[1] |
王梦恕. 中国铁路、隧道与地下空间发展概况[J]. 隧道建设,2010,30(4):351-364.(WANG Mengsh. An overview of development of railways,tunnels and underground works inChina[J]. Tunnel Construction,2010,30(4):351-364.(in Chinese))
|
[2] |
李术才,石少帅,李利平,等. 三峡库区典型岩溶隧道突涌水灾害防治与应用[J]. 岩石力学与工程学报,2014,33(9):1 887-1 895. (LI Shucai,SHI Shaoshuai,LI Liping,et al. Control of water inrush in typical karst tunnels in three gorges reservoir area and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(9):1 887-1 895.(in Chinese))
|
[3] |
李术才,周宗青,李利平,等. 岩溶隧道突水风险评价理论与方法及工程应用[J]. 岩石力学与工程学报,2013,32(9):1 858-1 867. (LI Shucai,ZHOUZongqing,LI Liping,et al. Risk evaluation theory and method of water inrush in karst tunnel and its applications[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(9):1 858-1 867.(in Chinese))
|
[4] |
李术才,薛翊国,张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报,2008,27(7):1 297-1 307.(LI Shucai,XUE Yiguo,ZHANGQingsong,et al. Key technology study on comprehensiveprediction and early_warning of geological hazards during tunnel construction in high_risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297-1 307.(in Chinese))
|
[5] |
李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217-225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst_fracturedgroundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-225.(in Chinese))
|
[6] |
石少帅,李术才,李利平,等. 岩溶区隧道暗河的综合预报及治理方案研究[J]. 岩土力学,2012,33(1):227-232.(SHI Shaoshuai,LI Shucai,LI Liping,et al.Comprehensive geological prediction and management of underground river in karst areas[J].Rock and Soil Mechanics,2012,33(1):227-232.(in Chinese))
|
[7] |
石少帅. 深长隧道充填型致灾构造渗透失稳突涌水机理与风险控制及工程应用[博士学位论文][D]. 济南:山东大学,2014.(SHI Shaoshuai.Study on seepage failure mechanisim and risk control of water inrush induced by filled disaster structure in deep_tunnel and engineering application[Ph. D. Thesis][D]. Jinan:Shandong University,2014.(in Chinese))
|
[1] |
朱维申,张乾兵,李 勇,等. 真三轴荷载条件下大型地质力学模型试验系统的研制及其应用[J]. 岩石力学与工程学报,2010,29(1):1-7.(ZHU Weishen,ZHANG Qianbing,LI Yong,et al. Development of large_scalegeomechanical model test system under true triaxial loading and its application loading and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(1):1-7.(in Chinese))
|
[2] |
朱维申,李 勇,张 磊,等.高地应力条件下洞群稳定性的地质力学模型试验研究[J]. 岩石力学与工程学报,2008,27(7):1 308-1 314.(ZHUWeishen,LI Yong,ZHANG Lei,et al. Geomechanical model test on stability of cavern group under high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 308-1 314.(in Chinese))
|
[8] |
张庆松,王德明,李术才,等. 断层破碎带隧道突水突泥模型试验系统研制与应用[J]. 岩土工程学报,2017,39(3):417-426. (ZHANG Qingsong,WANG Deming,LI Shucai,et al. Development and application of model test system for inrush of water and mud of tunnel in fault rupture zone[J]. Chinese Journal of Geotechnical Engineering,2017,39(3):417-426. (in Chinese))
|
[9] |
李术才,王 凯,李利平,等. 海底隧道新型可拓展突水模型试验系统的研制及应用[J]. 岩石力学与工程学报,2014,33(12):2 409-2 418.(LI Shucai,WANG Kai,LI Liping,et al. Development and application of an extendable model test system for water inrush simulation in subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,,2014,33(12):2 409-2 418.(in Chinese))
|
[10] |
李术才,宋曙光,李利平,等. 海底隧道流固耦合模型试验系统的研制及应用[J]. 岩石力学与工程学报,2013,32(5):883-890.(LI Shucai,SONG Shuguang,LI Liping,et al. Development on subsea tunnel model test system for solid_fluid coupling and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(5):883-890.(in Chinese))
|
[11] |
李 浪,戎晓力,王明洋,等. 深长隧道突水地质灾害三维模型试验系统研制及其应用[J]. 岩石力学与工程学报,2016,35(3):491-497.(LI Lang,RONG Xiaoli,WANG Mingyang et al. Development and application of 3D model test system for water inrush geohazards in long and deep tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(3):491-497.(in Chinese))
|
[12] |
张强勇,向 文,张 岳,等. 超高压智能数控真三维加载模型试验系统的研制及应用[J].岩石力学与工程学报,2016,35(8):1 628-1 637.(ZHANG Qiangyong,XIANG Wen,ZHANG Yue,et al. Development and application of ultra high pressure 3D loading model test system with intelligent numerical control function[J]. Chinese Journal of Rock Mechanicsand Engineering,2016,35(8):1 628-1 637.(in Chinese))
|
[13] |
张强勇,陈旭光,林 波,等. 高地应力真三维加载模型试验系统的研制及其应用[J]. 岩土工程学报,2010,32(10):1 588-1 593. (ZHANG Qiangyong,CHEN Xuguang,LIN Bo,et al. Development and application of high-geostress true 3D loadinggeomechanicsmodel test system[J]. Chinese Journal of Geotechnical Engineering,2010,32(10):1 588-1 593.(in Chinese))
|
[14] |
李利平,李术才,赵 勇,等. 超大断面隧道软弱破碎围岩渐进破坏过程三维地质力学模型试验研究[J]. 岩石力学与工程学报,2012,31(3):550-560.(LI Liping,LI Shucai,ZHAO Yong,et al. 3D geomechanical model for progressive failure progress of weak broken surrounding rock in super large section tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(3):550-560.(in Chinese))
|
[15] |
陈 菲,何 川,邓建辉. 高地应力定义及其定性定量判据[J]. 岩土力学,2015,36(4):971-980.(CHEN Fei,HE Chuan,DENG Jianhui.Concept of high geostress and its qualitative and quantitative definitions[J]. Rock and Soil Mechanic,2015,36(4):971-980.(in Chinese))
|
[16] |
范鹏贤,王明洋,方 向. 深部工程模型试验的边界条件及其模拟方法探讨[J]. 采矿与安全工程学报,2016,33(1):146-151.(FAN Pengxian,WANG Mingyang,FANGXiang.The boundary conditions of model test for deep engineeringand its simulation methods[J].Journalof Mining andSafety Engineering,2016,33(1):146-151.(in Chinese))
|
[1] |
李术才,袁永才,李利平,等. 钻爆施工条件下岩溶隧道掌子面突水机制及最小安全厚度研究[J]. 岩土工程学报,2015,37(2):313-320.(LI Shucai,YUAN Yongcai,LI Liping,et al.Water inrush mechanism and minimum safe thickness of rock wall of karst tunnel face under blast excavation[J]. Chinese Journal of Geotechnical Engineering,2015,37(2):313-320.(in Chinese))
|
[2] |
沈 泰. 地质力学模型试验技术的进展[J].长江科学院院报,2001,18(5):32-36.(SHEN Tai. Development of geomechanic model experiment techniques[J].Journal of Yangtze River Scientific Research Institute,2001,18(5):32-36. (in Chinese))
|