[1] |
WHITTAKER B N. Design and stability of pillar in long wall mining[J]. Mining Engineer,1979,13(25):68-72.
|
[2] |
王永秀,齐庆新,陈 兵. 煤柱应力分布规律的数值模拟分析[J].煤炭科学技术,2004,32(10):59-62.(WANG Yongxiu,QI Qingxin,CHEN Bing. Analysis on digital simulation for stress distribution law of coal pillar[J]. Coal Science and Technology,2004,32(10):59-62.(in Chinese))
|
[3] |
谢广祥,杨 科,常聚才. 煤柱宽度对综放面围岩应力分布规律影响[J]. 北京科技大学学报,2006,28(11):1 111-1 113(XIE Guangxiang,YANG Ke,CHANG Jucai. Effect of coal pillar width on the stress distribution law of surrounding rocks in fully mechanized top-coal caving mining face[J]. Journal of University of Science and Technology Beijing,2006,28(11):1 111-1 113.(in Chinese))
|
[4] |
KUSHWAHA A,SINGH S K,TEWARI S,et al. Empirical approach for designing of support system in mechanized coal pillar mining[J]. International Journal of Rock Mechanics andMining Sciences,2010,47(7):1063-1078.
|
[5] |
GHASEMI E,SHAHRIAR K. A new coal pillars design method in order to enhance safety of the retreat mining in room and pillar mines[J]. Safety Science,2012,50(3):579-585.
|
[6] |
侯朝炯,李学华.综放沿空掘巷围岩大、小结构的稳定性原理[J].煤炭学报,2001,26(1):1-7.(HOU Chaojiong,LI Xuehua,Stability Principle of Large and Small Structures of Surrounding Rock in Gob- side Entry Driving along Goaf[J]. Journal of China Coal Society,2001,26(1):1-7.(in Chinese))
|
[7] |
翟所业,吴士良. 沿空送巷的理论探讨[J]. 矿山压力与顶板管理,2003,(2):45-46.(ZHAI Shuoye,WU Shiliang. Theoretical discussion on the driving roadway along goaf[J]. Journal of Mining and Safety Engineering,2003,(2):45-46.(in Chinese))
|
[8] |
王红胜,张东升,李树刚,等. 基于基本顶关键岩块B断裂线位置的窄煤柱合理宽度的确定[J]. 采矿与安全工程学报,2014,31(1):10-16.(WANG Hongsheng,ZHANGDongsheng,LI Shugang,et al.Rational width of narrow coal pillar based on the fracture line location of key rock B in main roof[J]. Journal of Mining and Safety Engineering,2014,31(1):10-16.(in Chinese))
|
[9] |
王卫军,侯朝炯,柏建彪,等. 综放沿空巷道底板受力变形分析及底鼓力学原理[J]. 岩土力学,2001,22(3):319-322.(WANG Weijun,HOU Chaojiong,BAI Jianbiao,et al.Mechanical deformation analysis and principle of floor heav of roadway driving gob in fully mechanized sub-level caving face[J]. Rock and Soil Mechanics,2001,22(3):319-322.(in Chinese))
|
[10] |
石永奎,宋振骐,王崇革. 软煤层综放工作面沿空掘巷支护设计[J]. 岩土力学,2001,22(4):509-512.(SHI Yongkui,SONG Zhengqi,WANG Congge. The supporting design of road driving along next goaf in soft seam with fully mechanized top-caving[J]. Rock and Soil Mechanics,2001,22(4):509-512.(in Chinese))
|
[11] |
韩承强,张开智,徐小兵,等. 区段小煤柱破坏规律及合理尺寸研究[J]. 采矿与安全工程学报,2007,(3):370-373.(HAN Chengqiang,ZHANG Kaizhi,XU Xiaobing,et al.Study on failure regularity and reasonable dimension of district sublevel small coal pillar[J]. Journal of Mining and Safety Engineering,2007,(3):370-373.(in Chinese))
|
[12] |
赵国贞,马占国,孙凯,等. 小煤柱沿空掘巷围岩变形控制机理研究[J]. 采矿与安全工程学报,2010,27(4):517-521.(ZHAO Guozhen,MA Zhanguo,SUN Kai,et al.Research on deformation controlling mechanism of the narrow pillar of roadway driving along next goaf[J]. Journal of Mining and Safety Engineering,2010,27(4):517-521.(in Chinese))
|
[13] |
郑西贵,姚志刚,张农. 掘采全过程沿空掘巷小煤柱应力分布研究[J]. 采矿与安全工程学报,2012,29(4):459-465.(ZHENG Xigui,YAO Zhigang,ZHANG Nong.Stress distribution of coal pillar with gob-side entry driving in the process of excavation andmining[J]. Journal of Mining and Safety Engineering,2012,29(4):459-465.(in Chinese))
|
[14] |
