| INFLUENCE OF SHIELD TUNNELING WITH TUNNELS FOLLOWED BY WELL EXCAVATION ON SEGMENT OPENING |
| YANG Chunshan,MO Haihong,CHEN Junsheng,LI Wei |
| (School of Civil Engineering and Transportation,South China University of Technology,Guangzhou,Guangdong 510641,China) |
|
|
|
|
Abstract In order to study the influence of shield tunneling with tunnels followed by well excavation on segment opening,under the precondition that it cannot easily be measured and tested,an elasto-plastic simulation is carried out with FEM program to analyze segment opening caused by the tunnels followed by well excavation. In combination with the typical engineering example,the influences of mechanical properties of soil,local reinforcement soil and groundwater level are discussed. The results indicate that influencing scope is mainly in five segment length near the continuous wall of work well,so analysis of seepage control during the construction should consider emphatically four joints near the work well. Segment opening is strongly impacted by the soil stiffness and it decreases with the increase of stiffness. Segment opening is not affected by soil strength index. It can use local reinforcement to effectively reduce the segment opening to prevent leakage of shield tunnel. The existence of groundwater above the segment has significant influence on segment opening,influencing scope is mainly in five segment length,but the water level has a tiny effect on segment opening. It suggests that it is necessary to perform local reinforcement in five segment length near the continuous wall of work well when adopting tunnels followed by well excavation to ensure the safety of tunnel.
|
|
Received: 21 May 2013
|
|
|
|
| [1] 孙成伟,张碧文. 广州地铁东山站站台隧道扩挖修建技术[J]. 现代隧道技术,2012,(3):176–181.(SUN Chengwei,ZHANG Biwen. Excavation technique of the tunnel at the Dongshan platform of the Guangzhou metro[J]. Modern Tunnelling Technology,2012,(3):176–181.(in Chinese))
[2] 熊 乾. 地铁先隧后站法施工技术[J]. 铁道标准设计,2009,(12):106–111.(XIONG Qian. Construction technology of excavating tunnel firstly and then well excavation[J]. Railway Standard Design,2009,(12):106–110.(in Chinese))
[3] 杜金龙,杨 敏. 邻近基坑桩基侧向变形加固控制分析[J]. 结构工程师,2008,24(5):93–99.(DU Jinlong,YANG Min. Deflection control analysis of pile adjacent to deep excavation[J]. Structural Engineers,2008,24(5):93–94.(in Chinese))
[4] 徐干成,李成学,王后裕,等. 地铁盾构隧道下穿京津城际高速铁路影响分析[J]. 岩土力学,2009,30(增2):269–276.(XU Gancheng,LI Chengxue,WANG Houyu,et al. Analysis of influence of metro shield tunneling crossing underneath high speed railway[J]. Rock and Soil Mechancis,2009,30(Supp.2):269–276.(in Chinese))
[5] 陈俊生,莫海鸿. 盾构隧道管片施工阶段力学行为的三维有限元分析[J]. 岩石力学与工程学报,2006,25(增2):3 482–3 489.(CHEN Junsheng,MO Haihong. Three-dimensional finite analysis of mechanical behaviors of shield tunnel segment during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 482–3 489.(in Chinese))
[6] 张海波,殷宗泽,朱俊高,等. 盾构法隧道衬砌施工阶段受力特性的三维有限元模拟[J]. 岩土力学,2005,26(6):990–994.(ZHANG Haibo,YIN Zongze,ZHU Jungao,et al. Three-dimensional FEM simulation of shield-driven tunnel lining during construction stage[J]. Rock and Soil Mechanics,2005,26(6):990–994.(in Chinese))
[7] 高 健. 考虑渗流的盾构隧道掘进面失稳分析[博士学位论文][D]. 天津:天津大学,2010.(GAO Jian. Analysis of face instability of shield tunnels with consideration of ground water seepage[Ph. D. Thesis][D]. Tianjin:Tianjin University,2010.(in Chinese))
[8] 胡国新,刘庭金,陈俊生,等. 基坑三维渗流对紧邻区间隧道影响的数值分析[J]. 铁道建筑,2007,(7):42–44.(HU Guoxin,LIU Tingjin,CHEN Junsheng,et al. Numerical analysis of influence of three dimensional seepage of deep foundation pit on adjacent tunnels[J]. Railway Engineering,2007,(7):42–44.(in Chinese))
[9] 郑永来,韩文星,童琪华,等. 软土地铁隧道纵向不均匀沉降导致的管片接头环缝开裂研究[J]. 岩石力学与工程学报,2005,24(24):4 552–4 558.(ZHENG Yonglai,HAN Wenxing,TONG Qihua,et al. Study on longitudinal crack of shield tunnel segment joint due to asymmetric settlement in soft soil[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(24):4 552–4 558.(in Chinese))
[10] 志波由纪夫,川島一彦. ツールドトンネルの耐震解析に用 い る长手方向覆工刚性の评価法[C]// 土木学会論文集. [S.l.]:[s.n.],1988:319–327.(SHIBA Y,KAWASHIMA T. The evaluation of the duct′s longitudinal rigidity in the seismic analysis of shield tunnel[C]// Proceedings of the Civil Academy. [S.l.]:[s.n.],1988:319–327.(in Japanese))
[11] 志波由纪夫,川島一彦. 応答変位法応答変位法にょるツ-ルドトンネルの地震时断面力の算定法[C]// 土木学会論文集. [S.l.]:[s.n.],1988:385–394.(SHIBA Y,KAWASHIMA T. Calculation of internal force of structure during earthquake using response displacement method[C]// Proceedings of the Civil Academy. [S.l.]:[s.n.],1988:385–394.(in Japanese))
[12] 田敬学,张庆贺. 盾构法隧道的纵向刚度计算方法[J]. 中国市政工程,2001,(3):35–37.(TIAN Jingxue,ZHANG Qinghe. Calculation of longitudinal rigidity of shield tunnels[J]. China Municipal Engineering,2001,(3):35–37.(in Chinese))
[13] 刘 印,张冬梅,黄宏伟. 基于纵向不均匀沉降的盾构隧道渗漏水机制分析[J]. 铁道工程学报,2011,(5):66–70.(LIU Yin,ZHANG Dongmei,HUANG Hongwei. Analysis of mechanism of water leakage induced by longitudinal uneven settlement of shield tunnel[J]. Journal of Railway Engineering Society,2011,(5):66–70.(in Chinese))
[14] 朱 令,丁文其,杨 波. 壁后注浆引起盾构隧道上浮对结构的影响[J]. 岩石力学与工程学报,2012,31(增1):3 377–3 382.(ZHU Ling,DING Wenqi,YANG Bo. Effect of shield tunnel uplift caused by back-filled grouting on structure[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.1):3 377–3 382.(in Chinese))
[15] 方 勇,何 川. 南京越江盾构隧道纵向抗弯能力研究[J]. 地下空间与工程学报,2009,5(4):670–674.(FANG Yong,HE Chuan. Study on the longitudinal anti-bending capacity of Nanjing cross-river shield tunnel[J]. Chinese Journal of Underground Space and Engineering,2009,5(4):670–674.(in Chinese))
[16] 胡承军,刘 燕,刘 涛. 坑外搅拌桩加固对基坑变形的影响分析[J]. 岩土工程学报,2006,28(增):1 858–1 860.(HU Chengjun,LIU Yan,LIU Tao. Researches on excavation deformation caused by cement mixing method outside excavation[J]. Chinese Journal of Geotechnical Engineering,2006,28(Supp.):1 858–1 860.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|