[1] 张凤祥,朱合华,傅德明. 盾构隧道[M]. 北京:人民交通出版社,2004:1–13.(ZHANG Fengxiang,ZHU Hehua,FU Deming. Shield tunnels[M]. Beijing:China Communications Press,2004:1–13.(in Chinese))
[2] FINNO R J,CLOUGH G W. Evaluation of soil response to EPB shield tunneling[J]. Journal of Geotechnical Engineering,1985,111(2):155–173.
[3] LEE K M,ROWE R K. An analysis for three-dimensional ground movements:the Thunder Bay tunnel[J]. Canadian Geotechnical Journal,1991,28(1):25–41.
[4] 易宏伟,孙 钧. 盾构施工对软黏土的扰动机制分析[J]. 同济大学学报,2000,28(3):277–281.(YI Hongwei,SUN Jun. Mechanism analysis of disturbance caused by shield tunneling on soft clays[J]. Journal of Tongji University,2000,28(3):277–281.(in Chinese))
[5] 王敏强,陈胜宏. 盾构推进隧道结构三维非线性有限元仿真[J]. 岩石力学与工程学报,2002,21(2):228–232.(WANG Minqiang,CHEN Shenghong. 3D nonlinear finite element simulation of tunnel structure for moving-forward shield[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(2):228–232.(in Chinese))
[6] 张 云,殷宗泽,徐永福. 盾构法隧道引起的地表变形分析[J]. 岩石力学与工程学报,2002,21(3):388–392.(ZHANG Yun,YIN Zongze,XU Yongfu. Analysis of three-dimensional ground surface deformations due to shield tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(3):388–392.(in Chinese))
[7] 刘元雪,施建勇,许 江,等. 盾构法隧道施工数值模拟[J]. 岩土工程学报,2004,26(2):239–243.(LIU Yuanxue,SHI Jianyong,XU Jiang,et al. Numerical simulation of excavation of shield tunnel[J]. Chinese Journal of Geotechnical Engineering,2004,26(2):239–243.(in Chinese))
[8] 季亚平. 考虑施工过程的盾构隧道地层位移与土压力研究[硕士学位论文][D]. 南京:河海大学,2004.(JI Yaping. Study of stratum displacement and earth pressure considering construction program of shield tunnel[M. S. Thesis][D]. Nanjing:Hohai University,2004.(in Chinese))
[9] 姜忻良,崔 奕,李 园,等. 天津地铁盾构施工地层变形实测及动态模拟[J]. 岩土力学,2005,26(10):1 612–1 616.(JIANG Xinliang,CUI Yi,LI Yuan,et al. Measurement and simulation of ground settlements of Tianjin subway shield tunnel construction[J]. Rock and Soil Mechanics,2005,26(10):1 612–1 616.(in Chinese))
[10] 张志强,何 川,佘才高. 南京地铁盾构掘进施工的三维有限元仿真分析[J]. 铁道学报,2005,27(1):84–89.(ZHANG Zhiqiang,HE Chuan,SHE Caigao. Three-dimensional finite element modeling of excavation and advancement processes of shield tunnel construction in Nanjing metro[J]. Journal of the China Railway Society,2005,27(1):84–89.(in Chinese))
[11] 朱合华,丁文其,李晓军. 盾构隧道施工力学性态模拟及工程应用[J]. 土木工程学报,2000,33(3):98–103.(ZHU Hehua,DING Wenqi,LI Xiaojun. Construction simulation for the mechanical behavior of shield tunnel and its application[J]. China Civil Engineering Journal,2000,33(3):98–103.(in Chinese))
[12] 张海波. 地铁隧道盾构施工法对周围环境影响的数值模拟[博士学位论文][D]. 南京:河海大学,2005.(ZHANG Haibo. Numerical simulation of the influence of shield tunneling on surrounding environment[Ph. D. Thesis][D]. Nanjing:Hohai University,2005.(in Chinese))
[13] 王勖成. 有限单元法[M]. 北京:清华大学出版社,2003:624–628.(WANG Xucheng. Finite element method[M]. Beijing:Tsinghua University Press,2003:624–628.(in Chinese))
[14] 罗晓辉,白世伟. 深基坑大变形耦合分析与数值模拟[J]. 岩土力学,2003,24(6):974–978.(LUO Xiaohui,BAI Shiwei. Coupling analysis and numerical simulation of large deformation of deep foundation pit[J]. Rock and Soil Mechanics,2003,24(6):974–978. (in Chinese))
[15] 谢永利. 大变形固结理论及其有限单元法[M]. 北京:人民交通出版社,1998:43–90.(XIE Yongli. The large deformation consolidation theory and its finite element method[M]. Beijing:China Communications Press,2004:43–90.(in Chinese))
[16] 薛新华. 岩土介质流–固耦合非线性损伤力学理论与数值分析[博士学位论文][D]. 杭州:浙江大学,2008.(XUE Xinhua. Nonlinear damage mechanics theory of coupled fluid-solid with numerical analysis of geo-materials[Ph. D. Thesis][D]. Hangzhou:Zhejiang University,2008.(in Chinese))
[17] 贾善坡,陈卫忠,于洪丹,等. 泥岩隧道施工过程中渗流场与应力场全耦合损伤模型研究[J]. 岩土力学,2009,30(1):19–26.(JIA Shanpo,CHEN Weizhong,YU Hongdan,et al. Research on seepage- stress coupling damage model of Boom clay during tunneling[J]. Rock and Soil Mechanics,2009,30(1):19–26.(in Chinese))
[18] Bernier F,Li X L,Verstricht J,et al. Clipex—clay instrumentation programme for the extension of an underground research laboratory[R]. [S.l.]:European Commission,2003.