Citation Search Quick Search
  2026, Vol. 45 Issue (11): 3254-3265    DOI: 10.3724/1000-6915.jrme.2026.0068
Artiles Current Issue | Archive | Adv Search |
Analytical solution for stress-displacement in shallow triple-parallel tunnels considering construction sequencing
LI Yongsuo1, 2, QI Kai3, HU Da1, 2*, TAN Ze1, 2, SHEN Zhaolong1, 2
(1. Hunan Engineering Research Center of Structural Safety and Disaster Prevention for Urban Underground Infrastructure, Hunan City University, Yiyang, Hunan 413000, China; 2. School of Civil Engineering, Hunan City University, Yiyang, Hunan 413000, China; 3. Zhejiang Hengming Emergency Management Co., Ltd., Ningbo, Zhejiang 315000, China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号