[1] |
刘允芳,尹健民,刘元坤,等. 地应力测量方法和工程应用[M]. 武汉:湖北科学技术出版社,2014:12.(LIU Yunfang,YIN Jianmin,LIU Yuankun,et a1. Geostress measurement methods and engineering application[M]. Wuhan:Hubei Science and Technology Press,2014:12.(in Chinese))
|
[2] |
尹健民,李永松,陈建平,等. 基于多源信息集成的地应力场分析研究[J]. 岩石力学与工程学报,2012,31(增2):3 950-3 958. (YIN Jianmin,LI Yongsong,CHEN Jianping,et al. In-situ stress field analysis based on multi-source information integration[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.2):3 950-3 958.(in Chinese))
|
[3] |
付成华,汪卫明,陈胜宏. 溪洛渡水电站坝区初始地应力场反演分析研究[J]. 岩石力学与工程学报,2006,25(11):2 305-2 312. (FU Chenghua,WANG Weiming,CHEN Shenghong. Back analysis study of initial geostress field of dam site for Xiluodu hydropower project[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2 305-2 312.(in Chinese))
|
[4] |
HAIMSON B C,CORNET F H. ISRM suggested methods for rock stress estimation-Part 3:Hydraulic fracturing(HF)and/or hydraulic testing of pre-existing fractures(HTPF)[J]. International Journal of Rock Mechanics and Mining Sciences,2003,40(7/8):1 01l-1 020.
|
[5] |
柴贺军,刘浩吾,王明华. 大型电站坝区应力场三维弹塑性有限元模拟与拟合[J]. 岩石力学与工程学报,2002,21(9):1 314-1 318. (CHAI Hejun,LIU Haowu,WANG Minghua. Stress field simulation and fitting by 3Delastoplastic finite element for large hydropower project[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1 314-1 318.(in Chinese))
|
[6] |
张新辉,尹健民,张向阳,等. 卡里巴水电站地下厂房区应力场回归分析及评价[J]. 长江科学院院报,2015,32(7):77-81. (ZHANG Xinhui,YIN Jianmin,ZHANG Xiangyang,et al. Regression analysis and evaluation for the in-situ stress field of Kariba hydropower plant?s underground powerhouse[J]. Journal of Yangtze River Scientific Research Institute,2015,32(7):77-81.(in Chinese))
|
[7] |
郭怀志,马启超,薛玺成,等. 岩体初始应力场的分析方法[J]. 岩土工程学报,1983,5(3):64-75.(GUO Huaizhi,MA Qichao,XUE Xicheng,et al. The analytical method of the initial stress field for rock masses[J]. Chinese Journal of Geotechnical Engineering,1983,5(3):64-75(in Chinese))
|
[8] |
代 聪,何 川,陈子全,等. 超大埋深特长公路隧道初始地应力场反演分析[J]. 中国公路学报,2017,30(10):100-108.(DAI Cong,HE Chuan,CHEN Ziquan,et al. Inverse analysis of initial ground stress field of deep embedded and extra long highway tunnel[J]. China Journal of Highway and Transport,2017,30(10):100-108. (in Chinese))
|
[9] |
尤哲敏,陈建平,李永松,等. 大坪山深埋公路隧道地应力场分布规律探讨[J]. 地下空间与工程学报,2013,9(2):279-283. (YOU Zhemin,CHEN Jianping,LI Yongsong,et al. Discussion on distribution of in-situ stress in highway tunnel with great depth in Daping mountain[J]. Chinese Journal of Underground Space and Engineering,2013,9(2):279-283.(in Chinese))
|
[10] |
汪 波,何 川,吴德兴,等. 苍岭特长公路隧道地应力场反演分析[J]. 岩土力学,2012,33(2):628-634.(WANG Bo,HE Chuan,WU Dexing,et al. Inverse analysis of in-situ stress field of Cangling super-long highway tunnel[J]. Rock and Soil Mechanics,2012,33(2):628-634.(in Chinese))
|
[11] |
ZHANG Z, GONG R, ZHANG H,et al. Initial ground stress field regression analysis and application in an extra-long tunnel in the western mountainous area of China[J]. Bulletin of Engineering Geology and the Environment,2021. Doi:10.1007/S10064-021- 02131-7
|
[12] |
赵德安,李国良,陈志敏,等. 乌鞘岭隧道三维地应力场多元有限元回归拓展分析[J]. 岩石力学与工程学报,2009,28(增1):2 687- 2 694.(ZHAO De?an,LI Guoliang,CHEN Zhimin,et al. Three- dimensional regression analysis of multivariate geostress field of Wushaoling tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):2 687-2 694.(in Chinese))
|
[13] |
余云燕,李国良,赵德安,等. 两水隧道地应力测量及三维地应力场多元回归分析[J]. 现代隧道技术,2016,53(4):29-36.(YU Yunyan,LI Guoliang,ZHAO De?an,et al. Geostress measurement and 3D multivariate regression analysis of the geostress field of the Liangshui tunnel[J]. Modern Tunnelling Technology,2016,53(4):29-36.(in Chinese))
|
[14] |
周 朝. 地下洞室群施工期微震活动特征及围岩稳定性分析[硕士学位论文][D]. 武汉:长江科学院,2019.(ZHOU Chao. Microseismic activity characteristics and surrounding rock stability analysis of underground caverns during construction period[M. S. Thesis][D]. Wuhan:Yangze River Scientific Research Institute,2019.(in Chinese))
|