Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde hydropower station subjected to excavation
LI Ang1,2,DAI Feng1,2,XU Nuwen2,3,GU Gongkai4,LIU Ke4,LI Biao2
(1. School of Architecture and Environment,Sichuan University,Chengdu,Sichuan 610065,China;2. State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;3. Stake Key Laboratory of Geohazard Prevetion and Geoenvironment Protection,Chengdu,Sichuan 610059,China;4. China Three Gorges Corporation,Beijing,100038,China)
Abstract:The layout of the underground group caverns of Wudongde hydropower station at the right bank has a complicated form,and the structure-controlled failure phenomena occurred frequently due to the low stress condition and unfavorable formations of rock stratum,such as high dip angle and low strike angle. In this study,the modes and causes of failure of the surrounding rock near the downstream abutment of the main powerhouse at the right bank are systematically summarized with the geological data,field surveys,traditional monitoring,micro-seismic(MS) monitoring and numerical simulation. Firstly,the essential characteristics of the failure of surrounding rocks including the failure modes,spatial locations,scale of destruction and damage process,are summarized. Secondly,the temporal variation of the micro-seismic activity and the micro-seismic precursory characteristics of the failure of layered rock during the development of the studied failure are obtained. Finally,the flexural toppling failure of the surrounding rocks and the causes of this phenomena are revealed. The influence of rock structure on the failure of the surrounding rocks near the abutment is also discussed in detail by using a comprehensive method,which incorporates the micro-seismic monitoring and numerical simulation.
李 昂1,2,戴 峰1,2,徐奴文2,3,顾功开4,刘 科4,李 彪2. 乌东德水电站右岸地下厂房开挖围岩破坏模式及形成机制研究[J]. 岩石力学与工程学报, 2017, 36(4): 781-793.
LI Ang1,2,DAI Feng1,2,XU Nuwen2,3,GU Gongkai4,LIU Ke4,LI Biao2. Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde hydropower station subjected to excavation. , 2017, 36(4): 781-793.
[1] 周扬一,冯夏庭,徐鼎平,等. 含不同胶结充填物的碳酸盐岩层面剪切力学特性试验研究[J]. 岩石力学与工程学报,2016,35(6): 1 161–172.(ZHOU Yangyi,FENG Xiating,XU Dingping,et al. Experimental study on the shear behavior of carbonate bedding planes cemented by different materials[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(6):1 161–172.(in Chinese))
[2] 王启耀. 陡倾角层状岩体中大型地下洞室群围岩变形的预报与控制[博士学位论文][D]. 上海:同济大学,2004.(WANG Qiyao. The deformation prediction and control of surrounding rock mass of huge underground openings excavated in layered rock with steep dip angle[Ph. D. Thesis][D]. Shanghai:Tongji University,2004.(in Chinese))
[3] 丁秀丽,董志宏,卢 波,等. 陡倾角沉积岩地层中大型地下厂房开挖围岩变形失稳特征和反馈分析[J]. 岩石力学与工程学报,2008,27(10):2 019–2 026.(DING Xiuli,DONG Zhihong,LU Bo,et al. Deformation characteristics and feedback analysis of surrounding rock of large underground powerhouses excavated in steeply dipped sedimentary rock strata[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 019–2 026.(in Chinese))
[4] 李晓红,夏彬伟,李 丹,等. 深埋隧道层状围岩变形特征分析[J]. 岩土力学,2010,31(4):1 163–1 167(LI Xiaohong,XIA Binwei,LI Dan,et al. Deformation characteristics analysis of layered rockmass in deep buried tunnel[J]. Rock and Soil Mechanics,2010,31(4): 1 163–1 167. (in Chinese))
[5] 夏彬伟,胡 科,卢义玉,等. 深埋隧道层状岩体破坏过程特征模型试验[J]. 中国公路学报,2012,25(1):107–114.(XIA Binwei,HU Ke,LU Yiyu,et al. Model test for characteristics of failure process of layered rock mass in deep buried tunnel[J]. China Journal of Highway and Transport,2012,25(1):107–114.(in Chinese))
[6] 樊启祥,王义锋. 向家坝水电站地下厂房缓倾角层状围岩稳定分析[J]. 岩石力学与工程学报,2010,29(7):1 307–1 313.(FAN Qixiang,WANG Yifeng. Stability analysis of layered surrounding rock mass of large underground powerhouse of Xiangjiaba hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(7): 1 307–1 313.(in Chinese))
