Citation Search Quick Search
  2024, Vol. 43 Issue (2): 333-357    DOI: 10.13722/j.cnki.jrme.2023.0390
Artiles Current Issue | Archive | Adv Search |
Research progress on key technologies for safe construction and efficient operation of the Dianzhong water diversion project-underground engineering
ZHANG Yanjie1,2,PU Shijiang2,ZHOU Hui3,WANG Jinguo4,WU Shunchuan2,DING Xiuli5
(1. Yunnan Dianzhong Water Diversion Engineering Co.,Ltd.,Kunming,Yunnan 650000,China;2. Faculty of Land Resources Engineering,Kunming University of Science and Technology,Kunming,Yunnan 650000,China;3. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;4. School of Earth Science and Engineering,Hohai University,Nanjing,Jiangsu 210000,China;
5. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Changjiang River Scientific Research Institute,Wuhan,Hubei 430010,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号