| Study On CROSS-RIVER SECTION of XINGcHUNG LINE OF TRTS |
| Chung Peiyi1,Hsueh Yuehchin 2 |
| (1Department of Rapid Transit System,Taipei City Government, Taipei) (2NDPO,Department of Rapid Transit System,Taipei City Government, Taipei) |
|
|
|
|
Abstract The CK570C section of Xingchung line is the most difficult construction project in the history of Taipei metropolis rapid transit system. This project goes from O8 station to O5 station. The total length of is 3.2 km and this section includes 3 stations. Of them,Taipei Bridge station (O7 station) is a side platform station and Cailiao station (O6 station) and Sanchong station (O5 station) are economic-style stations. In addition,there are two open-cut tunnels for rail section and cross-over section respectively,and four shield tunnels in the CK570C section. In this section,there are two difficult construction areas:one is cross-over structure for track turnout under the deep zone of Danshui River,and the other is Taipei Bridge station. From the consideration of construction,cofferdams are need before the construction of diaphragm wall. But the protection of river must be enhanced because the cofferdam may cause scouring to the bank and river bed.
|
|
|
|
|
|
|
1 中興工程顧問有限公司. 中興工程顧問有限公司成果設計簡報資料[R]. 台北:中興工程顧問有限公司,1999
2 水資源局. 淡水河水工模型整建及台北防洪計畫績效驗証試驗報告[R]. 台北:水資源局,1996
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|