| ANALYSIS OF INTERACTION OF OVERALL STABILITY OF WUDONGDE SUPER-HIGH ARCH DAM AND UNDERGROUND POWERHOUSE |
| LIN Peng1,WANG Cheng1,WENG Yonghong2,CAO Quxiu2,HU Qingyi2 |
| (1. State Key Laboratory of Hydroscience and Hydraulic Engineering,Tsinghua University,Beijing 100084,China;2. The Yangtze River Survey Planning Design Limited Liability Company,Wuhan,Hubei 430010,China) |
|
|
|
|
Abstract Due to the terrain and the complicate geological conditions,the underground powerhouse near the abutment often affects the safety and stability of dam-foundation of super high arch dam. The interaction of dam and underground powerhouse at Wudongde dam was analyzed considering the influences of the distance,the angle and the strength of rock mass. 3D nonlinear finite element analysis with Drucker-Prager yield criterion was carried out. The displacements,the stress,the arch thrust and the overall safety factors of dam and powerhouse foundation of different analysis cases were obtained for analyzing the interaction of dam and underground powerhouse. The results show that the deformation of the abutment is larger when the powerhouse is close to the dam. The dam-powerhouse interaction has little influence on the overall stability of the dam-foundation system.
|
|
Received: 25 December 2013
|
|
|
|
| [1] 林 鹏,王仁坤,康绳祖,等. 特高拱坝基础破坏、加固与稳定关键问题研究[J]. 岩石力学与工程学报,2011,30(10):1 945–1 958. (LIN Peng,WANG Renkun,KANG Shengzu,et al. Study on key problems of foundation failure,reinforcement and stability for super high arch dams[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(10):1 945–1 958.(in Chinese))
[2] LIN P,ZHOU W Y,LIU H Y. Experimental study on cracking,reinforcement and overall stability of the Xiaowan super-high arch dam[J]. Rock Mechanics and Rock Engineering,2014,47(3):1 086–1 110,DOI:10.1007/s00603–014–0593–x.
[3] 樊启祥,周绍武,李炳锋. 溪洛渡特高拱坝建设的岩石工程关键技术[J]. 岩石力学与工程学报,2012,31(10):1 998–2 015.(FAN Qixiang,ZHOU Shaowu,LI Bingfeng. Key technologies of rock engineering for construction of Xiluodu superhigh arch dam[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(10):1 998–2 015.(in Chinese))
[4] LIN P,HUANG B,LI Q B,et al. Hazards and seismic reinforcement analysis for typical large dams following the Wenchuan earthquake[J]. Engineering Geology,2014,DOI:10.1016/j.enggeo.
[5] LIN P,MA T H,LIANG Z Z,et al. Failure and overall stability analysis on high arch dam based on DFPA code[J]. Engineering Failure Analysis,2014,45(1):164–184. DOI:10.1016/j.engfailanal.2014.06.020.
[6] 林 鹏,刘晓丽,胡 昱,等. 应力与渗流耦合作用下溪洛渡拱坝变形稳定分析[J]. 岩石力学与工程学报,2013,32(6):1 137–1 144. (LIN Peng,LIU Xiaoli,HU Yu,et al. Deformation and stability analysis of Xiluodu arch dam under stress-seepage coupling condition[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(6):1 137–1 144.(in Chinese))
[7] 周维垣,杨若琼,剡公瑞. 大坝整体稳定分析系统[J]. 岩石力学与工程学报,1997,16(5):424–430.(ZHOU Weiyuan,YANG Ruoqiong, YAN Gongrui. Integrity stability analysis system for large dams[J]. Chinese Journal of Rock Mechanics and Engineering,1997,16(5):424–430.(in Chinese))
[8] 张 冲,侯艳丽,金 峰,等. 拱坝–坝肩三维可变形离散元整体稳定分析[J]. 岩石力学与工程学报,2006,25(6):1 226–1 232.(ZHANG Chong,HOU Yanli,JIN Feng,et al. Analysis of arch dam-abutment stability by 3D deformable distinct elements[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 226–1 232.(in Chinese))
[9] LIN P,ZHOU W Y,YANG Q,et al. A new three-dimensional FEM model on arch dam cracking analysis[J]. Key Engineering Materials,2004,261–263:1 569–1 574.