李顺才,柏建彪,董正筑. 综放沿空掘巷窄煤柱受力变形与应力分析[J]. 矿山压力与顶板管理,2004,(3):17-19.(ZHAO Shuncai,BAI Jianbiao,DONG Zhengzhu.Deformation and stress analysis of narrow coal pillar in gob-side entry driving along goaf[J]. Journal of Mining and Safety Engineering,2004,(3):17-19.(in Chinese))
|
[15] |
柏建彪,王卫军,侯朝炯,等. 综放沿空掘巷围岩控制机理及支护技术研究[J]. 煤炭学报,2000,(5):478-481.(BAI Jianbiao,WANG Weijun,HOU Chaojiong,et al.Control mechanism and support technique about gateway drivenalong goaf in fully mechanized top coal caving face[J]. Journal of China Coal Society,2000,(5):478-481.(in Chinese))
|
[16] |
马其华,王宜泰. 深井沿空巷道小煤柱护巷机理及支护技术[J]. 采矿与安全工程学报,2009,26(4):520-523.(MA Qihua,WANG Yitai.Mechanism of narrow pillar protecting roadway and support technology of gob-side entry in deep mine[J]. Journal of Mining and Safety Engineering,2009,26(4):520-523.(in Chinese))
|
[17] |
刘增辉,高谦,华心祝,等. 沿空掘巷围岩控制的时效特征[J]. 采矿与安全工程学报,2009,26(4):465-469.(LIU Zenghui,GAO Qian,HUA Xinzu,et al.Aging characteristics of wall rock control in roadway driving along goaf[J]. Journal of Mining and Safety Engineering,2009,26(4):465-469.(in Chinese))
|
[18] |
杨建辉,蔡美峰. 不稳定顶板条件下煤巷锚网索梁支护实践[J]. 煤炭科学技术,2002,(8):8-11.(YANG Jianhui,CAI Meifeng.Practices on bolt mesh anchor beam support system in seamroadway under unstable roof condition[J]. Coal Science and Technology,2002,(8):8-11.(in Chinese))
|
[19] |
康红普. 深部煤巷锚杆支护技术的研究与实践[J]. 煤矿开采,2008,(1):1-5.(KANG Hongpu.Researchand practice of bolting support technology in deep coal roadways[J]. Coal Mining Technology,2008,(1):1-5.(in Chinese))
|
[20] |
杨同敏,贾双春,宇黎亮,等. 综放面沿空掘巷无煤柱开采[J]. 矿山压力与顶板管理,1998,(2):61-62.(YANG Tongmin,JIA Shuangchun,YU Liliang,et al.None coal pillar mining along gob driving roadway in fully mechanized caving face[J] Journal of Mining & Safety Engineering,1998,(2):61-62.(in Chinese))
|
[21] |
陈学伟,金泰,李峰,等. 鲍店矿综放面沿空巷道矿压控制[J]. 矿山压力与顶板管理,1997,(2):54-57.(CHENG Xuewei,JIN Tai,LI Feng,et al.Baodian coal mine fully mechanized caving face along empty roadway pressure control[J]. Journal of Mining and Safety Engineering,1997,(2):54-57.(in Chinese))
|
[22] |
YUAN Z,ZHIJUN W,FUCHEN L,et al. Stability of coal pillar in gob-side entry driving under unstable overlying strata and its coupling support control technique[J]. International Journal of Mining Science and Technology,2013,23(2):204-210.
|
[23] |
QIAN Y,JINGHONG W,DAPENG D,et al. Cable-truss supporting system for gob-side entry driving in deep mine and its application[J]. International Journal of Mining Science and Technology,2016,26(05):885-893.
|
[24] |
YANG J,CAO S,LI X. Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face[J]. International Journal of Mining Science and Technology,2013,23(2):271-276.
|
[25] |
王志强,张俊文,李良红,等. 一种超长推进距离工作面的沿空掘巷开采方法[P]. 中国国家知识产权局,2015:CN201510463081.3. (WANG Zhiqiang,ZHANG Junwen,LI Lianghong,et al. An approach to roadway digging along a long advance distance working face[P]. China State Intellectual Property Office,2015:CN201510463081.3. (in Chinese))
|
[26] |
李迎富. 二次沿空留巷围岩稳定性控制机理研究[博士学位论文][D].合肥;安徽理工大学,2012.(LI Yingfu. Research on controlling mechanism of surroundingrock stability of the secondary gob-side entry retaining[Ph. D. Thesis][D].Hefei:Anhui University of Science and Technology,2012.(in Chinese))
|
[27] |
张农,张志义,吴海,等. 深井沿空留巷扩刷修复技术及应用[J]. 岩石力学与工程学报,2014,33(3):468-474.(ZHANG Nong,ZHANG Zhiyi,WU Hai,et al.Technology and application of reparation in deep gob-side entry retaining[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):468-474.(in Chinese))
|