Abstract:With the rapid development of Chinese hydropower construction,more and more large-scale projects encounter the stability problems of dynamo-relaxed rock mass. The deformation characteristics and failure mechanism of dynamo-relaxed rock mass are very complex. Based on the monitoring data and geology data of the tension-displaced rock mass on right bank at head area of Pubugou hydropower station,analysis method of the displacement characteristics and failure mechanism using monitoring data has been summarized. In addition,the comparative analyses of deformation characteristics are made to verify the method among the tension-displaced rock mass of Pubugou,the Geheyan Maoping landslide on Qingjiang River and the upstream slope of Pubugou rockfill dam. The results show that:(1) The tension-displaced rock mass moves in the way of blocks dislocation;and the slope terrain controls the direction of dislocation. (2) The failure mode of the tension-displaced rock mass is in the partially gradual way;and suddenly global failure can hardly happen. Nowadays,there are major differences in dislocation direction,dislocation time of rock mass at different locations. (3) Using the monitoring data from vertical inclinometer hole,dislocation zones are divided into two categories (I and II),and the class I is further divided into two sub-categories(I1 and I2). (4) The deep support using anchor cable should emphasize the identification of the type of dislocation zone and should especially control the Class I dislocation zone,and should emphasize the support of random bolting. (5) The tension-displaced rock mass is not sensitive to rainfall and to change in reservoir levels.
杨晓娟,邓建辉,陈 群,郑 俊. 瀑布沟水电站库首右岸拉裂变形体变形特征与分析[J]. 岩石力学与工程学报, 2013, 32(3): 549-561.
YANG Xiaojuan,DENG Jianhui,CHEN Qun,ZHENG Jun. CHARACTERISTICS AND ANALYSIS OF DEFORMATION OF TENSION-DISPLACED ROCK MASS ON RIGHT BANK AT HEAD AREA OF PUBUGOU HYDROPOWER STATION. , 2013, 32(3): 549-561.
[1] 韩文峰. 黄河黑山峡大柳树松动岩体工程地质研究[M]. 兰州:甘肃科学技术出版社,1993:1–16.(HAN Wenfeng. Research on the geology engineering of dynamo-relaxed rock mass at Heishan gorge on Yellow River[M]. Lanzhou:Gansu Science and Technology Press,1993:1–16.(in Chinese))
[2] 李雪峰,韩文峰,谌文武. 大柳树坝址松动岩体波速特征研究[J]. 岩石力学与工程学报,2006,25(3):596–600.(LI Xuefeng,HAN Wenfeng,SHEN Wenwu. Wave velocity characteristics of dynamo- relaxed rock mass at site of Daliushu dam[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(3):596–600.(in Chinese))
[3] 姚瑞卿,刘寒鹏,杨文婷,等. 大柳树坝址区松动岩体中硐室围岩破坏变形特征[J]. 长安大学学报:地球科学版,2003,25(1):62–65.(YAO Ruiqing,LIU Hanpeng,YANG Wenting,et al. The failure and deformation characters of wall rocks in adits of loosened rocks of Daliushu dam site[J]. Journal of Chang?an University:Earth Science,2003,25(1):62–65.(in Chinese))
[4] 李忠孝. 松动岩体堆积层的综合勘探[J]. 四川建筑,1995,15(2):40–43.(LI Zhongxiao. Comprehensive survey of dynamo-relaxed rock colluvial[J]. Sichuan Architecture,1995,15(2):40–43.(in Chinese))
[5] 祁生文,伍法权,兰恒星. 锦屏一级水电站普斯罗沟左岸深部裂缝成因的工程地质分析[J]. 岩土工程学报,2002,24(5):596–599.(QI Shengwen,WU Faquan,LAN Hengxing. Study on the mechanism of the deep fractures of the left abutment slope at the Jinping first stage hydropower station[J]. Chinese Journal of Geotechnical Engineering,2002,24(5):596–599.(in Chinese))
[6] 张连明,周 青. 直孔水电站右岸拉裂变形体的稳定性分析与支护措施[J]. 水电站设计,2007,23(1):66–71.(ZHANG Lianming,ZHOU Qing. Stability analysis and supporting measures of the tension-displaced body at Zhikong hydropower station[J]. Design of Hydroelectric Power Station,2007,23(1):66–71.(in Chinese))
[7] 胡耀飞,聂德新,沈军辉. 雅砻江牙根水电站拉裂松动岩体工程特性[J]. 人民黄河,2011,33(5):105–109.(HU Yaofei,NIE Dexin,SHEN Junhui. Engineering characteristics of the tension-slackened rock mass in Yagen hydropower station[J]. Yellow River,2011,33(5):105–109.(in Chinese))
[8] 徐文杰,胡瑞林,岳中琦,等. 虎跳峡龙蟠右岸边坡稳定性的数值模拟[J]. 岩土工程学报,2006,28(11):1 996–2 004.(XU Wenjie,HU Ruilin,YUE Zhongqi,et al. Numerical simulation on stability of right bank slope of Longpan in Tiger-leaping gorge area[J]. Chinese Journal of Geotechnical Engineering,2006,28(11):1 996–2 004.(in Chinese))
