Abstract The construction of highway mountain tunnel is affected by various uncertain factors with random and fuzzy characteristic,which cannot be exactly analyzed by current risk assessment method. This paper proposes the fuzzy-analytic network process(F-ANP) which is composed by Delphi method,analytic network process and fuzzy comprehensive evaluation. Based on the analysis of the whole process in the construction of the highway mountain tunnel,a synthetic evaluation index system for the construction of highway mountain tunnel is established. A fuzzy relation matrix is established by evaluating the evaluation index with expert investigation,by using Delphi method to compare and using triangular fuzzy number to represent the judgment matrix,a fuzzy super matrix is established with the analytic network process,by evaluating its limit matrix can obtain the comprehensive weight,then obtain the level of construction risk. Finally,empirical research to Longtouling tunnel shows that the method is reasonable and practical,it can provide reference to risk analysis for future similar projects,ensure construction safety and reduce potential losses.
|
|
Received: 23 May 2013
|
|
|
|
| [1] 王国富,王渭明,冯玉国. 德尔菲法在边坡支挡设计方案优选中的应用[J]. 路基工程,2011,(4):138–140.(WANG Guofu,WANG Weiming,FENG Yuguo. Application of Delphi method in optimization of slope retaining program[J]. Subgrade Engineering,2011,(4):138–140.(in Chinese))
[2] 李树清,颜 智,段 瑜. 风险矩阵法在危险有害因素分级中的应用[J]. 中国安全科学学报,2010,20(4):83–87.(LI Shuqing,YAN Zhi,DUAN Yu. Application of risk matrix in classification of dangerous and hazardous factors[J]. China Safety Science Journal,2010,20(4):83–87.(in Chinese))
[3] 王长申,孙亚军,杭 远. 基于事故树分析的煤矿潜在突水危险评价研究[J]. 岩石力学与工程学报,2009,28(2):298–305.(WANG Changshen,SUN Yajun,HANG Yuan. Application of fault tree analysis to risk assessment of potential water-inrush hazards in coal mining[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(2):298–305.(in Chinese))
[4] SEJNOHA J,JARUSKOVA D,SPACKOVA O. Risk quantification for tunnel excavation process[J]. World Academy of Science,Engineering and Technology,2009,58:393–401.
[5] 符 蓉,叶 昆,宗 昕,等. 基于蒙特卡罗数值模拟的桥梁可靠度分析[J]. 土木工程与管理学报,2012,29(4):75–78.(FU Rong,YE Kun,ZONG Xin,et al. Reliability analysis of bridge based on Monte-Carlo numerical simulation[J]. Journal of Civil Engineering and Management,2012,29(4):75–78.(in Chinese))
[6] 王莲芬,许树柏. 层次分析法引论[M]. 北京:中国人民大学出版社,1990:5–18.(WANG Lianfen,XU Shubai. AHP introduction[M]. Beijing:China Renmin University Press,1990:5–18.(in Chinese))
[7] 许振浩,李术才,李利平,等. 基于层次分析法的岩溶隧道突水突泥风险评估[J]. 岩土力学,2011,32(6):1 757–1 766.(XU Zhenhao,LI Shucai,LI Liping,et al. Risk assessment of water or mud inrush of karst tunnels based on analytic hierarchy process[J]. Rock and Soil Mechanics,2011,32(6):1 757–1 766.(in Chinese))
[8] 王莲芬. 网络分析法(ANP)的理论与算法[J]. 系统工程理论与实践,2001,21(3):44–50.(WANG Lianfen. The theory and algorithms of ANP[J]. Systems Engineering Theory and Practice,2001,21(3):44–50.(in Chinese))
[9] 俞素平. 公路工程施工安全风险评估的网络分析法研究[J]. 地下空间与工程学报,2013,9(1):216–222.(YU Suping. Risk analysis of construction safety in highway engineering based on analytic network process and its application[J]. Chinese Journal of Underground Space and Engineering,2013,9(1):216–222.(in Chinese))
[10] 许传华,任青文. 地下工程围岩稳定性的模糊综合评判法[J]. 岩石力学与工程学报,2004,23(11):1 852–1 855.(XU Chuanhua,REN Qinwen. Fuzzy-synthetical evaluation on stability of surrounding rockmasses of underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(11):1 852–1 855.(in Chinese))
[11] 赵延喜,徐卫亚. 基于AHP和模糊综合评判的TBM施工风险评估[J]. 岩土力学,2009,30 (3):793–798.(ZHAO Yanxi,XU Weidong. Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation[J]. Rock and Soil Mechanics,2009,30 (3):793–798.(in Chinese))
[12] 刘仁辉,张劲强,韩喜双. 三角模糊数的工程项目风险识别[J]. 哈尔滨工业大学学报,2008,40(10):1 617–1 620.(LIU Renhui,ZHANG Jinqiang,HAN Xishuang. Risk identification based on triangular fuzzy number for construction project[J]. Journal of Harbin Institute of Technology,2008,40(10):1 617–1 620.(in Chinese))
[13] 赵和平. 环境综合评价模糊数学方法中4个算子的比较[J]. 贵州环保科技,2001,7(3):28–33.(ZHAO Heping. The comparison of 4 operators in fuzzy mathematical method to environment assessment [J]. Guizhou Environmental Protection Science and Technology,2001,7(3):28–33.(in Chinese))
[14] 李 蔚,管晓岩,崔范明. 基于多维特性的投保企业风险评价方法[J]. 系统工程,2007,25(6):49–52.(LI Wei,GUAN Xiaoyan,CUI Fanming. Risk evaluation method for guaranteed corporations based on multi-attributes[J]. Systems Engineering,2007,25(6):49–52.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|