[3] |
刘泉声,黄 兴,时 凯,等.超千米深部全断面岩石掘进机卡机机理[J]. 煤炭学报,2013,38(1):78–84.(LIU Quansheng,HUANG Xing,SHI Kai,et al. Jamming mechanism of full face tunnel boring machine in over thousand meter depths[J]. Journal of China Coal Society,2013,38(1):78–84.(in Chinese))
|
[5] |
刘泉声,黄 兴,时 凯,等. 煤矿超千米深部全断面岩石巷道掘进机的提出及关键岩石力学问题[J]. 煤炭学报,2012,37(12):2 006–2 013.(LIU Quansheng,HUANG Xing,SHI Kai,et al. Utilization of full face roadway boring machine in coal mines deeper than 1000m and the key rock mechanics problems[J]. Journal of China Coal Society,2012,37(12):2 006–2 013.(in Chinese))
|
[7] |
尚彦军,史永跃,曾庆利,等. 昆明上公山隧道复杂地质条件下TBM卡机及护盾变形问题分析和对策[J]. 岩石力学与工程学报,2005,24(21):3 858–3 863.(SHANG Yanjun,SHI Yongyue,ZENG Qinli,et al. TBM jamming and deformation in complication geological conditions and engineering measures[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3 858–3 863.(in Chinese))
|
[10] |
EBRAHIM F,ALI M,CHOLAMREZA S. Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project[J]. Tunnelling and Underground Space Technology,2006,21(5):504–510.
|
[13] |
ZHAO K,JANUTOLO M,BARLA G,et al.3D simulation of TBM excavation in brittle rock associated with fault zones: The Brenner Exploratory Tunnel case[J]. Engineering Geology,2014,181:93–111.
|
[15] |
SHATERPOUR-MAMAGHANI A,TUMAC D,AVUNDUK E. Double shield TBM performance analysis in difficult ground conditions:a case study in the Gerede water tunnel,Turkey[J]. Bulletin of Engineering Geology and the Environment,2015,74(1):1–12.
|
[1] |
LIU Q,HUANG X,GONG Q,et al. Application and development of hard rock TBM and its prospect in China[J]. Tunnelling and Underground Space Technology,2016,57:33–46.
|
[11] |
黄 兴,刘泉声,彭星新,等. 引大济湟工程TBM挤压大变形卡机计算分析与综合防控[J]. 岩土力学,2017,38(10):2 962–2 972. (HUANG Xing,LIU Quansheng,PENG Xingxin,et al. Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river[J]. Chinese Journal of Rock and Soil Mechanics,2017,38(10):2 962–2 972.(in Chinese))
|
[17] |
HOEK E,MARINOS P. Predicting tunnel squeezing problems in weak heterogeneous rock masses[J]. Tunnels and Tunnelling International,2000,32(11):45–51.
|
[21] |
ZHANG J,ZHOU X. Time-dependent jamming mechanism for Single-Shield TBM tunneling in squeezing rock[J]. Tunnelling and Underground Space Technology, 2017,69:209–222.
|
[23] |
ENTACHER M,WINTER G,BUMBERGER T,et al. Cutter force measurement on tunnel boring machines System design. Tunnelling and Underground Space Technology,2012,31(5):97–106.
|
[9] |
尚彦军,王思敬,薛继洪,等. 万家寨引黄工程泥灰岩段隧洞岩石掘进机(TBM)卡机事故工程地质分析和事故处理[J]. 工程地质学报,2002,10(3):293–298.(SHANG Yanjun,WANG Sijing,XUE Jihong,et al. A case study on TBM block in marls at connection works no.7 tunnel of yellow river diversion project[J]. Journal of Engineering Geology,2002,10(3):293–298.(in Chinese))
|
[19] |
温 森,徐卫亚. 洞室变形引起的双护盾TBM施工事故风险分析[J]. 岩石力学与工程学报,2011,30(增1):3 060–3 065.(WEN Sen,XU Weiya. Risk analysis of double shield TBM construction accident induced by tunnel deformation[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):3 060–3 065.(in Chinese))
|
[4] |
黄 兴. 超千米深井岩石巷道全断面掘进机卡机机理及预测防治[博士学位论文][D]. 武汉:中国科学院武汉岩土力学研究所,2014.(HUANG Xing. Mechanism of Large squeezing deformation and shield jamming in deep soft ground tunneling by TBM[Ph. D. Thesis][D]. Wuhan:Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,2014.(in Chinese))
|
[6] |
尚彦军,杨志法,曾庆利,等. TBM施工遇险工程地质问题分析和失误的反思[J]. 岩石力学与工程学报,2007,26(12):2 404–2 411. (SHANG Yanjun,YANG Zhifa,ZENG Qingli,et al. Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2 405–2 411.(in Chinese))
|
[8] |
DALGI? S. Tunneling in squeezing rock,the Bolu tunnel,Anatolian Motorway,Turkey[J]. Engineering Geology,2002,67(1/2):73–96.
|
[14] |
房敬年,苗 栋,房后国,等. 破碎围岩中输水隧洞双护盾TBM卡机分析及其脱困措施[J]. 水电能源科学,2017,(10):171–173. (FANG Jingnian,MIAO Dong,FANG Houguo,et al. Research on double shield TBM jamming and its jamming releasing measures in water conyance tunnel with fractured surrounding rock[J]. Water Resource and Power,2017,(10):171–173.(in Chinese))
|
[16] |
AKSOY C O,OGUL K,TOPAL I,et al. Numerical modeling of non-deformable support in swelling and squeezing rock[J]. International Journal of Rock Mechanics and Mining Sciences,2012,52(1):61–70.
|
[18] |
CARRANZA-TORRES C,FAIRHURST C. Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Ηoek-Βrown failure criterion[J]. Tunnelling and Underground Space Technology,2000,15(2):187–213.
|
[2] |
陈卫忠,肖正龙,田洪铭. 深埋高地应力TBM隧道挤压大变形及其控制技术研究[J]. 岩石力学与工程学报,2015,34(11):2 215–2 226.(CHEN Weizhong,XIAO Zhenglon,TIAN Hongming. Research on squeezing large displacement and its disposing method of weak rock tunnel under high in-situ stress[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(11):2 215–2 226.(in Chinese))
|
[12] |
刘志华,李清文,边 野,等. 引洮供水工程双护盾TBM卡机事故分析与解决[J]. 建筑机械,2013,(6):77–79.(LIU Zhihua,LI Qingwen,BIAN Ye,et al. Analysis and solutions for the blocking failure of double shield TBM in Yintao water supply project[J]. Construction Machinery,2013,(6):77–79.(in Chinese))
|
[22] |
HASANPOUR R,ROSTAMI J,üNVER B. 3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds[J]. Tunnelling and Underground Space Technology,2014,40(2):109–126.
|
[20] |
温 森,杨圣奇,董正方,等. 深埋隧道TBM卡机机理及控制措施研究,岩土工程学报,2015,37(7):1 271–1 277.(WEN Sen,YANG Shengqi,DONG Zhengfang,et al. TBM jamming mechanism and control measures in deep buried tunnels[J]. Chinese Journal of Geotechnical Engineering,2015,37(7):1 271–1 277.(in Chinese))
|