[3] |
李 淑,张顶立,房 倩,等. 北京地铁车站深基坑地表变形特性研究[J]. 岩石力学与工程学报,2012,31(1):189–198.(LI Shu,ZHANG Dingli,FANG Qian,et al. Research on characteristics of ground surface deformation during deep excavation in Beijing subway[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):189–198.(in Chinese))
|
[5] |
王 芳,贺少辉,刘 军,等. 盾构隧道结合洞桩法修建地铁车站地表沉降控制标准分析[J]. 岩土力学,2012,33(增2):289–296. (WANG Fang,HE Shaohui,LIU Jun,et al. Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method[J]. Rock and Soil Mechanics,2012,33(Supp.2):289–296.(in Chinese))
|
[7] |
李 宁,顾强康,朱才辉,等. 西安地铁二号线下穿古城墙段地表沉降控制标准研究[J]. 岩石力学与工程学报,2009,28(增2): 3 753–3 761.(LI Ning,GU Qiangkang,ZHU Caihui,et al. Research on ground sedimentation criterion of xi?an line–2 subway under circumvallation[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.2):3 753–3 761.(in Chinese))
|
[9] |
贾瑞华,阳军生,马 涛,等. 既有管线下盾构施工地层沉降监测和位移加载数值分析[J]. 岩土工程学报,2009,31(3):425–430.(JIA Ruihua,YANG Junsheng,MA Tao,et al. Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method[J]. Chinese Journal of Geotechnical Engineering,2009,31(3):425–430.(in Chinese))
|
[13] |
中华人民共和国国家标准编写组. GB 50652—2011 城市轨道交通地下工程建设风险管理规范[S]. 北京:中国建筑工业出版社,2011.(The National Standards Compilation Group of People?s Republic of China. GB 50652—2011 Code for risk management of underground works in urban rail transit[S]. Beijing:China Architecture and Building Press,2011.(in Chinese))
|
[1] |
张顶立. 城市地下工程建设安全风险及其控制[M]. 北京:化学工业出版社,2012:108–116.(ZHANG Dingli. Safety risks and corresponding control measures of urban underground engineering construction[M]. Beijing:Chemical Industry Press,2012:108–116.(in Chinese))
|
[11] |
刘凤洲,谢雄耀. 地铁基坑围护结构成槽施工对邻近建筑物沉降影响及监测数据分析[J]. 岩石力学与工程学报,2014,33(增1): 2 901–2 907.(LIU Fengzhou,XIE Xiongyao. Effect of trench construction of retaining structure in metro foundation pit on adjacent building settlement and monitoring data analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):2 901– 2 907.(in Chinese))
|
[8] |
苏 洁,张顶立,周正宇,等. 地铁隧道穿越既有桥梁安全风险评估及控制[J]. 岩石力学与工程学报,2015,34(增1):3 188–3 195. (SU Jie,ZHANG Dingli,ZHOU Zhengyu,et al. Safety risk assessment and control of existing bridge crossed by tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1): 3 188–3 195.(in Chinese))
|
[10] |
SUN Y,XU Y S,SHEN S L,et al. Field performance of underground structures during shield tunnel construction[J]. Tunnelling and Underground Space Technology,2012,28(3):272–277.
|
[15] |
杨跃进,商广娟,郭 锐. 统计过程控制技术[M]. 北京:航空工业出版社,2003:1–12.(YANG Yuejin,SHANG Guangjuna,Guo Rui. Technology of statistical process control[M]. Beijing:Aeronautical Industry Press,2003:1–12.(in Chinese))
|
[18] |
中华人民共和国行业标准编写组. TB10621—2014 高速铁路设计规范[S]. 北京:国家铁路局,2014.(The Professional Standards Compilation Group of People?s Republic of China. TB10621—2014 Code for design of high speed railway[S]. Beijing:National Railway Administration of People?s Republic of China,2014.(in Chinese))
|
[2] |
姚宣德,王梦恕. 地铁浅埋暗挖法施工引起的地表沉降控制标准的统计分析[J]. 岩石力学与工程学报,2006,25(10):2 030–2 035. (YAO Xuande,WANG Mengshu. Statistic analysis of guideposts for ground settlement induced by shallow tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(10):2 030–2 035.(in Chinese))
|
[4] |
齐震明,李鹏飞. 地铁区间浅埋暗挖隧道地表沉降的控制标准[J].北京交通大学学报,2010,34(3):117–121.(QI Zhenming,LI Pengfei. Control standard of ground surface settlements in metro section shallow tunnel[J]. Journal of Beijing Jiaotong University,2010,34(3):117–121.(in Chinese))
|
[6] |
XIE X Y,YANG Y B,JI M. Analysis of ground surface settlement induced by the construction of a large-diameter shield- driven tunnel in Shanghai,China[J]. Tunnelling and Underground Space Technology,2016,51:120–123.
|
[12] |
张光权,杜子建,宋锦泉,等. 地铁车站拱盖法施工沉降监测分析及控制对策[J]. 岩石力学与工程学报,2012,31(增1):3 413–3 420. (ZHANG Guangquan,DU Zijian,SONG Jinquan,et al. Monitoring and analysis of excavation-induced subsidence of subway station constructed by arch cover method and control measures[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.1): 3 413–3 420.(in Chinese))
|
[14] |
苗 瑞,蒋祖华,崔利荣. 工程统计学[M]. 北京:机械工业出版社,2010:110–111.(MIAO Rui,JIANG Zuhua,CUI Lirong. Engineering statistics[M]. Beijing:China Machine Press,2010:110–111.(in Chinese))
|
[16] |
蒋家东,冯允成. 统计过程控制[M]. 北京:中国质检出版社,2011:89–188,359–361.(JIANG Jiadong,FENG Yuncheng. Statistical process control[M]. Beijing:China Zhijian Publishing House,2011:89–188,359–361.(in Chinese))
|
[17] |
中华人民共和国行业标准编写组. DB11/490—2007 地铁工程监控量测技术规程[S]. 北京:北京市建设委员会,2007.(The Professional Standards Compilation Group of People?s Republic of China. DB11/490—2007 Technical code for monitoring measurement of subway engineering[S]. Beijing:Beijing Municipal Commission of Housing and Urban-rural Development,2007.(in Chinese))
|