[9] 王勇智,戚 炜,门玉明,等. 黄河大柳树坝址岩体破坏机制动力模拟试验分析[J]. 地球科学与环境学报,2004,26(2):54–58. (WANG Yongzhi,QI Wei,MEN Yuming,et al. Dynamic simulation test analysis of destructive mechanism of rock mass at Daliushu dam site of Yellow River[J]. Journal of Earth Sciences and Environment,2004,26(2):54–58.(in Chinese))
[10] 曹林曦. 牙根水电站拉裂松动岩体稳定性研究[硕士学位论文][D]. 成都:四川大学,2009.(CAO Linxi. Stability analysis of the tension- slackened rock mass in Yagen hydropower station[M. S. Thesis][D]. Chengdu:Sichuan University,2009.(in Chinese))
[11] 况磊强,杨晓娟,费文平,等. 某水电站坝前右岸拉裂变形体稳定性分析[J]. 长江科学院院报,2010,27(7):47–50.(KUANG Leiqiang,YANG Xiaojuan,FEI Wenping,et al. Analysis of stability of tension fracture rock mass on right bank in front of some hydropower station[J]. Journal of Yangtze River Scientific Research Institute,2010,27(7):47–50.(in Chinese))
[12] 彭立威,汪家林,温 帅,等. 初次蓄水对瀑布沟库首拉裂体影响的监测分析[J]. 长江科学院院报,2011,28(4):20–24.(PENG Liwei,WANG Jialin,WEN Shuai,et al. Monitoring of the influence of first impoundment on tension-displaced body in front of Pubugou dam[J]. Journal of Yangtze River Scientific Research Institute,2011,28(4):20–24.(in Chinese))
[13] 段 韬,赵其华,张志龙. RaA氡气、甚低频测试在复核某电站库首变形体边界中的应用[J]. 水文地质工程地质,2005,(6):108–111.(DUAN Tao,ZHAO Qihua,ZHANG Zhilong. Application of RaA radon and VLF methods in the deformation and fracture mass boundary test of a hydroelectric station[J]. Hydrogeology and Engineering Geology,2005,(6):108–111.(in Chinese))
[14] 中国水电工程顾问集团成都勘测设计研究院. 四川大渡河瀑布沟水电站库首右岸拉裂变形体治理设计报告[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2005.(Hydrochina Chengdu Engineering Corporation. Design report of tension-displaced rock mass in front of Pubugou dam,Dadu River,Sichuan province[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2005.(in Chinese))
[15] 陈 鸿,赵其华,陈卫东. 某水电站库首右岸拉裂变形体形成机制研究[J]. 防灾减灾工程学报,2005,15(1):25–29.(CHEN Hong,ZHAO Qihua,CHEN Weidong. Forming mechanism of the tension- displaced body of a hydropower station slope[J]. Journal of Disaster Prevention and Mitigation Engineering,2005,15(1):25–29.(in Chinese))
[16] 邓建辉,马水山,张保军,等. 清江隔河岩水库茅坪滑坡复活机制初探[J]. 岩石力学与工程学报,2003,22(10):1 730–1 737.(DENG Jianhui,MA Shuishan,ZHANG Baojun,et al. Preliminary investigation on the reactivation of Maoping landslide[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1 730–1 737.(in Chinese))
[17] 中国水电工程顾问集团成都勘测设计研究院. 大渡河瀑布沟水电站砾石土心墙堆石坝坝体填筑施工技术要求[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2009.(HydroChina Chengdu Engineering Corporation. Filling construction technology requirements of Pubugou rockfill dam on Dadu River[R]. Chengdu:Hydrochina Chengdu Engineering Corporation,2009.(in Chinese))
[18] 王义锋. 基于测斜仪监测成果的蠕滑体变形机制分析[J]. 岩石力学与工程学报,2009,28(1):212–216.(WANG Yifeng. Analysis of creep deformation mechanism based on inclinometer monitoring results[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):212–216.(in Chinese))
[19] 应向东. 黄腊石滑坡深部位移监测分析[J]. 长江科学院院报,2000,17(2):54–56.(YING Xiangdong. Monitoring and analysis of deep-lying displacement of Huanglashi landslide[J]. Journal of Yangtze River Scientific Research Institute,2000,17(2):54–56.(in Chinese))
[20] 李 娜,孙建会, 熊成林,等. 马延坡滑坡体深部位移监测成果分析[J]. 水利水电技术,2009,40(4):46–50.(LI Na,SUN Jianhui,XIONG Chenglin,et al. Analysis of monitoring of deep displacement in Mayanpo potential landslide[J]. Water Resources and Hydropower Engineering,2009,40(4):46–50.(in Chinese))
[21] 文宝萍,申 健,谭建民. 水在千将坪滑坡中的作用机制[J]. 水文地质工程地质,2008,(3):12–17.(WEN Baoping,SHEN Jian,TAN Jianmin. The influence of water on the occurrence of Qianjiangping landslide[J]. Hydrogeology and Engineering Geology,2008,(3):12–17.(in Chinese))
[22] 殷跃平,彭轩明. 三峡库区千将坪滑坡失稳探讨[J]. 水文地质工程地质,2007,(3):51–54.(YIN Yueping,PENG Xuanming. Failure mechanism on Qianjiangping landslide in the Three Gorges Reservoir region[J]. Hydrogeology and Engineering Geology,2007,(3):51–54.(in Chinese))
[23] 王德咏,李 科. 库水位上升对千将坪滑坡的影响研究[J]. 灾害与防治工程,2007,(2):15–19.(WANG Deyong,LI Ke. Study on Qianjiangping landslide due to reservoir water level rise[J]. Disaster and Control Engineering,2007,(2):15–19.(in Chinese))