| APPLICATION OF HANG FORM AND MOIST SHOTCRETE TECHNOLOGY TO THE TUNNEL CONSTRUCTION |
| Deng You Dong |
| The NO.2 Construction.,ltd of the NO.12 Groups Of Railway Bnrea OF China Tai yuan 030032 China |
|
|
|
|
Abstract Take XiaoTuanShan tunnel as an example to introduces how to select of the original material of the shotcrete process and concrete mixture ratio ,the disposition of the production factors,the constors,the construction equipments,quality control and result analysis of the tunnel construction.
|
|