| STUDY OF REASONABLE SUPPORT PARAMETER FOR LARGE-SCALE SHIELD SHAFT IN SOFT SOIL AREA |
| GENG Yamei1,CHEN Weizhong1,2,TIAN Hongming2,CAO Junjie2,GUO Xiaohong3,QIAO Chunjiang3 |
(1. Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250061,China;
2. Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;3. Second Highway Consultants Co.,Ltd.,China Communications Construction Corporation,Wuhan,Hubei 430056,China) |
|
|
|
|
Abstract It is a technical difficulty to control the deformation and the stress condition of the structure of large-scale shield shaft in over-river shield tunnel project. This case study how to deal with the excavation of Jiangbei shield shaft of Weisan Road over-river tunnel at Nanjing City. Use four-factor at three-level orthogonal array experimental design method to proceed multifactor system analysis,studying the effect rule of deformation and stress of the whole support structure caused by the change of the thickness of ring beams,retaining wall,lining wall and bracings. The interaction relationships between each support component are obtained and analyzed;and through the quantification analysis of the total cost,a design scheme of the minimum total material cost is proposed which has been conditional on the security of the whole structure. This study indicates that:using orthogonal experimental design method to decide the reasonable support parameters of the shield shaft can minimize the calculation,obtain the optimal combination of the support parameters with the confirmation of stability,and achieve the best technical and economical result.
|
|
Received: 18 January 2011
|
|
|
|
| [1] 金雪莲,樊有维,李春忠,等. 带撑式基坑支护结构变形影响因素分析[J]. 岩石力学与工程学报,2007,26(增1):3 242–3 249.(JIN Xuelian,FAN Youwei,LI Chunzhong,et al. Analysis of factors affecting support structure deformation of foundation pit with brace[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):3 242–3 249.(in Chinese))
[2] 应宏伟,郭 跃. 软土深基坑分段施工效应三维有限元分析[J]. 岩石力学与工程学报,2008,27(增2):3 328–3 334.(YING Hongwei,GUO Yue. Three-dimensional finite element analysis for effects of step construction on deep soft soil foundation pits[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.2):3 328–3 334.(in Chinese))
[3] 丛蔼森. 多层地基深基坑的渗流稳定问题探讨[J]. 岩石力学与工程学报,2009,28(10):2 018–2 023.(CONG Aisen. Discussion on several issues of seepage stability of deep foundation pit in multilayered formation[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):2 018–2 023.(in Chinese))
[4] 刘 润,闫 玥,闫澍旺. 支撑位置对基坑整体稳定性的影响[J]. 岩石力学与工程学报,2006,25(1):174–178.(LIU Run,YAN Yue,YAN Shuwang. Stability analysis of foundation pit with position change of braces[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(1):174–178.(in Chinese))
[5] 熊孝波,桂国庆,郑明新,等. 基于ANSYS的深基坑围护结构变形数值模拟分析[J]. 地下空间与工程学报,2009,5(增):1 298– 1 305.(XIONG Xiaobo,GUI Guoqing,ZHENG Mingxin,et al. Numerical simulation of bracing structure deformation for a deep pit foundation based on ANSYS software[J]. Chinese Journal of Underground Space and Engineering,2009,5(Supp.):1 298–1 305. (in Chinese))
[6] FAHEEM H, CAI F, UGAI K. Three-dimensional base stability of rectangular excavations in soft soils using FEM[J]. Computers and Geotechnics,2004,31(2):67–74.
[7] KUNG G T C. Comparison of excavation-induced wall deflection using top-down and bottom-up construction methods in Taipei silty clay[J]. Computers and Geotechnics,2009,36(3):375–385.
[8] 周义德,赵楠楠,杨瑞梁. 基于四因素三水平的模拟方法分析布机车间分区空调影响因素[J]. 中原工学院学报,2009,20(3):12–15.(ZHOU Yide,ZHAO Nannan,YANG Ruiliang. The air-condition factor analysis of the clothe plant subarea based on four factors at three levels method[J]. Journal of Zhongyuan University of Technology,2009,20(3):12–15.(in Chinese))
[9] 郑明东,刘炼杰,余 亮,等. 化工数据建模与试验优化设计[M]. 合肥:中国科学技术大学出版社,2001:50–52.(ZHENG Mingdong,LIU Lianjie,YU Liang,et al. Chemical engineering data modeling and experimental optimization design[M]. Hefei:University of Science and Technology of China Press,2001:50–52.(in Chinese))
[10] 付 垚. 大面积深基坑开挖过程对周边建筑物影响数值分析研究[硕士学位论文][D]. 成都:西华大学,2009.(FU Yao. The numerical simulation in large deformation analysis of surrounding building in process of excavation[M. S. Thesis][D]. Chengdu:Xihua University,2009.(in Chinese))
[11] 舒伟富. 深基坑支护结构与土的相互作用机制研究[硕士学位论文][D]. 长沙:长沙理工大学,2009.(SHU Weifu. Research on interaction mechanism between soil and retaining structure in deep foundation pit[M. S. Thesis][D]. Changsha:Changsha University of Science and Technology,2009.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|