| STUDY OF DISPLACEMENT PREDICTION MODEL OF LANDSLIDE BASED ON TIME SERIES ANALYSIS |
| 边坡工程;滑坡;位移预测;时间序列;GM(1,1)灰色模型;自回归(AR)模型 |
|
|
|
|
Abstract Based on the displacement monitoring data and displacement evolution of landslide,total displacement can be divided into trend term displacement which is controlled by its own geological conditions and periodic term displacement affected by external factors such as rainfall,water level changes,and so on. Then the displacement prediction model of landslide can be established by time series analysis. Double moving average method is used to separate the trend term displacement and periodic term displacement of landslide. On this basis,GM(1,1) grey model is used to forecast the trend term displacement;and autoregressive(AR) model is used to forecast the periodic term displacement. Total displacement is obtained by adding the calculated predictive displacement value of each sub-stack. Taking Bazimen landslide in the Three Gorges reservoir area for example,it is shown that the result could better reflect the development trend of landslide under external factors,based on the comparative analysis of the measured and predicted displacement-time curves. The results demonstrate that the established landslide displacement prediction model is feasible and effective in the landslide displacement prediction.
|
|
Received: 03 December 2010
|
|
|
|
| [1] 殷坤龙. 滑坡灾害预测预报[M]. 武汉:中国地质大学出版社,2004:3–9.(YIN Kunlong. Landslide hazard prediction and evaluation[M]. Wuhan:China University of Geosciences Press,2004:3–9.(in Chinese))
[2] 史爱民,康钦容,谢 瑜. 滑坡灾害时间预测预报研究现状及趋势[J]. 地下空间与工程学报,2008,4(6):1 183–1 188.(SHI Aiming,KANG Qinrong,XIE Yu. Review about the actuality and tendency of landslide disaster time prediction and evaluation[J]. Chinese Journal of Underground Space and Engineering,2008,4(6):1 183–1 188.(in Chinese))
[3] 李 强,李端有. 滑坡位移监测动态预报时间序列分析技术研究[J]. 长江科学院院报,2005,22(6):16–19.(LI Qiang,LI Duanyou. Study of dynamic predication technique for landslide displacement monitoring[J]. Journal of Yangtze River Scientific Research Institute,2005,22(6):16–19.(in Chinese))
[4] 许 强,黄润秋,李秀珍. 滑坡时间预测预报研究进展[J]. 地球科学进展,2004,19(3):478–483.(XU Qiang,HUANG Runqiu,LI Xiuzhen. Research progress in forecast and prediction of landslides[J]. Advance in Earth Sciences,2004,19(3):478–483.(in Chinese))
[5] 黄润秋. 论滑坡预报[J]. 国土资源科技管理,2004,(6):15–20.(HUANG Runqiu. On time predication of landslide[J]. Scientific and Technological Management of Land and Resources,2004,(6):15–20.(in Chinese))
[6] SAITO M. Forecasting the time of occurrence of a slope failure[C]// Proceedings of the 6th International Conference on Soil Mechanics and Foundation Engineering. Montreal:[s.n.],1965:537–541.
[7] 李天斌. 滑坡实时跟踪预报概论[J]. 中国地质灾害与防治学报,2002,13(4):17–22.(LI Tianbin. Introduction to real-time tracing prediction of landslide[J]. The Chinese Journal of Geological Hazard and Control,2002,13(4):17–22.(in Chinese))
[8] 殷坤龙,晏同珍. 滑坡预测及相关模型[J]. 岩石力学与工程学报,1996,15(1):1–8.(YIN Kunlong,YAN Tongzhen. Landslide prediction and relevant models[J]. Chinese Journal of Rock Mechanics and Engineering,1996,15(1):1–8.(in Chinese))
[9] 杜 娟,殷坤龙,柴 波. 基于诱发因素响应分析的滑坡位移预测模型研究[J]. 岩石力学与工程学报,2009,28(9):1 783–1 789.(DU Juan,YIN Kunlong,CHAI Bo. Study on the displacement prediction model of landslide based on the response analysis of inducing factors[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(9):1 783–1 789.(in Chinese))
[10] 秦四清,张倬元,王士天,等. 工程地质学的未来——非线性工程地质学[J]. 地质灾害与环境保护,1993,4(2):11–14.(QIN Siqing,ZHANG Zhuoyuan,WANG Shitian,et al. Future of the geological engineering—nonlinear engineering geology[J]. Geological Hazards and Environment Preservation,1993,4(2):11–14.(in Chinese))
[11] 黄润秋,许 强. 斜坡失稳时间的协同预测模型[J]. 山地研究,1997,15(1):7–12.(HUANG Runqiu,XU Qiang. Synergetic prediction model of slope instability[J]. Mountain Research,1997,15(1):7–12.(in Chinese))
[12] 潘红宇. 时间序列分析[M]. 北京:对外经济贸易大学出版社,2005:39–51.(PAN Hongyu. Time series analysis[M]. Beijing:University of International Business and Economics Press,2005:39–51.(in Chinese))
[13] 卢 理. 时间序列加法模型的分解预测研究[硕士学位论文][D]. 成都:西南交通大学,2007.(LU Li. Research on decomposition- forcasting of time series addition model[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2007.(in Chinese))
[14] KEEFER D K,WILSON R C,MARK R K,et al. Real-time landslide warning during heavy rainfall[J]. Science,1987,238(4 829):921–925.
[15] 邓聚龙. 灰理论基础[M]. 武汉:华中科技大学出版社,2002:218–238.(DENG Julong. Basis for grey theory[M]. Wuhan:Huazhong University of Science and Technology Press,2002:218–238.(in Chinese))
[16] 张闻胜,王银堂. 时间序列分解模型在水文要素中长期预报中的应用[J]. 水文,2001,21(1):21–24.(ZHANG Wensheng,WANG Yintang. Application of the time series decomposable model in medium and long-term hydrologic forecasting[J]. Hydrology,2001,21(1):21–24.(in Chinese))
[17] 张树京,齐立心. 时间序列分析简明教程[M]. 北京:北京交通大学出版社,2003:29–42.(ZHANG Shujing,QI Lixin. Concise course on time series analysis[M]. Beijing:Beijing Jiaotong University Press,2003:29–42.(in Chinese)) |
|
|
|