Abstract:The monitoring and theoretical studies for deep excavation are lack in Beijing. The monitoring results of deep excavation of China World Trade Center Tower phase 3 in Beijing during excavation process are analyzed. The study results show that:(1) Under normal circumstances,the displacement of pile-anchor bracing system is generally not more than 0.1%H,where H is the depth of foundation pit. (2) The stress of reinforcement in pile is usually only 1/10–1/8 of design strength. (3) The actual tension of anchor is smaller than the design value,which shows that the adopted earth pressure in the design of support system is larger than the actual earth pressure. (4) The tensions of each row soil nailings are all less than 38 kN,which is far less than the design value calculated by current regulations. It is found that the actual steel stress,anchor tension and soil-nailling tension are all less than the current theoretical values. The monitoring results can provide a reference to the similar projects and the basis for amendments to the subsequent procedures.
张钦喜,陈 鹏,尹文彪. 国贸中心三期基坑支护工程监测研究[J]. 岩石力学与工程学报, 2012, 31(11): 2319-2326.
ZHANG Qinxi,CHEN Peng,YIN Wenbiao. MONITORING AND STUDY FOR SUPPORT ENGINEERING OF DEEP EXCAVATION OF CHINA WORLD TRADE CENTER TOWER PHASE 3. , 2012, 31(11): 2319-2326.
[1] 张钦喜,佟德凯,熊宗喜,等. 亚奥广场护坡桩内力及锚杆拉力测试与分析[J]. 北京工业大学学报,2006,32(增2):110–114.(ZHANG Qinxi,TONG Dekai,XIONG Zongxi,et al. Measurement and analysis of the stress in retaining pile and the force of anchor at a deep excavation of Yaao Building[J]. Journal of Beijing University of Technology,2006,32(Supp.2):110–114.(in Chinese))
[2] 陆培毅,顾晓鲁,钱 征. 天津港务局综合业务深基坑支护与监测[J]. 岩土工程学报,1999,21(3):323–327.(LU Peiyi,GU Xiaolu,QIAN Zheng. Design and monitoring of deep foundation pit in Tianjin port office multiple building[J]. Chinese Journal of Geotechnical Engineering,1999,21(3):323–327.(in Chinese))
[3] 郝文朝,高华东. 北京城铁东直门车站土压力现场监测[J]. 建筑技术,2003,34(2):113–114.(HAO Wenchao,GAO Huadong. In-situ measurements of earth pressure on retaining structure at Dongzhimen Subway Station in Beijing[J]. Construction Technology,2003,34(2):l13–114.(in Chinese))
[4] 张明聚,郭忠贤. 土钉支护工作性能的现场测试研究[J]. 岩土工程学报,2001,23(3):319–323.(ZHANG Mingju,GUO Zhongxian. In-situ measurement and test study on the working behavior of soil-nailing wall[J]. Chinese Journal of Geotechnical Engineering,2001,23(3):319–323.(in Chinese))
[5] 杨耀辉,马 昕,周予启. 中国石油大厦复合土钉支护现场监测与分析[J]. 岩土工程技术,2006,20(1):9–12.(YANG Yaohui,MA Xin,ZHOU Yuqi. Field measurements and theoretical analysis of internal force of composite soil-nailing at Zhongshiyou foundation pit[J]. Geotechnical Engineering Technique,2006,20(1):9–12.(in Chinese))
[6] 张钦喜,何建勇,霍 达. 土钉内力计算方法探讨及实例分析[J]. 北京工业大学学报,2002,28(4):448–451.(ZHANG Qinxi,HE Jianyong,HUO Da. Calculation of the interior force of soil nails and case analysis[J]. Journal of Beijing University of Technology,2002,28(4):448–451.(in Chinese))
[7] 余志成,施文华. 深基坑支护设计与施工[M]. 北京:中国建筑工业出版社,1997:112–116.(YU Zhicheng,SHI Wenhua. Support desigh and construction of deep excavation[M]. Beijing:China Architecture and Building Press,1997:112–116.(in Chinese))
[8] 容 涛,张 川,刘红岩. 深基坑桩锚支护的数值模拟[J]. 科技情报开发与经济,2007,17(17):166–168.(RONG Tao,ZHANG Chuan,LIU Hongyan. The numerical simulation of piled-anchor support in deep foundation pit[J]. Sci-Tech Information Development and Economy,2007,17(17):166–168.(in Chinese))
[9] 中华人民共和国行业标准编写组. JGJ120—99 建筑基坑支护技术规程[S]. 北京:中国建筑工业出版社,1999.(The Professional Standards Compilation Group of People′s Republic of China. JGJ120—99 Technical specification for retaining and protection of building foundation excavations[S]. Beijing:China Architecture and Building Press,1999.(in Chinese))
[10] 高华东,霍 达,陶连金. 深基坑开挖FLAC数值模拟计算及分析[J]. 河南科学,2005,23(6):859–862.(GAO Huadong,HUO Da,TAO Lianjin. Numerical calculation and analysis in deep excavation with FLAC[J]. Henan Science,2005,23(6):859–862.(in Chinese))