[2] |
BOUGARD J F. Mechanical pre-cutting method[J]. Tunnelling and Underground Space Technology,1988,3(2):163–167.
|
[4] |
陶龙光,侯公羽. 超前锚杆预支护机理的力学模型研究[J]. 岩石力学与工程学报,1966,15(3):242–249.(TAO Longguang,HOU Gongyu. Study on the mechanical model in pre-support mechanism of forepoling bolt[J]. Chinese Journal of Rock Mechanics and Engineering,1966,15(3):242–249.(in Chinese))
|
[6] |
崔光耀,王道远,倪嵩陟,等. 软弱围岩隧道钢纤维混凝土衬砌承载特性模型试验研究[J]. 岩土工程学报,2017,39(10):1 807–1 813. (CUI Guangyao,WANG Daoyuan,NI Songzhi,et al. Model tests on bearing characteristics of steel fiber-reinforced concrete lining of weak surrounding rock tunnel[J]. Chines Journal of Geotechnical Engineering,2017,39(10):1 807–1 813.(in Chinese))
|
[3] |
王道远,袁金秀,李 俊,等. 考虑施工特性的浅埋软弱洞口段管棚变形量预测及工程应用[J]. 岩石力学与工程学报,2017,36(3):716–724.(WANG Daoyuan,YUAN Jinxiu,LI Jun,et al. Deformation prediction of pipe roof in shallow soft portal section of tunnel considering construction feature and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(3):716–724.(in Chinese))
|
[5] |
崔光耀,王道远,倪嵩陟,等. 玄武岩纤维混凝土隧道衬砌承载特性模型试验研究[J]. 岩土工程学报,2017,39(2):311–318.(CUI Guangyao,WANG Daoyuan,NI Songzhi,et al. Model tests on bearing characteristics of basalt fiber-reinforced concrete tunnel linings[J]. Chinese Journal of Geotechnical Engineering,2017,39(2):311–318. (in Chinese))
|
[7] |
孙付峰,刘 涛,雷 刚. 新意法在富水砂层的适用性研究[J]. 现代隧道技术,2014,51(1):171–178.(SUN Fufeng,LIU Tao,LEI Gang. Research on the applicability of adeco-rs in a water-rich sand stratum[J]. Modern Tunnelling Technology,2014,51(1):171–178. (in Chinese))
|
[13] |
王秀英,王 藤,李孔明,等.预切槽法开挖隧道地层变形及预筑拱受力试验[J]. 中国公路学报,2017,30(7):101–109.(WANG Xiuying,WANG Teng,LI Kongming,et al. Experiment on ground deformation during tunneling and pre-arch stress by pre-cutting method[J]. China Journal of Highway and Transport,2017,30(7):101–109.(in Chinese))
|
[1] |
PEILA D,ORESTE P P,RABAJOLI G,et al. The pretunnel method,a new Italian technology for full-face tunnel excavation:a numerical approach to design[J]. Tunnelling and Underground Space Technology,1995,10(3):367–374.
|
[8] |
刘 钟,柳建国,张 义,等. 隧道全方位高压喷射注浆拱棚超前支护新技术[J]. 岩石力学与工程学报,2009,28(1):59–65.(LIU Zhong,LIU Jianguo,ZHANG Yi,et al. New technique of rotary horizontal jet grouting for arched tunnel pre-support[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):59–65.(in Chinese))
|
[10] |
关宝树. 隧道施工的技术特性、理念及其发展[J]. 铁道建筑技术,2003,(3):1–6.(GUAN Baoshu. Technical character,idea of tunnel construction and its development[J]. Railway Construction Technology,2003,(3):1–6.(in Chinese))
|
[11] |
王秀英,张 鍼,吕和林,等. 机械预切槽法开挖软土隧道地层变形研究[J]. 岩土力学,2005,26(1):140–144.(WANG Xiuying,ZHANG Zhen,LU Helin,et. A study of ground deformation when excavating tunnel in soil by Mechanical pre-cutting method[J]. Rock and Soil Mechanics,2005,26(1):140–144.(in Chinese))
|
[12] |
孙 兵. 预切槽法开挖黄土隧道预衬砌支护参数研究[J]. 铁道工程学报,2017,(9):77–82.(SUN Bing. Research on the parameters of pre-lining support in loess tunnel[J]. Journal of Railway Engineering Society,2017,(9):77–82.(in Chinese))
|
[14] |
韩高升,王秀英,王北华. 机械预切槽法施工过程中槽内混凝土相关问题研究[J]. 现代隧道技术,2017,54(1):9–16.(HAN Gaosheng,WAGN Xiuying,WANG Beihua. On some issues with concrete during tunneling by the mechanical pre-cutting method[J]. Modern Tunnelling Technology,2017,54(1):9–16.(in Chinese))
|
[9] |
GERHARD S. Das Verfahren des mechanischen Voreinschneidens im Tunnelbau[J]. Strassen und Tiefbau,1986,26(2):32–34.
|