[10] 王仁坤,林 鹏,周维垣. 复杂地基上高拱坝开裂与稳定研究[J]. 岩石力学与工程学报,2007,26(10):1 951–1 958.(WANG Renkun,LIN Peng,ZHOU Weiyuan. Cracking and stability problems of high arch dams on complicated rock foundations[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):1 951–1 958.(in Chinese))
[11] 任青文,钱向东,赵 引,等. 高拱坝沿建基面抗滑稳定性的分析方法研究[J]. 水利学报,2002,(2):1–7.(REN Qingwen,QIAN Xiangdong,ZHAO Yin,et al. Methods for analyzing sliding resistance stability along the base surface of high arch dam[J]. Journal of Hydraulic Engineering,2002,(2):1–7.(in Chinese))
[12] 周维垣,林 鹏,杨若琼,等 高拱坝地质力学模型试验方法与应用[M]. 北京:中国水利水电出版社,2008:118–188.(ZHOU Weiyuan,LIN Peng,YANG Ruoqiong,et al. Method and application of geomechanics model test on high arch dam[M]. Beijing:China Water Power Press,2008:118–188.(in Chinese))
[13] 李仲奎,卢达溶,中山元,等. 三维模型试验新技术及其在大型地下洞群研究中的应用[J]. 岩石力学与工程学报,2003,22(9):1 430–1 436.(LI Zhongkui,LU Darong,Nakayama,et al. Development and application of new technology for 3D geo-mechanics model test of large underground houses[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(9):1 430–1 436.(in Chinese))
[14] 朱维申,刘建华,杨法玉. 小浪底水利枢纽地下厂房岩体支护效果数值分析研究[J]. 岩土力学,2006,27(7):1 077–1 081.(ZHU Weishen,LIU Jianhua,YANG Fayu. Numerical analysis of supporting effect of underground caverns surrounding rockmass of Xiaolangdi key water control project[J]. Rock and Soil Mechanics,2006,27(7):1 077– 1 081.(in Chinese))
[15] 朱维申,李 勇,张 磊,等. 高地应力条件下洞群稳定性的地质力学模型试验研究[J]. 岩石力学与工程学报,2008,27(7):1 308–1 314.(ZHU Weishen,LI Yong,ZHANG Lei,et al. Geomechanical model test on stability of cavern group under high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 308–1 314.(in Chinese))
[16] LIN P,ZHOU W Y,LIU H Y,et al. Reinforcement design and stability analysis for large-span tailrace bifurcated tunnels with irregular geometry[J]. Tunnelling and Underground Space Technology,2013,38(9):189–204.
[17] 聂卫平,徐卫亚,周先平,等. 向家坝水电站地下厂房围岩稳定的黏弹塑性有限元分析[J]. 岩土力学,2010,31(4):1 276–1 282.(NIE Weiping,XU Weiya,ZHOU Xianping,et al. Viscoelasto-plastic finite element analysis of stability of surrounding rock for underground powerhouse of Xiangjiaba hydropower station[J]. Rock and Soil Mechanics,2010,31(4):1 276–1 282.(in Chinese))
[18] HOEK E,BROWNET. Underground excavations in rock[M]. [S. l.]:[s. n.],1980:1–60.
[19] 周维垣,杨 强. 岩石力学数值计算方法[M]. 北京:中国电力出版社,2005:1–685.(ZHOU Weiyuan,YANG Qiang. Numerical computational methods for rock mechanics[M]. Beijing:China Electric Power Press,2005:1–685.(in Chinese)) |
|
|
|