| [1] |
MARSTON A. The theory of external loads on closed conduits in the lightof the latest experiments[C]// Proceedings of Highway Research Board. Washington D. C.:[s.n.],1930:138-170.
|
| [2] |
LARSENN G,HENDRICKSONJ G. A practical method for constructing rigid conduits under high fills[C]//Proceedings of the 41st Annual Meeting of the Highway Research Board. Washington D. C.:[s.n.],1962:273-280.
|
| [3] |
TAYLOR R K,SPANGLER M G. Induced-trench method of culvert installation[C]// Proceedings of52nd Annual Meeting of the Highway Research Board. [S.l.]:[s.n.],1973:41-55.
|
| [4] |
SLADEN J A,OSWELL J M. The induced trench method-a criticalreview and case history[J]. Canadian Geotechnical Journal,1988,25(3):541-549.
|
| [5] |
白 冰. 高填土下刚性结构物竖向土压力卸载方法[J]. 岩土力学,1997,18(1):35-39.(BAIBing.The measure for reducing the vertical earth pressure on the buried rigid structure[J].Rock and Soil Mechanics,1997,18(1):35-39.(in Chinese))
|
| [6] |
顾安全.上埋式管道及洞室垂直土压力的研究[J].岩土工程学报,1981,3(1):3-15.(GUAnquan.Investigationofthevertical earthpressureonprojectingconduitandundergroundchamberunderahighembankment[J].Chinese Journal of Geotechnical Engineering,1981,3(1):3-15.(in Chinese))
|
| [7] |
顾安全,郭婷婷,王兴平. 高填土涵洞(管)采用EPS板卸载的试验研究[J]. 岩土工程学报,2005,27(5):500-504.(GUAnquan,GUOTingting,WANGXingping. Experimental study on reducing-load measurement using EPS of culvertunder high-stacked soil[J]. Chinese Journal of Geotechnical Engineering,2005,27(5):500-504.(in Chinese))
|
| [8] |
顾安全,金 滨,冯瑞玲. 减载措施在高填土涵洞中的应用研究[C]//中国岩石力学与工程学会第七次学术大会论文集. [S.l.]:[s.n.],2002:503-506. (GU Anquan,JINBin,FENGRuiling. The study of the usage for the reducing-load measurement of the culvert under the high-stacked soil[C]// Procedingsofthe7thConferenceof ChineseSocietyforRockMechanicsandEngineering . [S.l.]:[s.n.],2002:503-506.(in Chinese))
|
| [9] |
顾安全,吕镇锋,姜峰林,等. 高填土盖板涵EPS板卸载试验及设计方法[J]. 岩土工程学报,2009,31(10):1 481-1 486.(GUAnquan,LU Zhenfeng,JIANG Fenglin,et al. Load reduction tests anddesign methods for culverts with high fillsoil using EPS slabs[J]. Chinese Journal of Geotechnical Engineering,2009,31(10):1 481-1 486.(in Chinese))
|
| [10] |
WARITH M A,SUDHAKAR M.Predicting the compressibility behavior of tire sherd samples for landfill applications[J].Waste Management,2006,26(3):268-276.
|
| [11] |
张豫川,杜伟飞. 盖板涵洞采用废轮胎条轻质土减荷试验[J]. 沈阳建筑大学学报:自然科学版,2012,28(1):104-109.(ZHANGYuchuan,DU Weifei.Research on the role of reinforced soil with tires to reduce the vertical earth pressure above the roof-culvert[J].Journal of Shenyang Jianzhu University:Natural Science,2012,28(1):104-109.(in Chinese))
|
| [12] |
姜峰林.高填方涵洞EPS板减荷技术应用及数值模拟研究[博士学位论文][D]. 西安:长安大学,2010.(JIANG Fenglin. EPS load reduction technology application and numerical simulation for high fill culvert[Ph. D. Thesis][D]. Xi¢an:Chang¢an University,2010.(in Chinese))
|
| [13] |
李 盛,马 莉,王起才,等. 高填黄土明洞卸载结构土压力模型试验和数值模拟分析[J].岩土工程学报,2016(待刊).(LI Sheng,MA Li,WANG Qicai,et al. Model test and numerical simulation analysis of earth pressure for high fill open cut tunnel unloading structure[J].Chinese Journal of Geotechnical Engineering,2016(to be Pressed).(in Chinese))
|
| [14] |
白 冰,陆士强. 聚苯乙烯泡沫塑料的测试及其在土工中的应用[J].岩工程学报,1993,15(2):104-108.(BAI Bing,LU Shiqiang. Testingof polystyrene foamed plastics and its application in geotechnical engineering[J].Chinese Journal of Geotechnical Engineering,1993,15(2):104-108.(in Chinese))
|
| [15] |
王俊伟. EPS材料用于高填方涵洞减荷的工程性质研究[硕士学位论文][D].西安:长安大学,2009.(WANG Junwei.EPSengineering properties for culvert load reduction under high fill embankment[M. S. Thesis][D]. Xi¢an:Chang¢an University,2009.(in Chinese))
|
| [16] |
刘静.高填路堤涵洞土压力理论及减荷技术研究[博士学位论文][D]. 西安:长安大学,2004.(LIU Jing.StudyontheearthPressureactingontheculvertunder the embankment of high-staked soil and the loadreducingtechnique[Ph. D. Thesis][D]. Xi¢an:Chang¢an University,2004.(in Chinese))
|