| CONSTRUCTION OF TUNNELS OF TAIWAN HIGH SPEED RAIL |
| Yeh Hsangyang1,Lo Wenhsien2 |
| (1T200 Site Office,Taiwan High Speed Rail Corporation, Taipei) (2C210 Site Office,Taiwan High Speed Rail Corporation, Taipei) |
|
|
|
|
Abstract Of the total length of 345 km of Taiwan High Speed Rail Project,330 km are contracted by Taiwan High Speed Rail Corporation. Of it,13% in length,approximately 44 km,is tunnels. It consists of 5 open-cut tunnels and 42 bored tunnels. Of them,4 are longer than 3 km and 6 are longer than 1 km. Design concept and the construction status of these tunnels are described
|
|
|
|
|
|
1 葉向陽,羅文賢,謝倩芬. 高鐵橋樑及隧道施工簡介[A]. 见:台灣軌道工程協會年會研討會论文集[C]. [s. l.]:[s. n.],2002,125~129
2 羅文賢. 學習之旅——林口隧道施工介紹[J]. 台灣高鐵,2003,(14):95~99
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|