[2] |
赵永贵. 国内外隧道超前预报技术评析与推介[J]. 地球物理学进 展,2007,22(4):1 344–1 352.(ZHAO Yonggui. Analysis and recommendation of tunnel prediction techniques at home and abroad[J]. Progress in Geophysics,2007,22(4):1 344–1 352.(in Chinese)).
|
[9] |
赵永贵. 中国工程地球物理研究的进展与未来[J]. 地球物理学进 展,2002,17(2):301–304.(ZHAO Yonggui. The present situation and future of engineering geophysics in China[J]. Progress in Geophysics,2002,17(2):301–304. (in Chinese))
|
[3] |
QIAN Q H. New development of rock engineering and technology in China[C]// Proceedings of 12th ISRM International Congress on Rock Mechanics,Harmonising Rock Engineering and the Environment. Beijing:Taylor and Francis Group,2011:57–61.
|
[5] |
李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217–225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217–225.(in Chinese))
|
[7] |
娄国充,郝士华. 一种用于隧道长距离三维超前地质预报方法[P]. 中国:ZL201820766559.9,2018–05–22.(LOU Guochong,HAO Shihua. An 3D advanced geological prediction method for tunnels[P]. China:ZL201820766559.9,2018–05–22.(in Chinese))
|
[6] |
钟世航,孙宏志,王 荣,等. 陆地声纳法在隧道施工时预报断 层、溶洞的效果[J]. 隧道建设,2007,(增 2):21–25.(ZHONG Shihang,SUN Hongzhi,WANG Rong,et al. Research on survey effects of faults and karst caves using land-sonar in tunnel construction[J]. Tunnel Construction,2007,(Supp.2):21–25.(in Chinese))
|
[8] |
黄中玉,王于静,刘伟峰. 三维多分量资料处理关键技术进展[J].西安石油大学学报,2011,26(5):24–29.(HUANG Zhongyu,WANG Yujing,LIU Weifeng. Progress of the key techniques on 3D multicomponent seismic data processing[J]. Journal of Xi'an Shiyou University,2011,26(5):24–29.(in Chinese))
|
[10] |
杨 倩. 锤击震源不同参数激发的数值模拟研究[硕士学位论文][D]. 杭州:浙江大学,2018.(YANG Qian. Numerical simulation of hammer source with different excitation parameters[M. S. Thesis][D]. Hangzhou:Zhejiang University,2018.(in Chinese))
|
[1] |
李术才,刘 斌,孙怀凤,等. 隧道施工超前地质预报研究现状及发展趋势[J].岩石力学与工程学报,2014,33(6):1 090–1 113.(LI Shucai,LIU Bin,SUN Huaifeng,et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(6):1 090– 1 113.(in Chinese))
|
[4] |
钱七虎. 地下工程建设安全面临的挑战与对策[J]. 岩石力学与工程学报,2012,31(10):1 945–1 956.(QIAN Qihu. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(10):1 945–1 956.(in Chinese))
|
[11] |
郭德祥. 三维地震勘探观测系统的设计与应用研究[硕士学位论文][D]. 西安:长安大学,2017.(GUO Dexiang. Study on design and application of 3D seismic geometry[M. S. Thesis][D]. Xi?an:Chang'an University,2017.(in Chinese))
|
[12] |
宋 杰. 隧道施工不良地质三维地震波超前探测方法及其工程应用[博士学位论文][D]. 济南:山东大学,2016.(SONG Jie. The 3D seismic prospecting method and application in tunnel construction[Ph. D. Thesis][D]. Jinan:Shandong University,2016.(in Chinese))
|