[7] 冷先伦,盛 谦,朱泽奇,等. 遍布节理对地下洞室群围岩稳定性的影响研究[J]. 土木工程学报,2009,42(9):96–103.(LENG Xianlun,SHENG Qian,ZHU Zeqi,et al. Effect of ubiquitous joints on the stability of surrounding rock mass of multiple underground caverns[J]. China civil engineering journal,2009,42(9):96–103.(in Chinese))
[8] 朱泽奇,盛 谦,梅松华,等. 改进的遍布节理模型及其在层状岩体地下工程中的应用[J]. 岩土力学,2009,30(10):3 115–3 122. (ZHU Zeqi,SHENG Qian,MEI Songhua,et al. Improved ubiquitous- joints model and its application to underground engineering in layered rock masses[J]. Rock and Soil Mechanics,2009,30(10):3 115–3 122. (in Chinese))
[9] 黄书岭,王继敏,丁秀丽,等. 基于层状岩体卸荷演化的锦屏I级地下厂房洞室群稳定性与调控[J]. 岩石力学与工程学报,2011,30(11):2 203–2 216.(HUANG Shuling,WANG Jimin,DING Xiuli,et al. Stability and control for underground caverns of Jinping I hydropower station based on unloading evolution of layered rockmass[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(11):2 203–2 216.(in Chinese))
[10] GAO F Q,DOUG S,JOHN C,et al. Evaluation of coal longwall caving characteristics using an innovative UDEC trigon approach[J]. Computers and Geotechnics,2014,55:448–460
[11] 郝宪杰,冯夏庭,周扬一,等. 节理间距对柱状节理玄武岩隧洞稳定的影响研究[J]. 岩石力学与工程学报,2015,34(增1):3 337– 3 347.(HAO Xianjie,FENG Xiating,ZHOU Yangyi,et al. Influence of joint space to stability of columnar jointed basaltic rock mass[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1):3 337–3 347.(in Chinese))
[12] HAO Y H,AZZAM R. The plastic zones and displacements around underground openings in rock masses containing a fault[J]. Tunnelling and Underground Space Technology,2005,20(1):49–61
[13] SHEN B,BARTON N. The disturbed zone around tunnels in jointed rock masses[J]. International Journal of Rock Mechanics and Mining Sciences,1997,34(1):117–125
[14] JIANG Y,TANABASHI Y,LI B,et al. Influence of geometrical distribution of rock joints on deformational behavior of underground opening[J]. Tunnelling and Underground Space Technology,2006,21(5):485–491
[15] ZHANG Z X,XU Y,KULATILAKE P,et al. Physical model test and numerical analysis on the behavior of stratified rock masses during underground excavation[J]. International Journal of Rock Mechanics and Mining Sciences,2012,49(49):134–147
[16] SAGONG M,PARK D,YOO J,et al. Experimental and numerical analyses of an opening in a jointed rock mass under biaxial compression[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(7):1 055–1 067
[17] 陈炳瑞,冯夏庭,曾雄辉,等. 深埋隧洞TBM掘进微震实时监测与特征分析[J]. 岩石力学与工程学报,2011,30(2):275–283. (CHEN Bingrui,FENG Xiating,ZENG Xionghui,et al. Real-time microseismic monitoring and its characteristic analysis during TBM tunneling in deep-buried tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(2):275–283.(in Chinese))
[18] 李 彪,戴 峰,徐奴文,等. 深埋地下厂房微震监测系统及其工程应用[J]. 岩石力学与工程学报,2014,33(增1):3 375–3 383.(LI Biao,DAI Feng,XU Nuwen,et al. Microseismic monitoring system and its engineering applications of deep-buried underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):3 375–3 383.(in Chinese))
[19] XU N W,LI T B,DAI F,et al. Microseismic monitoring and stability evaluation for the large scale underground caverns at the Houziyan hydropower station in Southwest China[J]. Engineering Geology,2015,188(7):48–67
[20] 戴 峰,李 彪,徐奴文,等. 白鹤滩水电站地下厂房开挖过程微震特征分析[J]. 岩石力学与工程学报,2016,35(4):692–703.(DAI Feng,LI Biao,XU Nuwen,et al. Microseismic characteristic analysis of underground powerhouse at Baihetan hydropower station subjected to excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(4):692–703.(in Chinese))
[21] FENG X T,CHEN B R,LI S J,et al. Studies on the evolution process of rockbursts in deep tunnels[J]. Journal of Rock Mechanics and Geotechnical Engineering,2012,4(4):289–295
[22] XIAO Y X,FENG X T,FENG G L,et al. Mechanism of evolution of stress-structure controlled collapse of surrounding rock in caverns:A case study from the Baihetan hydropower station in China[J]. Tunnelling and Underground Space Technology,2016,51:56–67.
