Citation Search Quick Search
  2026, Vol. 45 Issue (3): 764-776    DOI: 10.3724/1000-6915.jrme.2025.0714
Artiles Current Issue | Archive | Adv Search |
Roof-blasting control technology for rockburst prevention in the final mining stage with composite hard roof
DONG Xukai1, BAI Junjie2, ZHANG Junwen3*, LIU Jinhai1, ZHAO Shankun4, XU Meng5
(1. School of Resources and Safety Engineering, University of Science and Technology Beijing, Beijing 100083, China; 2. Shaanxi Yanchang Petroleum Balasu Coal Industry Co., Ltd., Yulin, Shaanxi 719000, China; 3. School of Energy and Mining, China University of Mining and Technology(Beijing), Beijing 100083, China; 4. China Coal Research Institute,
Beijing 100013, China; 5. China Coal Tianjin Design Engineering Co., Ltd., Tianjin 300120, China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号