[1] 谷兆祺,彭守拙,李仲奎. 地下洞室工程[M]. 北京:清华大学出版社,1994:87–95.(GU Zhaoqi,PENG Shouzhuo,LI Zhongkui. Underground cavern engineering[M]. Beijing:Tsinghua University Press,1994:87–95.(in Chinese))
[2] 杨 静,何江达,王开云. 水电站地下厂房岩锚吊车梁三维非线性有限元分析[J]. 四川大学学报:工程科学版,2003,35(2):31–34.(YANG Jing,HE Jiangda,WANG Kaiyun. Three-dimensional nonlinear analysis on rock-anchored beam of underground house of hydro-power station[J]. Journal of Sichuan University:Engineering Science,2003,35(2):31–34.(in Chinese))
[3] 陆晓敏,刘春霞. 地下厂房岩壁吊车梁的力学分析及设计[J]. 河海大学学报:自然科学版,2007,35(1):30–34.( LU Xiaomin,LIU Chunxia. Mechanical analysis and design of crane beam on rock wall for underground power house[J]. Journal of Hohai University:Natural Science,2007:35(1):30–34.(in Chinese))
[4] 杨春鸣,郑旭荣,王旭芳. 地下厂房岩锚吊车梁结构稳定计算的研究现状[J]. 水资源与水工程学报,2008,19(4):65–68.(YANG Chunming,ZHENG Xurong,WANG Xufang. Current situation research on calculation of structural stability for the rock-bolted crane girder in the underground house[J]. Journal of Water Resources and Water Engineering,2008,19(4):65–68.(in Chinese))
[5] 朱伯芳. 有限单元法原理与应用[M]. 北京:中国水利水电出版社,1998:293–296.(ZHU Baifang. Finite element principle and application[M]. Beijing:China Water Power Press,1998:293–296. (in Chinese))
[6] 肖 明,陈俊涛,袁金亮. 复杂地质条件下岩锚吊车梁结构三维数值分析[J]. 岩石力学与工程学报,2003,22(1):2 294–2 298.(XIAO Ming,CHEN Juntao,YUAN Jinliang. Three-dimensional numerical analysis of crane beam with rock bolt under complex geological condition[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(1):2 294–2 298.(in Chinese))
[7] 徐 彬,李 宁. 水电站地下厂房岩锚吊车梁稳定性分析剖析[J]. 水力发电学报,2007,26(2):47–53.(XU Bin,LI Ning. Analysis of rock-bolt crane girder in underground powerhouse[J]. Journal of Hydroelectric Engineering,2007,26(2):47–53.(in Chinese))
[8] 冀健红,肖 明. 岩锚吊车梁结构稳定的数值计算分析[J]. 长江科学院院报,2007,24(4):67–71.(JI Jianhong,XIAO Ming. Numerical analysis on stability of rock-anchored crane beam[J]. Journal of Yangtze River Scientific Research Institute,2007,24(4):67–71.(in Chinese))
[9] 刘进宝,刘迎曦,李守巨. 岩锚吊车梁轮压效应的三维有限元数值分析[J]. 水利水电技术,2004,35(9):54–58.(LIU Jinbao,LIU Yingxi,LI Shouju. Three-dimensional finite element numerical analysis of the effect caused by wheel loading of rock bolt crane girder[J]. Water Resources and Hydropower Engineering,2004,35(9):54–58.(in Chinese))
[10] 马震岳,凌 影,金长宇,等. 某水电站地下厂房岩锚吊车梁三期浇筑可行性分析[J]. 水电能源科学,2010,28(3):66–69.(MA Zhenyue,LING Ying,JIN Changyu,et al. Third phase pouring feasibility analysis of crane beam on rock anchor for underground powerhouse of hydropower station[J]. Water Resource and Power,2010,28(3):66–69.(in Chinese))
[11] 邱祥波,李术才,李树忱. 三维地应力回归分析方法与工程应用[J]. 岩石力学与工程学报,2003,22(10):1 613–1 617.(QIU Xiangbo,LI Shucai,LI Shuchen. 3D geostress regression analysis method and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1 613–1 617.(in Chinese))
[12] 张建海,何江达. 小湾高拱坝三维有限元弹塑性分析[J]. 云南水力发电,2000,16(1):61–64.(ZHANG Jianhai,HE Jiangda. 3D elastoplastic analysis of Xiaowan arch dam[J]. Yunnan Water Power,2000,16(1):61–64.(in Chinese))
[13] 张学言,闫澍旺. 岩土塑性力学基础[M]. 天津:天津大学出版社,2006:59–60.(ZHANG Xueyan,YAN Shuwang. Geotechnical plastic mechanics[M]. Tianjin:Tianjin University Press,2006:59–60.(in Chinese))
[14] 胡著秀,张建海,周 钟,等. 锦屏一级高拱坝坝基加固效果分析[J]. 岩土力学,2010,31(9):2 861–2 868.(HU Zhuxiu,ZHANG Jianhai,ZHOU Zhong,et al. Analysis of stress and deformation of Jinping I high arch dam after foundation reinforcement[J]. Rock and Soil Mechanics,2010,31(9):2 861–2 868.(in Chinese))
[15] 李广信. 高等土力学[M]. 北京:清华大学出版社,2004:159–160. (LI Guangxin. Advanced soil mechanics[M]. Beijing:Tsinghua University Press,2004:159–160.(in Chinese))