参考文献(References):
[1] 石小艺,张孟喜,柯宁静,等. 三线盾构隧道渐次掘进扰动影响分析[J]. 上海大学学报:自然科学版,2024,30(3):401–413.(SHI Xiaoyi,ZHANG Mengxi,KE Ningjing,et al. Analysis of the successive excavation disturbance of three-line shield tunneling[J]. Journal of Shanghai University:Natural Science,2024,30(3):401–413.(in Chinese))
[2] SULIMAN L,LIU X,YANYANG S,et al. Settlement characteristics due to the excavation of multiple parallel tunnels at small distances[J]. Transportation Infrastructure Geotechnology,2025,12(6):204.
[3] 李 朋,徐海清,李振伟. 紧邻多孔交叠盾构隧道施工影响分析[J]. 岩土力学,2011,32(增1):761–765.(LI Peng,XU Haiqing,LI Zhenwei. Analysis on construction influence of four adjacent and overlapped shield tunnels[J]. Rock and Soil Mechanics,2011,32(Supp.1):761–765.(in Chinese))
[4] ZHANG Z,HUANG M. Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil[J]. Computers and Geotechnics,2014,56:121–132.
[5] 张晓清,张孟喜,李 林,等. 多线叠交盾构隧道近距离穿越施工扰动机制研究[J]. 岩土力学,2017,38(4):1 133–1 140.(ZHANG Xiaoqing,ZHANG Mengxi,LI Lin,et al. Mechanism of approaching construction disturbance caused by multi-lineoverlapped shield tunnelling[J]. Rock and Soil Mechanics,2017,38(4):1 133–1 140.(in Chinese))
[6] 刘 宁,黄义雄,蔡 炜,等. 品字形隧道安全间距与开挖长度地表沉降分析[J]. 华中科技大学学报:自然科学版,2021,49(5):98–103.(LIU Ning,HUANG Yixiong,CAI Wei,et al. Analysis of ground settlement on safety spacing and excavation length of triangle tunnel[J]. Journal of Huazhong University of Science and Technology :Natural Science,2021,49(5):98–103.(in Chinese))
[7] 李 然,陈 平,张顶立,等. 大断面三孔小净距隧道围岩稳定性数值研究及工程实践[J]. 土木工程学报,2022,55(11):83–95.(LI Ran,CHEN Ping,ZHANG Dingli,et al. Numerical study and engineering practice for surroundingrock stability of large cross-sectional triple tunnels[J]. China Civil Engineering Journal,2022,55(11):83–95.(in Chinese))
[8] 陈 鹏,杨小礼,黄 阜. 浅埋三孔隧道围岩位移场解析解研究[J]. 铁道科学与工程学报,2011,8(1):87–90.(CHEN Peng,YANG Xiaoli,HUANG Fu. Analytical solutions of surounding displacement fields in shallow three tunnels[J]. Journal of Railway Science and Engineering,2011,8(1):87–90.(in Chinese))
[9] 方黄城,张顶立,文 明,等. 任意多孔条件下围岩力学分析的非迭代解析方法[J]. 岩石力学与工程学报,2020,39(11):2 204–2 212. (FANG Huangcheng,ZHANG Dingli,WEN Ming,et al. A non-iterative analytical method for mechanical analysis of surrounding rock with arbitrary shape holes[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(11):2 204–2 212.(in Chinese))
[10] 王 浩,杨新安,王 斌,等. 3洞小净距隧道围岩压力计算方法[J]. 中国铁道科学,2020,41(3):68–75.(WANG Hao,YANG Xin’an,WANG Bin,et al. Calculation method for surrounding rock pressure of closely spaced triple tunnels[J]. China Railway Science,2020,41(3):68–75.(in Chinese))
[11] 吴开华,石恩岭,俞洪政,等. 非对称三孔小净距隧道围岩压力分析[J]. 地下空间与工程学报,2022,18(增1):65–73.(WU Kaihua,SHI Enling,YU Hongzheng,et al. Analysis on surrounding rock pressure of unsymmetrical three-hole small-spacing tunnel[J]. Chinese Journal of Underground Space and Engineering,2022,18(Supp.1):65–73.(in Chinese))
[12] PECK R B. Deep excavations and tunneling in soft ground[C]// Proceedings of the 7th ICSMFE. Mexico:International Society for Soil Mechanics and Geotechnical Engineering(ISSMGE),1969:225–290.
[13] WANG Y,DAI F,DING B,et al. Study on the effect of excavation sequence of three-hole shield tunnel on surface settlement and segment deformation[J]. Scientific Reports,2023,13(1):16971.
[14] WANG G,SHI L,WANG J,et al. Experimental and numerical studies on the seismic response of adjacent horizontal parallel tunnels[J]. Soil Dynamics and Earthquake Engineering,2023,172:107992.
