|
|
|
PRELIMINARY DESIGN FOR TREATMENT OF FAULT AND IMPROVEMENT OF GROUTING QUALLITY IN TBM TUNNEL |
|
|
|
Abstract The preliminary design for t reatment of fault and improvement of grouting quality in TBM tunnel are presented. Using some hollow segment s for support liner , the geological st ructure , such as fault , crack , or even karst cavity could be easily dealt with. Moreover , the presented method does not hamper TBM′s work.
|
|
Received: 18 October 1999
|
|
|
|
| [1] |
KANG Hongpu1, 2, 3*, GAO Fuqiang1, 2, 3, WANG Xiaoqing1, 2, 3, YUAN Guiyang1, 2, 3, YANG Lei1, 2, 3, LOU Jinfu1, 2, 3. Development and application of a large-scale experimental system for roadway rockburst induced by fault slip[J]. , 2026, 45(6): 1599-1614. |
|
|
|
|