundation soil under lateral unloading during excavation[J]. China Civil Engineering Journal,2002,35(5):70-74.(in Chinese))
|
| [10] |
施成华,彭立敏,雷明锋. 盾构法施工隧道地层变形时空统一预测方法研究[J]. 岩土力学,2009,30(8):2 379-2 384.(SHI Chenghua,PENG Limin,LEI Mingfeng. Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation[J]. Rock and Soil Mechanics,2009,30(8):2 379-2 384.(in Chinese))
|
| [11] |
魏 纲. 盾构施工引起地面长期沉降的理论计算研究[J]. 岩石力学与工程学报[J]. 2008,27(增1):2 960-2 966.(WEI Gang. Research on theoretical calculation of long-term ground settlement caused by shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):2 960-2 966.(in Chinese))
|
| [12] |
林存刚,张忠苗,吴世明,等. 软土地层盾构隧道施工引起的地面隆陷研究[J]. 岩石力学与工程学报,2011,30(12):2 583-2 591.(LIN Cungang,ZHANG Zhongmiao,WU Shiming,et al. Study of ground heave and subsidence induced by shield tunnelling in soft ground[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(12):2 583-2 591.(in Chinese))
|
| [13] |
李广信. 高等土力学[M]. 2版. 北京:清华大学出版社,2016:202-203,308-313.(LI Guangxin. Advanced soil mechanics[M]. 2nd ed. Beijing:Tsinghua University Press,2016:202-203,308-313.(in Chinese))
|
| [14] |
徐方京. 软土中盾构隧道与深基坑开挖的孔隙水压力与地层移动分析[博士学位论文][D]. 上海:同济大学,1991.(XUN Fangjing,Analysis of pore water pressure and stratum movement in excavation of shield tunnel and deep foundation pit in soft soil[Ph. D. Thesis][D]. Shanghai:Tongji University,1991.(in Chinese))
|
| [15] |
魏 纲,张鑫海,徐银锋. 考虑多因素的类矩形盾构施工引起土体竖向位移研究[J]. 岩石力学与工程学报,2018,37(1):199-208. (WEI Gang,ZHANG Xinhai,XU Yinfeng. Deriving vertical displacement of ground due to quasi-rectangular shield tunneling considering multiple factors[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(1):199-208.(in Chinese))
|
| [16] |
孙统立,张庆贺,韦良文,等. 双圆盾构掘进施工扰动土体附加应力分析[J]. 岩土力学,2008,29(8):2 246-2 251.(SUN Tongli,ZHANG Qinghe,WEI Liangwen,et al. Analysis of additional stresses of soil disturbance induced by propulsion of double-O-tube shield[J]. Rock and Soil Mechanics,2008,29(8):2 246-2 251.(in Chinese))
|
| [17] |
曾国熙,桩基工程手册[M]. 北京:中国建筑工业出版社,1995:20-21.(ZENG Guoxi. Pile foundation engineering manual[M]. Beijing:China Construction Industry Publishing,1995:20-21.(in Chinese))
|