| SHIELDS LOWERING-DOWN TECHNIQUE IN CONTRACT C822 OF SEABOARD LINE IN SINGAPORE METRO |
| Du Feng |
| (Shanghai Tunnel Engineering Construction Co.,Ltd., Shanghai 200032 China) |
|
|
|
|
Abstract With the background of contract C822 of seaboard line of Singapore metro,this article proposes a shields lowering-down scheme applicable to actual situation of work shaft and its special ambience. The method and procedures of lifting are described in details.
|
|
|
|
|
|
|