| Centrifugal test on settlement of tram pile plate structure embankment
in deep soft area |
| WANG Changdan1,2,CHEN Kaixiang1,2,SHAN Yao1,2,ZHOU Shunhua1,2,WANG Binglong1,2,LI Liang1,2 |
| (1. Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China;
2. Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety,Tongji University,Shanghai 201804,China) |
|
|
|
|
Abstract The tram pile plate structure,a new embankment structure,is proposed in recent years. In order to achieve the purpose of bearing the upper load by the piles and soil between the piles,friction piles with sparse arrangement are used in the embankment. The embankment settlement and soil displacement field of the tram pile plate structure are studied by centrifugal model test. The results show that the tram embankment settlement meets the requirements of the code. The upper load is shared by piles and soil between piles,and there is no void under the plate. Pile length and pile spacing have a significant effect on embankment settlement. The embankment settlement increases with the increase of pile spacing,while it decreases with the increase of pile length. The embankment settlement increases gradually at the initial stage of operation. In the later stage of operation,the increasing degree of embankment settlement is small,and the embankment settlement tends to be stable. The settlement of the soil around pile decreases gradually along the depth,and there is an inflection point near the pile end. The relative displacement of pile-soil does not have a negative value and gradually increases with the depth. The settlements of the soil on pile tip and under plate are the same. There is differential settlement between the soil around the pile and in the middle of the span. The greater the depth,the more obvious the difference.
|
|
|
|
|
|
|
[1] 钟志彬,李安洪,邓荣贵,等. 高速铁路红层软岩路基时效上拱变形机制研究[J]. 岩石力学与工程学报,2020,39(2):327–340.(ZHONG Zhibin,LI Anhong,DENG Ronggui,et al. Study on time-dependent upheaval deformation mechanisms of red-bed soft rock embankment of high-speed railways[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(2):327–340.(in Chinese))
[2] 张永亮,宁贵霞,陈兴冲. 高速铁路重力式桥墩桩基础的抗震设计及研究进展[J]. 岩石力学与工程学报,2015,34(增1):3 518–3 524. (ZHANG Yongliang,NING Guixia,CHEN Xingchong. Seismic design and research development for pile foundations of gravity pier in high-speed railway bridge[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1):3 518–3 524.(in Chinese))
[3] 杨 斌. 桩板结构技术在高铁施工中的实践探究[J]. 工程建设与设计,2017,(3):96–97.(YANG Bin. The practice of pile plank structure technology in high speed railway construction[J]. Construction and Design for Engineering,2017,(3):96–97.(in Chinese))
[4] 王浩天,董 胜. 基于p-y曲线法的高桩码头全结构段和单排架模型对比研究[J]. 工程力学,2019,36(增1):278–284.(WANG Haotian,DONG Sheng. Comparative study on full-structure segment and single-row models of high-pile wharves based on the p-y curve method[J]. Engineering Mechanics,2019,36(Supp.1):278–284.(in Chinese))
[5] 詹永祥,蒋关鲁. 无碴轨道路基基床动力特性的研究[J]. 岩土力学,2010,31(2):392–396.(ZHAN Yongxiang,JIANG Guanlu. Study of dynamic characteristics of soil embankment bed for ballastless track[J]. Rock and Soil Mechanics,2010,31(2):392–396.(in Chinese))
[6] 荆志东,郭永春,邱恩喜,等. 新型桩板结构对高速铁路软基沉降控制作用离心试验[J]. 岩土力学,2010,31(8):2 565–2 569.(JING Zhidong,GUO Yongchun,QIU Enxi,et al. Centrifuge test of new pile-plate structure embankment settlement of soft soil of high-speed railway[J]. Rock and Soil Mechanics,2010,31(8):2 565–2 569.(in Chinese))
[7] ZHANG D B,YI Z,KIM C W,et al. Effectiveness of CFG pile-plate structure on soft soil for supporting high-speed railway embankment[J]. Soils and Foundations,2018,58(6):1 458–1 475.
[8] MESSIOUD S,OKYAY U S,SBARTAI B,et al. Dynamic Response of Pile Reinforced Soils and Piled Foundations[J]. Geotechnical and Geological Engineering,2016,34(3):1–17.
[9] MESSIOUD S,SBARTAI B,DIAS D. et al. Estimation of dynamic impedance of the soil-pile-plate and soil-pile-mattress-plate systems[J]. International Journal of Structural Stability and Dynamics,2016,17(6):1750057.1–1750057.17.
[10] FAGUNDES D,ALMEIDA M S S,THOREL L,et al. Load transfer mechanism and deformation of reinforced piled embankment[J]. Geotextiles and Geomembranes,2017,45(2):1–10.
[11] OKYAY U S,DIAS D,BILLION P,et al. Impedance Functions of Plate Foundations with Rigid Piles[J]. Geotechnical and Geological Engineering,2012,30(4):1 013–1 024.
