[1] 万 飞,谭忠盛,马 栋. 关角隧道F2–1断层破碎带支护结构优化设计[J]. 岩石力学与工程学报,2014,33(3):531–538.(WAN Fei,TAN Zhongsheng,MA Dong. Optimizing design of support structure for Guanjiao tunnel in fault-rupture zone F2–1[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):531–538.(in Chinese))
[2] 吴旭平,杨新安,李亚翠,等. 含软弱夹层浅埋隧道变形特性及控制指标研究[J]. 岩石力学与工程学报,2014,33(增1):2 685–2 691. (WU Xuping,YANG Xin¢an,LI Yacui et al. Research on control indices and deformation characteristic of shallow tunnel with weak interlayer[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):2 685–2 691.(in Chinese))
[3] BRUNEAU G,TYLER D B,HADJIGEORGIOU J,et al. Influence of faulting on a mine shaft—a case study:part I—background and instrumentation[J]. International Journal of Rock Mechanics and Mining Sciences,2003,40(1):95–111.
[4] 刘 辉,张智超. 2004–2008我国隧道施工事故统计分析[J]. 中国安全科学学报,2010,20(1):96–100.(LIU Hui,ZHANG Zhichao. Statistical analysis on safety accidents of tunnel construction from 2004 to 2008 in China[J]. China Safety Science Journal,2010,20(1):96–100.(in Chinese))
[5] 白浪峰,徐前卫,田龙岗,等. 软弱破碎连拱隧道松动区模型试验与分析[J]. 岩石力学与工程学报,2013,32(增2):3 610–3 618. (BAI Langfeng,XU Qianwei,TIAN Longgang,et al. Model test and analysis of loose zone in soft and cracked surrounding rock of multi-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(Supp.2):3 610–3 618.(in Chinese)
[6] JEON S,KIM J,SEO Y,et al. Effect of a fault and weak plane on the stability of a tunnel in rock—a scaled model test and numerical analysis[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(3):1–6.
[7] FEI W P,ZHANG L,ZHANG R. Experimental study on a geo-mechanical model of a high arch dam[J]. International Journal of Rock Mechanics and Mining Sciences,2010,47(2):299–306.
[8] 张志强,李 宁,陈方方,等. 不同围岩中软弱夹层对洞室围岩稳定性的影响[J]. 西北农林科技大学学报:自然科学版,2011,39(7):193–200.(ZHANG Zhiqiang,LI Ning,CHEN Fangfang,et al. Effect of weak interbed on tunnel stability in different graded surrounding rock mass[J]. Journal of Northwest A and F University:Natural Science,2011,39(7):193–200.(in Chinese))
[9] 郑颖人,王永甫,王 成. 节理岩体隧道的稳定分析与破坏规律探讨[J]. 地下空间与工程学报,2011,7(4):649–656.(ZHENG Yingren,WANG Yongfu,WANG Cheng. Stability analysis and exploration of failure law of jointed rock tunnel[J]. Chinese Journal of Underground Space and Engineering,2011,7(4):649–656.(in Chinese))
[10] JING L. Formulation of discontinuous deformation analysis (DDA)—an implicit discrete element model for block system[J]. Engineering Geology,1998,49(3/4),371–381.
[11] HUANG F,ZHU H H,XU Q W,et al. The effect of weak interlayer on the failure pattern of rock mass around tunnel—scaled model tests and numerical analysis[J]. Tunnelling and Underground Space Technology,2013,35(4):207–218.
[12] 古银城,李文华,李 昊. 断层与隧道相对距离对围岩稳定性影响的试验研究[J]. 现代隧道技术,2013,50(3):59–65.(GU Yincheng,LI Wenhua,LI Hao. Experimental study on the relative distance between a tunnel and a fault and subsequent effects on the stability of the surrounding rock[J]. Modern Tunnelling Technology,2013,50(3):59–65.(in Chinese))
[13] 李文华,李 昊,古银城,等. 断层对隧道围岩稳定性影响的有限元分析[J]. 施工技术,2013,42(7):93–110.(LI Wenhua,LI Hao,GU Yincheng,et al. Finite element analysis on the influence of fault to the stability of surrounding rock[J]. Construction Technology,2013,42(7):93–110.(in Chinese))
[14] 董方庭,宋宏伟,郭志宏,等. 巷道围岩松动圈支护理论[J]. 煤炭学报,1994,19(1):21–31.(DONG Fangting,SONG Hongwei,GUO Zhihong,et al. Roadway support theory based on broken rock zone[J]. Journal of China Coal Society,1994,19(1):21–31.(in Chinese))
[15] MEGUID M A,SAADA O,NUNES M A,et al. Physical modeling of tunnels in soft ground:A review[J]. Tunnelling and Underground Space Technology,2008,23(2),185–198.
[16] SITHARAM T G,SRIDEVI J,SHIMIZU N. Practical equivalent continuum characterization of jointed rock masses[J]. International Journal of Rock Mechanics and Mining Sciences,2001,38(3):437–448.
[17] ZHANG G Q. Rock failure with weak planes by self-locking concept[J]. International Journal of Rock Mechanics and Mining Sciences,2009,46(6),974–982.
[18] 朱合华,黄 锋,徐前卫. 变埋深下软弱破碎隧道围岩渐进性破坏试验与数值模拟[J]. 岩石力学与工程学报,2010,29(6):1 113– 1 122.(ZHU Hehua,HUANG Feng,XU Qianwei. Model test and numerical simulation for progressive failure of weak and fractured tunnel surrounding rock under different overburden depths[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 113– 1 122.(in Chinese))
[19] AYDAN Ö,AKAGI T,KAWAMOTO T. The squeezing potential of rocks around tunnels theory and prediction[J]. Rock Mechanics and Rock Engineering,1993,26(2):137–163.
[20] 邹红英,肖 明. 地下洞室开挖松动圈评估方法研究[J]. 岩石力学与工程学报,2010,29(3):513–519.(ZOU Hongying,XIAO Ming. Study of methodology for assessment of excavation disturbed zone of underground caverns[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):513–519.(in Chinese))
[21] HUANG Z P,BROCH E,LU M. Cavern roof stability mechanism of arching and stabilization by rock bolting[J]. Tunneling and Underground Space Technology,2002,17(3),249–261.
[22]
|