| CHALLENGE ISSUES IN CONSTRUCTION AND PROJECT OF LARGE-SCALE DEEP-BURIED TUNNEL GROUP OF JINPING II HYDROPOWER STATION |
| (Ertan Hydropower Development Co.,Ltd.,Chengdu,Sichuan 610051,China) |
|
|
|
|
Abstract Jinping II hydropower station includes four diversion tunnels,two auxiliary tunnels and one drainage tunnel,with a total tunnel length of 118 km. These tunnels are characterized as thick overburden,long length,large size in diameter,high geostress,complicated engineering geological conditions and high difficulty for project layout,which make the tunnel project the largest and most difficult hydro-tunnel group in the world. Key technical problems were met during the tunnels excavation,including the forecast and treatment of groundwater,and the prevention of rock burst. The studies and measures adopted against rock burst,the gushing water and the instability of surrounding rock mass during the construction of tunnels are summarized. The experience accumulated during the construction of the tunnels in Jinping II hydropower station shall provide valuable reference for similar projects.
|
|
Received: 28 May 2010
|
|
|
|
| [1] 吴世勇,王 坚,王 鸽. 锦屏水电站辅助洞工程地下水及治理对策[J]. 岩石力学与工程学报,2007,26(10):1 959–1 967.(WU Shiyong,WANG Jian,WANG Ge. Underground water and its treatment strategy in auxiliary tunnels of Jinping hydropower project[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):1 959–1 967.(in Chinese))
[2] 周春宏,曹 强,张升峰,等. 锦屏二级(一期)水电站长探洞勘测试验综合报告[R]. 杭州:国家电力公司华东勘测设计研究院,1999.(ZHOU Chunhong,CAO Qiang,ZHANG Shengfeng,et al. Jinping second level(first stage) hydropower station-master searches hole survey experiment general report[R]. Hangzhou:HydroChina Huadong Engineering Corporation,1999.(in Chinese))
[3] 武选正,李名川,伍宇腾. 锦屏水电枢纽辅助洞工程岩爆现象分析及防治措施[J]. 山东大学学报(工学版),2008,38(3):28–33.(WU Xuanzheng,LI Mingchuan,WU Yuteng. Analysis and prevention measures for rock burst in the auxiliary tunnel of the Jinping hydropower station[J]. Journal of Shandong University(Engineering Science),2008,38(3):28–33.(in Chinese))
[4] 肖学沛. 锦屏二级水电站交通隧道岩爆预测及防治研究[硕士学位论文][D]. 成都:成都理工大学,2005.(XIAO Xuepei. A Study on the prediction and prevention of rock burst in the traffic tunnel of Jinping II hydropower station[M. S. Thesis][D]. Chengdu:Chengdu University of Technology,2005.(in Chinese))
[5] 梁志勇. 锦屏二级水电站引水隧洞岩爆预测及防治对策研究[硕士学位论文][D]. 成都:成都理工大学,2005.(LIANG Zhiyong. Study on the prediction and prevention of rock burst in the diversion tunnel of Jinping II hydropower station[M. S. Thesis][D]. Chengdu:Chengdu University of Technology,2005.(in Chinese))
[6] 张镜剑,傅冰骏. 岩爆及其判据和防治[J]. 岩石力学与工程学报,2008,27(10):2 035–2 042.(ZHANG Jingjian,FU Bingjun. Rock burst and its criteria and control[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 035–2 042.(in Chinese))
[7] 冯夏庭,赵洪波. 岩爆预测的支持向量机[J]. 东北大学学报,2002,23(1):57–59.(FENG Xiating,ZHAO Hongbo. Prediction of rock burst using support vector machine[J]. Journal of Northeastern University,2002,23(1):57–59.(in Chinese))
[8] 苏国韶,冯夏庭,江 权. 高地应力下地下工程稳定性分析与优化的局部能量释放率新指标研究[J]. 岩石力学与工程学报,2006,25(12):2 453–2 460.(SU Guoshao,FENG Xiating,JIANG Quan. Study on new index of local energy release rate for stability analysis and optimal design of underground rock mass engineering with high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(12):2 453–2 460.(in Chinese))
[9] 冯夏庭. 地下洞室岩爆预报的自适应模式识别方法[J]. 东北大学学报,1994,15(5):471–475.(FENG Xiating. Underground hole room rock burst forecast auto-adapted pattern recognition methods[J]. Journal of Northeastern University,1994,15(5):471–475.(in Chinese))
[10] 申 骞,张小明,申玉良. 岩爆的研究现状及展望[J]. 山西建筑,2006,32(22):117–118.(SHEN Qian,ZHANG Xiaoming,SHEN Yuliang. Research present and prospect of rock outburst[J]. Shanxi Architecture,2006,32(22):117–118.(in Chinese))
[11] 吴世勇,任旭华,陈祥荣,等. 锦屏二级水电站引水隧洞围岩稳定分析及支护设计[J]. 岩石力学与工程学报,2005,24(20):3 777– 3 782.(WU Shiyong,REN Xuhua,CHEN Xiangrong,et al. Design for the liner and surrounding rocks of diversion tunnel in Jinping cascade II hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3 777–3 782.(in Chinese))
[12] 陈昌礼,欧阳孝忠. 锦屏水电站辅助洞高压大流量地下涌水的预防与治理[J]. 水利水电技术,2006,37(8):9–12.(CHEN Changli,OUYANG Xiaozhong. Prevention and control of ground water surge with high pressure and large flow for construction of auxiliary tunnel of Jinping hydropower station[J]. Water Resources and Hydropower Engineering,2006,37(8):9–12.(in Chinese))
[13] 马祖陆,周春宏,张之淦,等. 四川锦屏屏落水洞岩溶地下水示踪[J]. 中国岩溶,2006,25(3):201–210.(MA Zulu,ZHOU Chunhong,ZHANG Zhigan,et al. Tracer test to karst groundwater in Luoshuidong area,Jinping,Sichuan[J]. Carsologica Sinica,2006,25(3):201–210.(in Chinese))
[14] 李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217–225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst- fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217–225.(in Chinese))
[15] 唐春安,王继敏. 岩爆及其微震监测预报——可行性与初步实践[J]. 岩石力学与工程动态,2010,89(1):43–55.(TANG Chun′an,WANG Jimin. Rock and seismic monitoring and prediction—the feasibility and the preliminary practice[J]. Rock Mechanics and Engineering News,2010,89(1):43–55.(in Chinese)) |
| [1] |
CHEN Weizhong1*, LIU Xinyu1, 2, YANG Jianping1, WANG Wei1, 2, ZANG Zhonghai3, DING Hongyuan3, ZHANG Zheyuan3, WANG Xiaogang3, SHI Zhengrong1. Development of a large-scale 3D physical model test system for underground energy storage caverns and its model experimental study[J]. , 2026, 45(6): 1615-1628. |
|
|
|
|