Abstract:In order to clarify the law of lateral deformation due to deep excavation in Beijing,a database of 37 case histories of field monitoring in Beijing is analyzed and the results are compared with worldwide case histories. Research shows that:(1) The maximum lateral deformation of wall mainly ranges from 5 to 25 mm,with percentage of 79.2%;and only 13.5% of that are larger than 30 mm. (2) The general profiles of lateral deformation of bored pile wall are “convex shape”. The distance of position of maximum lateral displacement is from 9 to 13 m below top of wall,and ranges from 0.58H+5 m to 0.58H-5 m. (3) The profiles of lateral deformation of compound soil nail wall are “triangle shape”,with the maximum value at the top of wall and decreasing gradually down. (4) The maximum lateral deformations of all excavations,which range from 0.04%H to 0.218%H,with a mean value of about 0.103%H,increase with the increase of H and length-width ratio. (5) The maximum lateral deformation decreases with the increase of insertion ratio and system stiffness,but it has little effect when insertion ratio is more than 0.6. The results can be used to predict lateral deformation of similar projects in Beijing and other areas,and guide design and constructions;and it also has great significance to preventing the foundation pit accident and avoiding the waste of resources.
李 淑,张顶立,房 倩,李志佳. 北京地区深基坑墙体变形特性研究[J]. 岩石力学与工程学报, 2012, 31(11): 2344-2353.
LI Shu,ZHANG Dingli,FANG Qian,LI Zhijia. RESEARCH ON CHARACTERISTICS OF RETAINING WALL DEFORMATION DUE TO DEEP EXCAVATION IN BEIJING. , 2012, 31(11): 2344-2353.
[1] PECK R B. Deep excavation and tunneling in soft ground[C]// Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico:State-of-the-Art-Volume,1969:225–290.
[2] CLOUGH G W,O?ROURKE T D. Construction induced movements of in situ walls[C]// ASCE Conference on Design and Performance of Earth Retaining Structures Special Publication No.25. New York:ASCE,1990:439–470
[3] CARDER D R. Ground movements caused by different embedded retaining wall construction techniques[R]. [S.1.]:[s.n.],1995.
[4] LONG M. Database for retaining wall and ground movements due to deep excavations[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2001,127(3):203–224.
[5] MOORMANN C. Analysis of wall and ground movements due to deep excavations in soft soil based on a new worldwide database[J]. Journal of the Japanese Geotechnical Society of Soils and Foundations,2004,44(1):87–98.
[6] OU C Y,HSIEH P G,CHIOU D C. Characteristics of ground surface settlement during excavation[J]. Canadian Geotechnical Journal,1993,30(5):758–767.
[7] WONG I H L,POH T Y,CHUAH H. Performance of excavations for depressed expressway in Singapore[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,1997,123(7):617–625.
[8] LEUNG E H Y,NG C W W. Wall and ground movements associated with deep excavations supported by cast in situ wall in mixed ground conditions[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2007,133(2):129–143.
[9] 徐中华,王建华,王卫东. 上海地区深基坑工程地下连续墙的变形性状[J]. 土木工程学报,2008,41(8):81–86.(XU Zhonghua,WANG Jianhua,WANG Weidong. Deformation behavior of diaphragm walls in deep excavations in Shanghai[J]. China Civil Engineering Journal,2008,41(8):81–86.(in Chinese))
[10] 李 波. 桩锚支护体系在北京一地铁车站深基坑中的应用[J]. 市政技术,2008,26(4):348–350.(LI Bo. Application of supporting system with anchor pile for deep foundation pit of a subway station in Beijing[J]. Municipal Engineering Technology,2008,26(4):348–350.(in Chinese))
[11] 高华东,霍 达,陶连金. 北京光彩大厦深基坑开挖现场监测与理论分析[J]. 地下空间与工程学报,2005,1(3):423–427.(GAO Huadong,HUO Da,TAO Lianjin. Field measurements and theoretical analysis in deep excavation around Beijing brilliance edifice[J]. Chinese Journal of Underground Space and Engineering,2005,1(3):423–427.(in Chinese))