[12] 徐光明,任国峰,顾行文,等. 新型板桩码头群桩基础被动段桩侧压力试验研究[J]. 岩土工程学报,2018,40(3):502–511.(XU Guangming,REN Guofeng,GU Xingwen,et al. Experimental study on lateral pile-soil pressure on passive part of pile groups in innovative sheet-pile wharf[J]. Chinese Journal of Geotechnical Engineering,2018,40(3):502–511.(in Chinese))
[13] 徐光明,李士林. 板桩码头中群桩基础联接型式的试验研究[J]. 岩石力学与工程学报,2016,35(增1):3 365–3 371.(XU Guangming,LI Shilin. Experimental study of head fixity conditions of pile group in sheet-pile bulkhead[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(Supp.1):3 365–3 371.(in Chinese))
[14] 张 昊,邓永锋,刘夫江,等. 遮帘式板桩码头结构土压力特性模型试验研究[J]. 东南大学学报:自然科学版,2015,45(6):1 175–1 179.(ZHANG Hao,DENG Yongfeng,LIU Fujiang,et al. Model experiment study on soil pressure characteristics of sheet-pile barrier wharf structure[J]. Journal of Southeast University:Natural Science,2015,45(6):1 175–1 179.(in Chinese))
[15] 中国城市轨道交通协会. 城市轨道交通2017年度统计和分析报告[J]. 城市轨道交通,2018,(4):6.(China Urban Rail Transit Association. Statistical and analysis report of urban rail transit in 2017[J]. Urban Rail Transit,2018,(4):6.(in Chinese))
[16] 邓长茂. 现代有轨电车基床结构设计方法研究[J]. 路基工程,2016,(1):56–60.(DENG Changmao. Research on design method of modern trams roadbed structure[J]. Embankment Engineering,2016,(1):56–60.(in Chinese))
[17] 殷一弘. 深厚软土地层紧邻地铁深大基坑分区设计与实践[J]. 岩土工程学报,2019,41(增1):129–132.(YIN Yihong. Design and practice of partitioning of deep large foundation pits close to subway in thick soft soils[J]. Chinese Journal of Geotechnical Engineering,2019,41(Supp.1):129–132.(in Chinese))
[18] YAO JIANPING,CAI DEGOU,CHENG GUANZHI. et al. The Key technology of high-speed railway foamed lightweight soil embankment[J]. Lecture Notes in Civil Engineering,2020,164:489–501.
[19] 秦晓光. 现代有轨电车线路深厚软土地基一体化桩板结构沉降控制研究[J]. 城市轨道交通研究,2019,22(6):80–84.(QIN Xiaoguang. Settlement control of modern tram integrated pile-slab structure in deep soft soil foundation[J]. Urban Mass Transit,2019,22(6):80–84.(in Chinese))
[20] SHEN Y,XU H,TAO M,et al. Settlement of soft clay embankment under coupled effects of vibration frequency and dynamic stress ratio caused by high-speed train loads[J]. Soil Mechanics and Foundation Engineering,2017,54(2):87–96.
[21] 黄 龙,王炳龙,周顺华. 软土地基桩板结构路基离心模型试验研究[J]. 岩土力学,2013,34(增1):192–196.(HUANG Long,WANG Binglong,ZHOU Shunhua. Centrifugal model test of pile-plank embankment in soft ground[J]. Rock and Soil Mechanics,2013,34(Supp.1):192–196.(in Chinese))
[22] 李柱雄. 深厚软弱土层复合桩板路基承载机制[硕士学位论文][D]. 上海:同济大学,2020.(LI Zhuxiong. Bearing mechanism of composite pile-plank embankment in deep soft ground[M. S. Thesis][D]. Shanghai:Tongji University,2020.(in Chinese))
[23] 曾有金,章为民,王年香. 桩基模型试验研究现状[J]. 岩土力学,2003,24(增2):674–682.(ZENG Youjin,ZHANG Weimin,WANG Nianxiang,et al. Reviews of state-of-art of modeling simulation on pile foundations[J]. Rock and Soil Mechanics,2003,24(Supp.2):674–680.(in Chinese))
[24] 刘飞成. 悬浮桩桩网复合地基路堤工作机制及其设计方法研究[博士学位论文][D]. 成都:西南交通大学,2018.(LIU Feicheng. Analysis on working mechanisms and design process of geosynthetic-reinforced embankment supported by floating piles[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2018.(in Chinese))
[25] 陕 耀,陆 义,周顺华,等. 有轨电车桩板结构路基与道路路基横向差异沉降离心试验研究[J]. 岩石力学与工程学报,2020,39(5):1 049–1 060.(SHAN Yao,LU Yi,ZHOU Shunhua,et al. Centrifugal model test study on lateral differential settlement between the tram pile-plank embankment and the road embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(5):1 049–1 060.(in Chinese))
[26] 李季平. 基于数字图像处理的叶片三维大位移测量研究[博士学位论文][D]. 南京:南京航空航天大学,2009.(LI Jiping. Research on three-dimensional large displacement measurement of a vane based on digital image processing[Ph. D. Thesis][D]. Nanjing:Nanjing University of Aeronautics and Astronautics,2009.(in Chinese))
[27] 中华人民共和国行业标准编写组. DG/TJ08–2213—2016有轨电车工程设计规范[S]. 上海:同济大学出版社,2016.(The Professional Standards Compilation Group of the People?s Republic of China. DG/TJ08–2213—2016 Code for design of tram engineering[S]. Shanghai:Tongji University Press,2016.(in Chinese))
|
|
|
|