[2] |
冯夏庭,张传庆,李邵军,等. 深埋硬岩隧洞动态设计方法[M]. 北京:科学出版社,2013:1–20.(FENG Xiating,ZHANG Chuanqing,LI Shaojun,et al. Dynamic design method for deep tunnels in hard rock[M]. Beijing:Science Press,2013:1–20.(in Chinese))
|
[3] |
徐干成,郑颖人,乔春生,等. 地下工程支护结构与设计[M]. 北京:中国水利水电出版社,2013:12–23.(XU Gancheng,ZHENG Yingren,QIAO Chunsheng,et al. Design of underground engineering support structure[M]. Beijing:China Water and Power Press,2013:12–23.(in Chinese))
|
[4] |
MARTIN C D. Seventeenth Canadian geotechnical colloquium:The effect of cohesion loss and stress path on brittle rock strength[J]. Canadian Geotechnical Journal,1997,34(4):698–725.
|
[6] |
EBERHARDT E,SREAD D,STIMPSON B. Quantifying progressive pre-peak brittle fracture damage in rock during uniaxial compression[J]. International Journal of Rock Mechanics and Mining Sciences,1999,36(3):361–380.
|
|
|
[5] |
MARTIN C D,CHANDLER N A. The progressive fracture of Lac du Bonnet granite[J]. International Journal of Rock Mechanics and Mining Sciences,1994,31:643–659.
|
[8] |
刘 宁,张春生,褚卫江,等. 深埋大理岩脆性破裂细观特征分析[J]. 岩石力学与工程学报,2012,31(增.2):3 557–3 565.(LIU Ning,ZHANG Chunsheng,CHU Weijiang,et al. Microscopic characteristics analysis of brittle failure of deep buried marble[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31 (Supp.2):3 557–3 565.(in Chinese))
|
[10] |
朱焕春,吴家耀,朱永生,等. 锦屏二级水电站引水隧洞围岩稳定、动态支护设计专题研究—2010年阶段性总结报告[R]. 武汉:Itasca(武汉)咨询有限公司,2010.( ZHU Huanchun,WU Jiayao,ZHU Yongsheng,et al. Research on surrounding rock stability,dynamic supporting design of Jinping II hydropower station diversion tunnel – 2010 stage summary report[R]. Wuhan:Itasca consulting Co.,Ltd.. 2010.(in Chinese))
|
[14] |
张春生,陈祥荣,侯 靖,等. 锦屏二级水电站深埋大理岩力学特性研究[J]. 岩石力学与工程学报,2010,29(10):1 999–2 009.(ZHANG Chunsheng,CHEN Xiangrong,HOU Jing,et al. Study of mechanical behavior of deep-buried marble at jinping ii hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 999–2 009.(in Chinese))
|
[9] |
MARTIN C D,KAISER P K,MCCREATH D R. Hoek-Brown parameters for predicting the depth of brittle failure around tunnels[J]. Canadian Geotechnical Journal,1999,36(1):136–151.
|
[11] |
READ R S. 20 Years of excavation response studies at AECL's underground research laboratory[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(8):1 251–1 275.
|
[12] |
MARTINO J B,CHANDLER N A. Excavation–induced damage studies at the Underground Research Laboratory[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(8):1 413–1 426.
|
[13] |
刘 宁,张春生,褚卫江. 锦屏深埋大理岩破裂特征与损伤演化规律[J]. 岩石力学与工程学报,2012,31(8):1 606–1 613.(LIU Ning,ZHANG Chunsheng,CHU Weijiang. Microscopic characteristics analysis of brittle failure of deep buried marble[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(8):1 606–1 613.(in Chinese))
|
[1] |
何满潮. 深部的概念体系及工程评价指标[J]. 岩石力学与工程学报,2005,24(16):2 854–2 858.(HE Mao-chao. Conception system and evaluation indexes for deep engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(16):2 854–2 858.(in Chinese))
|
[7] |
MARTIN C D. The strength of massive Lac du Bonnet granite around underground opening[Ph. D. Thesis][D]. Winnipeg:University of Winnipeg,1993.
|