[12] 刘兴旺,周葛源. 北京朝阳广场深基坑支护技术[J]. 探矿工程:岩土钻掘工程,2006,(10):8–13.(LIU Xingwang,ZHOU Geyuan. Bracing of deep foundation pit applied in Chaoyang square construction project[J]. Exploration Engineering:Rock and Soil Drilling and Tunneling,2006,(10):8–13.(in Chinese))
[13] 白韶红. 北京银泰中心工程基坑的变形监测[J]. 岩土工程界,2004,7(9):79–80.(BAI Shaohong. The deformation monitoring of deep excavation of Beijing Yintai center[J]. Geotechnical Engineering World,2004,7(9):79–80.(in Chinese))
[14] 常 江,张 君. 北京地铁义和庄站基坑支护结构及变形监测[J]. 中国安全生产科学技术,2009,5(3):149–153.(CHANG Jiang,ZHANG Jun. Support structure and deformation monitoring of excavation pit in Yihezhuang station of Beijing subway[J]. Journal of Safety Science and Technology,2009,5(3):149–153.(in Chinese))
[15] 李运涛,丁前进. 地铁深基坑开挖与支承轴力、围护结构变形监测分析[J]. 铁道建筑技术,2011,(1):102–104.(LI Yuntao,DING Qianjin. The monitoring and analysis of the subway deep excavation,the bearing axial forces and retaining structure deformation[J]. Railway Construction Technology,2011,(1):102–104.(in Chinese))
[16] 张润钊. 明挖地铁车站施工中基坑变形及控制[J]. 市政技术,2010,28(6):82–85.(ZHANG Runzhao. Deformation and its control of foundation pit in a subway station construction by open cut method[J]. Municipal Engineering Technology,2010,28(6):82–85.(in Chinese))
[17] 张淑娟,李洪厂. 北京老城区深基坑支护设计与施工[J]. 岩土工程界,2008,11(6):71–75.(ZHANG Shujuan,LI Hongchang. The design and construction of deep foundation pit in Beijing[J]. Geotechnical Engineering World,2008,11(6):71–75.(in Chinese))
[18] 唐红霞. 国美商都复合土钉支护现场测试与数值分析[硕士学位论文][D]. 北京:中国地质大学,2007.(TANG Hongxia. Field testing and numerical analysis of the composite soil-nailing at Gome Shoppingcity foundation pit[M. S. Thesis][D]. Beijing:China University of Geosciences,2007.(in Chinese))
[19] 马志玲. 土钉支护水平位移的规律分析及预测[硕士学位论文][D]. 北京:中国地质大学,2007.(MA Zhiling. Analysis and forecast for the rule of horizontal displacement in soil nailing supporting[M. S. Thesis][D]. Beijing:China University of Geosciences,2007.(in Chinese))
[20] 杨 栋. 北京财富田嘉茄园基坑支护工程实例分析[J]. 岩土工程界,2004,7(9):58–60.(YANG Dong. Analysis of Beijing Wealth Tianjiaqie Garden foundation pit[J]. Geotechnical Engineering World,2004,7(9):58–60.(in Chinese))
[21] 段启伟. 土钉支护现场实测与数值模拟[硕士学位论文][D]. 北京:北京交通大学,2006.(DUAN Qiwei. Field testing and numerical analysis of composite soil-nailing foundation pit[M. S. Thesis][D]. Beijing:Beijing Jiaotong University,2006.(in Chinese))
[22] 曹庭校. 北京地铁十号线某深基坑复合土钉支护与机制研究[博士学位论文][D]. 北京:中国地质大学,2008.(CAO Tingxiao. Mechanics analysis of composite soil nailing of a deep foundation pit on Beijing metra line 10[Ph. D. Thesis][D]. Beijing:China University of Geosciences,2008.(in Chinese))
[23] 刘建航,侯学渊. 基坑工程手册[M]. 北京:中国建筑工业出版社,2009:186.(LIU Jianhang,HOU Xueyuan. Handbook for foundation pit engineering[M]. Beijing:China Architecture and Building Press,2009:186.(in Chinese))
[24] 李 淑,张顶立,房 倩,等. 北京地铁车站深基坑地表变形特性研究[J]. 岩石力学与工程学报,2012,31(1):189–198.(LI Shu,ZHANG Dingli,FANG Qian,et al. Research on characteristics of ground surface deformation during deep excavation in Beijing subway[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):189–198.(in Chinese))
[25] 龚晓南,高有潮. 深基坑工程设计施工手册[M]. 北京:中国建筑工业出版社,1998:20.(GONG Xiaonan,GAO Youchao. Deep excavation engineering design and construction handbook[M]. Beijing:China Architecture and Building Press,1998:20.(in Chinese))
[26] SEO M W,OLSON S M. Sequential analysis of ground movements at three deep excavation sites with mixed ground profiles[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2010,136(5):656–668.
[27] FERNIE R,SUCKLING T. Simplified approach for estimating lateral movement of embedded walls in U.K. ground[C]// Proceedings of International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground. London:[s.n.],1996:131–136.
[28] YOO C. Behavior of braced and anchored walls in soils overlying rock[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2001,127(3):225–233.
[29] HASHASH Y M A,OSOULI A,MARULANDA C M. Central artery tunnel project excavation induced ground deformations[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2008,134(2):1 399–1 406.