[23] 张存慧,刘会波,张玲丽,等. 金沙江乌东德水电站地下厂房洞室群围岩稳定评价及支护设计优化专题报告[R]. 武汉:长江勘测规划设计研究有限责任公司,2015.(ZHANG Cunhui,LIU Huibo,ZHANG Lingli,et al. Study report of stability evaluation and design optimization for the large scale underground caverns at Wudongde hydropower station in Jinshajiang River[R]. Wuhan:Changjiang Institute of Survey,Planning,Design and Research,2015.(in Chinese))
[24] 韩晓玉,艾 凯,周春华. 金沙江乌东德水电站可行性研究阶段地应力测试总结报告[R]. 武汉:长江水利委员会长江科学院,2012.(HAN Xiaoyu,AI Kai,ZHOU Chunhua. Summary report of geostress condition during feasibility study period at Wudongde hydropower station in Jinshajiang River[R]. Wuhan:Changjiang River Scientific Institude of Changjiang Water Resources Commission,2012.(in Chinese))
[25] 向天兵,冯夏庭,江 权,等. 大型洞室群围岩破坏模式的动态识别与调控[J]. 岩石力学与工程学报,2011,30(5):871–883.(XIANG Tianbing,FENG Xiating,JIANG Quan,et al. Failure mode dynamic recognition and control for surrounding rock of large-scale cavern group[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(5):871–883.(in Chinese))
[26] 李兆锋. 金沙江乌东德水电站物探检测工程简报[R]. 武汉:长江勘测规划设计研究有限责任公司,2016.(LI Zhaofeng. Geophysical report of Wudongde hydropower station in Jinshajiang River[R]. Wuhan:Changjiang Institute of Survey,Planning,Design and Research,2016.(in Chinese))
[27] 向家菠,熊诗湖,汪 斌,等. 金沙江乌东德水电站可行性研究阶段坝址区岩体质量分级及参数选取专题研究报告[R]. 武汉:长江勘测规划设计研究有限责任公司,2015.(XIANG Jiabo,XIONG Shihu,WANG Bin,et al. Special report on rock mass quality classification and parameters selection of the dam site at Wudongde hydropower station along Jinsha River in the feasibility study stage[R]. Wuhan:Changjiang Institute of Survey,Planning,Design and Research,2015.(in Chinese))
[28] FENG G L,FENG X T,CHEN B R,et al. Microseismic sequences associated with rockbursts in the tunnels of the Jinping II hydropower station[J]. International Journal of Rock Mechanics and Mining Sciences,2015,80:89–100
[29] 钮新强,丁秀丽. 地下洞室围岩顶拱承载力学机制及稳定拱设计方法[J]. 岩石力学与工程学报,2013,32(4):775–786.(NIU Xinqiang,DING Xiuli. Bearing mechanism of top arch and stable arch design method for surrounding rock of underground caverns[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(4):775–786. (in Chinese))