[15] 刘维正,张思宇,陈 旺,等. 砂砾地层小净距多孔顶管先后顶进叠加扰动效应分析[J]. 中南大学学报:自然科学版,2025,56(1):138–155.(LIU Weizheng,ZHANG Siyu,CHEN Wang,et al. Analysis of superposed disturbance effects of successive construction of multiple pipe-jacking with small spacing in sand and gravel strata[J]. Journal of Central South University:Science and Technology,2025,56(1):138–155.(in Chinese))
[16] LEI M F,SHI Y B,TANG Q L,et al. Construction control technology of a four-hole shield tunnel passing through pile foundations of an existing bridge:A case study[J]. Journal of Central South University,2023,30(7):2 360–2 373.
[17] 李 然. 深埋三孔小净距隧道施工力学行为及其控制[J]. 岩石力学与工程学报,2023,42(6):1 560.(LI Ran. Mechanical behavior and stability control of deeply buried closely spaced triple tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2023,42(6):1 560.(in Chinese))
[18] VERRUIJT A,BOOKER J. Surface settlements due to deformation of a tunnel in an elastic half plane[J]. Géotechnique,1998,48(5):709–713.
[19] BOBET A,YU H,TIWARI N. Seismic response of shallow circular openings to Rayleigh waves[J]. Tunnelling and Underground Space Technology,2023,135:105036.
[20] 杨 峰,高廉镇,高益康,等. 多洞并行隧道围岩稳定性与破坏模式极限分析[J]. 岩土工程学报,2023,45(5):976–985.(YANG Feng,GAO Lianzhen,GAO Yikang,et al. Stability of surrounding rock and failure mode of parallel multi-line tunnels[J]. Chinese Journal of Geotechnical Engineering,2023,45(5):976–985.(in Chinese))
[21] LIU W,ZHANG S,CHEN W,et al. Analytical method for the vertical response of existing shield tunnel induced by above-crossing multiple parallel pipe jacking[J]. Tunnelling and Underground Space Technology,2025,165:106873.
[22] MA Y,LU A,CAI H,et al. Analytical solution for determining the plastic zones around two unequal circular tunnels[J]. Tunnelling and Underground Space Technology,2022,120:104267.
[23] LIU W,ZHANG P,WANG J,et al. Multi-conditional dynamic response of parallel multi-pipelines in the same tunnel based on leakage and explosion conditions—A case study of China-Myanmar tunnel pipelines[J]. International Journal of Pressure Vessels and Piping,2024,208:105145.
[24] 王 允,刘 江,李鹏飞,等. 深埋四孔小净距隧道围岩压力的计算方法[J]. 北京交通大学学报,2024,48(3):109–119.(WANG Yun,LIU Jiang,LI Pengfei,et al. Calculation method for surrounding rock pressure in deep-buried four-hole closely spaced tunnel[J]. Journal of Beijing Jiaotong University,2024,48(3):109–119.(in Chinese))
[25] 韩智铭,闫科宇,崔会敏,等. 基于等效面积法的三孔并行海底隧道渗流场解析研究[J]. 工程力学,2024,41(增1):112–116.(HAN Zhiming,YAN Keyu,CUI Huimin,et al. Analytical study on seepage field of three parallel submarine tunnels based on equivalent area method[J]. Engineering Mechanics,2024,41(Supp.1):112–116.(in Chinese))
[26] HUANG W,LIU W,OU M T,et al. Numerical analysis of disturbance control in a four-hole parallel tunnel crossing beneath existing tunnels[J]. Geotechnical and Geological Engineering,2025,43(2):75.
[27] 祁 凯,黎永索,胡 达. 基于复变函数迭代解析的双线盾构隧道施工顺序对地表沉降的影响[J]. 湖南城市学院学报:自然科学版,2025,34(6):1–6.(QI Kai,LI Yongsuo,HU Da. Influence of twin shield tunnel construction sequence on ground surface settlement based on complex variable function iterative analysis[J]. Journal of Hunan City University:Natural Science,2025,34(6):1–6.(in Chinese))
[28] 胡奕萍,武永新,贾 凯. 大直径三孔排水顶管重叠交错布置数值模拟研究[J]. 给水排水,2021,47(增2):433–438.(HU Yiping,WU Yongxin,JIA Kai. Numerical simulation of overlapping and staggered arrangement of large diameter three-hole drainage pipe jacking[J]. Water and Wastewater Engineering,2021,47(Supp.2):433–438.(in Chinese))
[29] 刘 波,陶龙光,丁城刚,等. 地铁双隧道施工诱发地表沉降预测研究与应用[J].中国矿业大学学报,2006,35(3):356–361.(LIU Bo,TAO Longguang,DING Chenggang,et al. Prediction for ground subsidence induced by subway double tube tunneling[J]. Journal of China University of Mining and Technology,2006,35(3):356–361.(in Chinese))
[29] 王晓睿,张 振,贾晓风. 基于高性能并行计算的隧道开挖数值模拟[J]. 地球科学,2015,40(12):2 119–2 124. (WANG Xiaorui,Zhang Zhen,JIA Xiaofeng. Analysis of numerical simulation of tunnel excavation based on high performance parallel finite element computing[J]. Earth Science,2015,40(12):2 119–2 124.(in Chinese))