| CONSTRUCTION of ROUND DIAPHRAGM WALL Of DAKANGPU STATION AT CROSSING OF RED AND ORANGE LINEs OF KAOHSIUNG MASS RAPID TRANSIT |
| Wang Gwanshyong,Hung Chengfeng |
| (Deparment of Kaohsiung Mass Rapid Transit of Kaohsiung Municipal Government, Kaohsiung) |
|
|
|
|
Abstract Since the Dakangpu Station is one of the key points for KMRT Project at aspects of control of traffic flow,construction period,construction conditions and safety,Electro-Mill-VisionX is adopted in the construction of round diaphragm wall to maintain the quality,speed and accuracy on digging. The determination of the excavation sequence of the station is an important issue to designers and constructors for preventing damage caused by the effect of uneven side pressure of round diaphragm wall.
|
|
|
|
|
|
|
1 石正義. 連續壁工程施工與管理實務[M]. [s. l.]:[s. n.]:1987
|
| [1] |
CHEN Weizhong1*, LIU Xinyu1, 2, YANG Jianping1, WANG Wei1, 2, ZANG Zhonghai3, DING Hongyuan3, ZHANG Zheyuan3, WANG Xiaogang3, SHI Zhengrong1. Development of a large-scale 3D physical model test system for underground energy storage caverns and its model experimental study[J]. , 2026, 45(6): 1615-1628. |
|
|
|
|